TenderDekho Logo
GEM

Indian Army Department Of Military Affairs TAPPER ROLLER BEARING & SYNCHRONIZER SET Tender 2025

Bid Publish Date

04-Nov-2025, 11:30 am

Bid End Date

14-Nov-2025, 12:00 pm

Progress

Issue04-Nov-2025, 11:30 am
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

24

Category

TAPPER ROLLER BEARING

Bid Type

Single Packet Bid

Key Highlights

  • Critical clause: quantity can be increased/decreased by up to 25% at contract award and during currency
  • Advance sample regime: 13–15 samples within 5 days; approvals or modifications within 5 days; bulk supply must align with approved sample
  • Delivery timing mechanics: start from last date of original delivery order; minimum extension 30 days
  • Penalty/LD regime not explicitly stated; delays due to buyer sample approvals shift timelines without LD
  • Sample costs: contractor bears bulk-sample testing costs; pre-supply costs before unconditional approval not reimbursed
  • Multiple catalog items; 18 total BINs with undefined unit quantities in the provided data
  • Clothing inspection terms may apply if pre-dispatch inspection is chosen

Categories 28

Tender Overview

The Indian Army, Department Of Military Affairs, seeks procurement across multiple automotive and powertrain components, including TAPPER ROLLER BEARING, ROLLER SET TC, SYNCHRORING 1 2 3 CARBON LINING, SYNCRONIZER SET, FILTER FUEL, FUEL WATER SEPARATOR, AIR PRESSURE PIPE ASSY, REAR WIPER BLADE ASSY, MAJOR SEAL KIT STEERING GEAR BOX, SOLENOID OPERATED VALVE, BRAKE BOOSTER KIT, and BEARING NEEDLE. The BOQ comprises 18 items total, with no specified individual quantities in the provided data. The tender is issued for the Indian Army under the Department Of Military Affairs with a broad product-category focus on high-precision mechanical components used in defense platforms. The scope emphasizes compatibility with standard military supply chains and adherence to buyer-specified testing and approval processes. A key differentiator is the inclusion of an option clause for quantity variations up to 25%, both at award and during contract currency. The advance sample requirement, once the contract is awarded, adds a preliminary quality gate to bulk production. Unique clauses cover sample approval timelines and potential re-sampling if deviations occur.

Technical Specifications & Requirements

  • Product/service names from the title/BOQ include: TAPPER ROLLER BEARING, ROLLER SET TC, SYNCHRORING 1 2 3 CARBON LINING, SYNCRONIZER SET, FILTER FUEL, FUEL WATER SEPARATOR, AIR PRESSURE PIPE ASSY, REAR WIPER BLADE ASSY, MAJOR SEAL KIT STEERING GEAR BOX, SOLENOID OPERATED VALVE, BRAKE BOOSTER KIT, BEARING NEEDLE.
  • BOQ comprises 18 items; specific unit quantities are not disclosed in the data.
  • The specification gate includes a mandatory advance sample approval process: submit 13–15 samples within 5 days of award; approval or modification list provided within 5 days; bulk supply must match approved sample; delays in buyer approvals may shift delivery periods without LD.
  • Pricing/quantities are handled via a quantity variation option of up to 25% during both initial contract and currency, with delivery extending from the last date of the original/extended delivery orders.
  • No technical standards or measurement specifications are listed in the provided data; bidders should prepare to demonstrate compatibility with standard defense-grade mechanical components and supplier qualification alignment with Army procurement practices.

Terms, Conditions & Eligibility

  • Quantity variation allowed up to 25% of bid and contracted quantities.
  • Delivery period begins from the last date of the original delivery order; extended-period calculations apply with a minimum of 30 days.
  • If the option clause is exercised, the additional time is proportionate to the increased quantity and original delivery period, subject to a 30-day minimum.
  • Post-award, bidders must submit 13–15 advance samples within 5 days; buyer approves or provides a modification list within 5 days; bulk supply must conform to approved samples.
  • If the buyer delays in sample approval, the delivery period is refixed without LD for the delay; if samples have major deviations, the buyer may require fresh samples or terminate the contract.
  • Samples required for testing are to be supplied by the contractor free of cost; any pre-supply manufacturing costs prior to unconditional approval are borne by the seller.
  • Clothing-related inspection terms mention reference samples and pre-dispatch inspection if selected by the bidder; reference samples will be provided to each consignee for lot comparison.

