TenderDekho Logo
Active GEM

UP Cooperative Sugar Factories Federation Limited Needle Lever Parts Tender BUDAUN Uttar Pradesh 2026

Bid Publish Date

17-Oct-2026, 3:47 pm

Bid End Date

27-Oct-2026, 4:00 pm

Progress

Issue17-Oct-2026, 3:47 pm
AwardPending

Tender Overview

Organization: Uttar Pradesh Cooperative Sugar Factories Federation Limited**, BUDAUN, Uttar Pradesh 202421. Procurement category: needle lever bolts, feed lift assemblies, looper rockers, stopper assemblies, pressure bar columns, stitch regulating studs, lever handles, cranks, shafts, and related chain/assembly components. Tender scope: 44 BOQ items with 44 entries totaling diverse looper and chain components; no explicit estimated value or EMD disclosed. Delivery flexibility: option to increase quantity up to 25% of bid quantity during contract and currency, at contracted rates. Context: standard supply contract for bolt and lever assemblies used in stitching/looper systems. Unique clause: option-based delivery adjustments with minimum extension of 30 days.

Technical Specifications & Requirements

  • Product scope: 44 items including needle lever balls, looper shaft forks, thread cut off assemblies, conveyor chains with slates, idler shafts, return rollers, and associated fittings.
  • Delivery terms: delivery period linked to last date of original delivery order; option-adjusted timeline uses the formula: (increased quantity ÷ original quantity) × original delivery period, minimum 30 days.
  • Special terms: ATC uploaded; bidder must comply with Buyer Added Bid Specific terms, including quantity variation and delivery extensions.
  • Standards/certifications: Not specified in the data; bidders should review ATC for any compliance expectations.
  • Quality/compatibility: Items appear as mechanical assemblies requiring precise dimensions and OEM compatibility; verify with BOQ and ATC documents.

Terms, Conditions & Eligibility

  • EMD/securement: Not disclosed in the provided data; verify in ATC.
  • Eligibility criteria: Compliance with option clause and delivery calculation; adherence to terms of the ATC; demonstration of capability to supply 44 item types.
  • Delivery schedule: Base delivery timeline aligned with original order; extended time via option clause subject to minimum 30 days.
  • Payment terms: Not specified in the supplied data; bidders must consult ATC for payment schedule.
  • Documents: Review ATC for required bids, GST, PAN, experience certificates, and OEM authorizations.
  • Penalties/warranties: Not specified; refer to ATC for LD or warranty provisions.

Key Specifications

  • Product scope includes: needle lever bolts, feed lift assemblies, looper rockers, stopper assemblies, pressure bar columns, stitch regulating studs, lever handles, crank connecting rods, thread adjusters, looper shafts, conveyors with slates, chain end brackets with sprockets, return rollers, and related components

  • Quantity/BOQ: Total Items 44; exact quantities not disclosed in dataset; verify in BOQ and ATC

  • Delivery time flexibility: 25% quantity variation; delivery period calculated as (increased quantity ÷ original quantity) × original delivery period with minimum 30 days

  • EMD/finance: Not disclosed in data; refer to ATC for exact EMD amount and method of submission

  • Standards/acceptance: No explicit standards listed; bidders to validate fitment with existing UP sugar factory equipment

Terms & Conditions

  • Option to increase/decrease quantity by up to 25% at contract award and during currency

  • Delivery period aligned to original order; extensions based on the option clause with a minimum 30 days

  • ATC terms govern submission, documentation, and any specific compliance requirements

Important Clauses

Payment Terms

Payment terms to be detailed in ATC; bidders must review for milestone payments and any advance release conditions

Delivery Schedule

Delivery period starts from last date of original delivery order; extended delivery time calculated by the option formula with a 30-day minimum

Penalties/Liquidated Damages

LD details and penalties to be specified in ATC; bidders must verify applicable penalties for late delivery or non-conformance

Bidder Eligibility

  • Ability to supply 44 different item types including complex assemblies

  • Compliance with option-based quantity adjustments across contract duration

  • Submission of mandatory documents as per ATC (GST, PAN, experience, OEM authorizations)