Key Specifications

  • Product/service categories include: TAPPER ROLLER BEARING, ROLLER SET TC, SYNCHRORING 1 2 3 CARBON LINING, SYNCRONIZER SET, FUEL FILTER, FUEL WATER SEPARATOR, AIR PRESSURE PIPE ASSY, REAR WIPER BLADE, SEAL KIT for steering gear, SOLENOID VALVE, BRAKE BOOSTER, BEARING NEEDLE

  • Total BOQ items: 18

  • Advance sample submission: 13–15 samples within 5 days of award

  • Delivery period adjustments: 25% quantity variation, minimum 30 days extension

  • No explicit technical standards listed in data; bidders should rely on standard defense-quality parts specifications

Terms & Conditions

  • 25% quantity variation rights across contract lifecycle

  • Advance sample approval process with strict 5-day turnaround

  • Delivery period reset rules tied to sample approval and extended quantity changes

Important Clauses

Payment Terms

Advance sample approval milestones and bulk supply alignment; no explicit payment terms stated in provided data

Delivery Schedule

Delivery starts from last date of original delivery order; extended delivery time formula applies with minimum 30 days

Penalties/Liquidated Damages

Not explicitly detailed in the data; potential for schedule adjustments based on buyer sample approval delays

Bidder Eligibility

  • Experience in supplying defense-grade mechanical components or equivalent to government entities

  • Valid GST registration and financial stability proofs

  • Authorized OEM-part qualifications or distributor credentials

Documents 5

GeM-Bidding-8545966.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

ASSY UNIVERSAL JOINT,AIR PRESSURE PIPE,BEARING BUSH CE,ASSY RELEASE BEARING,WIPER BLADE REAR,KIT PA

Indian Army

KAMRUP, ASSAM

Posted: 12 May 2025
Closed: 2 June 2025
GEM

KNUCKLE BEARING,OIL FILTER,FUEL FILTER,AIR FILTER,HUB OIL SEAL,BRAKE PAD SET,WIPER BLADE FRONT,WIPE

Indian Army

ALWAR, RAJASTHAN

Posted: 24 July 2025
Closed: 4 August 2025
GEM

Pump Assy Fuel,Tapper Roller Bearing,Cable Speedometer,Seal Kit Steering Gear,Accelerator Cable,Loc

Indian Army

BAREILLY, UTTAR PRADESH

Posted: 4 July 2025
Closed: 8 July 2025
GEM

TAPPER ROLLER BEARING FRONT HUB,PAD ASSY SET,FIXING BRACKET ASSY,CYLINDER HEAD GASKET MLS REINZ EUR

Indian Army

JHANSI, UTTAR PRADESH

Posted: 20 July 2025
Closed: 31 July 2025
GEM

Brg Front Wheel,Brg Tapper Roller,Oil Seal,Knuckle Bush Kit,Steering Gear Box Seal,Disc Clutch,Cabl

Indian Army

Posted: 20 November 2024
Closed: 11 December 2024
GEM

Bill of Quantities (BOQ) 18 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 TAPPER ROLLER BEARING TAPPER ROLLER BEARING 1 pieces rajeshwar1985 15
2 ROLLER SET TC ROLLER SET TC 4 pieces rajeshwar1985 15
3 SYNCHRORING 1 2 3 CARBON LINING SYNCHRORING 1 2 3 CARBON LINING 1 pieces rajeshwar1985 15
4 SYNCHRORING SYNCHRORING 1 pieces rajeshwar1985 15
5 SYNCRONIZER SLEEVE TC SYNCRONIZER SLEEVE TC 1 pieces rajeshwar1985 15
6 DISTANCE PIECE DISTANCE PIECE 1 pieces rajeshwar1985 15
7 HELICAL GEAR 3RD SPEED HELICAL GEAR 3RD SPEED 1 pieces rajeshwar1985 15
8 HELICAL GEAR 2ND SPEED HELICAL GEAR 2ND SPEED 1 pieces rajeshwar1985 15
9 SYNCHRORING 5TH SPEED SYNCHRORING 5TH SPEED 1 pieces rajeshwar1985 15
10 SYNCRONIZER SET SYNCRONIZER SET 2 pieces rajeshwar1985 15
11 FILTER FUEL FILTER FUEL 1 pieces rajeshwar1985 15
12 FUEL WATER SEPRATOR FUEL WATER SEPRATOR 1 pieces rajeshwar1985 15
13 AIR PRESSURE PIPE ASSY AIR PRESSURE PIPE ASSY 1 pieces rajeshwar1985 15
14 REAR WIPER BLADE ASSY REAR WIPER BLADE ASSY 2 pieces rajeshwar1985 15
15 MAJOR SEAL KIT STEERING GEAR BOX MAJOR SEAL KIT STEERING GEAR BOX 1 pieces rajeshwar1985 15
16 SOLENOID OPRATED VALVE SOLENOID OPRATED VALVE 1 pieces rajeshwar1985 15
17 BRAKE BOOSTER KIT BRAKE BOOSTER KIT 2 pieces rajeshwar1985 15
18 BEARING NEEDLE BEARING NEEDLE 1 pieces rajeshwar1985 15

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar procurements

4

Financial statements / turnover documentation

5

EMD/Security deposit details

6

Technical bid documents demonstrating compliance with requested items

7

OEM authorization/authorized distributorship certificates

8

Any testing/quality certificates relevant to defense components

Financial Results

Rank Seller Price Item
L1M/S M. K. ENTERPRISES   Under PMA₹42,500Item Categories : TAPPER ROLLER BEARING,ROLLER SET TC,SYNCHRORING 1 2 3 CARBON LINING,SYNCHRORING,SYNCRONIZER SLEEVE
L2PITAMBRA TRADERS (MSE)( MSE Social Category:General )    Under PMA₹44,870Item Categories : TAPPER ROLLER BEARING,ROLLER SET TC,SYNCHRORING 1 2 3 CARBON LINING,SYNCHRORING,SYNCRONIZER SLEEVE
L3M/S KARTIK SALES CORPORATION (MSE)( MSE Social Category:General )    Under PMA₹47,370Item Categories : TAPPER ROLLER BEARING,ROLLER SET TC,SYNCHRORING 1 2 3 CARBON LINING,SYNCHRORING,SYNCRONIZER SLEEVE

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for the Indian Army TAPPER ROLLER BEARING tender in 2025?

Bidders must submit GST, PAN, experience certificates, and financial statements along with a technical bid demonstrating compatibility with defense-grade components. Ensure OEM authorizations are attached, and provide evidence of prior similar procurements. The process includes an advance sample phase with 13–15 samples due within 5 days post award.

What documents are required for the Indian Army synchronization components tender in 2025?

Required documents include GST registration, PAN card, company financial statements, experience certificates for similar projects, EMD details, technical compliance documents, and OEM authorization. Ensure submission of all 18 BOQ item descriptions and any quality certifications relevant to defense parts.

What are the delivery terms for the Indian Army gear components tender 2025?

Delivery starts after the last date of the original delivery order with a minimum extension of 30 days. Quantity may be increased up to 25% during contract and currency. Extended timing is calculated as (Increased quantity / Original quantity) × Original delivery period, subject to minimum 30 days.

What standards or certifications are required for the defense components tender in 2025?

The tender data lists no explicit standards in the provided text. bidders should align with typical defense-grade requirements and provide OEM authorizations and quality-control certifications. Ensure products meet any IS or military-grade prerequisites specified by the buyer during bid submission.

How does advance sample approval affect delivery timelines for this Army tender?

After award, supply 13–15 samples within 5 days. Buyer approvals or modification lists are provided within 5 days. If there is buyer delay, the delivery period is refixed without liquidated damages; if samples deviate, supplier may be asked for fresh samples or contract termination may occur.

What is the scope of quantity variation permissible in this Indian Army tender?

The purchaser reserves the right to increase or decrease quantities up to 25% of bid quantity at contract award and during currency at contracted rates. This impacts delivery planning and pricing while maintaining unit rates.

What are the key eligibility criteria for suppliers in this defense components tender?

Eligible bidders should have government or defense-facing procurement experience, valid GST/PAN, financial stability, and OEM authorization or approved distributorship. Demonstrated capability to supply multi-item defense components like bearings, synchronizers, and fuel filtration is essential.

What is required for pre-dispatch inspection in clothing-related terms for this tender?

If pre-dispatch inspection is chosen, the Inspection Agency provides reference samples per consignee. The lot must align with sealed reference samples; ensure readiness to supply reference samples and comply with inspection outcomes to avoid supply delays.