Advertisement

Tender Data

Bid Details

Quantity

221

Category

Needle lever bolt

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Needle lever bolt , Feed lift came , Feed lift U-fork , Looper rocker holder , Stopper assembly , Pressure bar column , Stitch regulating stud assembly , Pressure bar holder complete with column , Lever handle , Crank connecting rod , Thread adjuster , Pressure bar holder , Rocker for looper drive lever shaft , Needle bar with nut , Lifting lever hanger , Nut set , Stud set , Looper stud complete holder , Looper shaft fork , Take up complete assembly , Shaft for looper rocker stud , Crank connecting rod with shall and needle lever , Ball looper carrier rod joint assembly , Looper shaft for looper holder , Connecting bearing , Connecting assembly for chain outer drive , Needle connecting rod , Wood ruff key , Connecting assembly , Needle holder , Union elbow , Thread cut off assembly , Sleeve assembly complete , Needle lever ball link , Arm shaft with collar , Shall assembly for rocker , Conveyor chain complete fitted with slates , Chain end bracket complete with sprocket, shaft and bearings , Idler shaft with collars , Return rollers , Double action foot switch , Driving chain , Needle GB-250 Big , Needle GB-250 Small

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Budaun

Delivery Pincodes

243601

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Zubair Saifee243601,The Kisan Sahkari Chini Mills Ltd. Sheikhupur Badaun Pin 243601 GST No 09AAAAT9678A1Z7 Contact No 9368052768, 7880888951,7880888955BudaunUttar Pradesh243601415-

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10052709.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

N/a

Office Name

Lucknow

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 44 Items Sign in for GEM prices

#1

Needle lever bolt

Needle lever bolt

4 nos Delivery: 15 days
#2

Feed lift came

Feed lift came

4 nos Delivery: 15 days
#3

Feed lift U-fork

Feed lift U-fork

4 nos Delivery: 15 days
#4

Looper rocker holder

Looper rocker holder

4 nos Delivery: 15 days
#5

Stopper assembly

Stopper assembly

3 nos Delivery: 15 days
#6

Pressure bar column

Pressure bar column

4 nos Delivery: 15 days
#7

Stitch regulating stud assembly

Stitch regulating stud assembly

4 nos Delivery: 15 days
#8

Pressure bar holder complete with column

Pressure bar holder complete with column

4 nos Delivery: 15 days
#9

Lever handle

Lever handle

4 nos Delivery: 15 days
#10

Crank connecting rod

Crank connecting rod

4 nos Delivery: 15 days
#11

Thread adjuster

Thread adjuster

12 nos Delivery: 15 days
#12

Pressure bar holder

Pressure bar holder

8 nos Delivery: 15 days
#13

Rocker for looper drive lever shaft

Rocker for looper drive lever shaft

4 nos Delivery: 15 days
#14

Needle bar with nut

Needle bar with nut

4 nos Delivery: 15 days
#15

Lifting lever hanger

Lifting lever hanger

4 nos Delivery: 15 days
#16

Nut set

Nut set

4 nos Delivery: 15 days
#17

Stud set

Stud set

4 nos Delivery: 15 days
#18

Looper stud complete holder

Looper stud complete holder

4 nos Delivery: 15 days
#19

Looper shaft fork

Looper shaft fork

4 nos Delivery: 15 days
#20

Take up complete assembly

Take up complete assembly

4 nos Delivery: 15 days
#21

Shaft for looper rocker stud

Shaft for looper rocker stud

4 nos Delivery: 15 days
#22

Crank connecting rod with shall and needle lever

Crank connecting rod with shall and needle lever

4 nos Delivery: 15 days
#23

Ball looper carrier rod joint assembly

Ball looper carrier rod joint assembly

4 nos Delivery: 15 days
#24

Looper shaft for looper holder

Looper shaft for looper holder

4 nos Delivery: 15 days
#25

Connecting bearing

Connecting bearing

3 nos Delivery: 15 days
#26

Connecting assembly for chain outer drive

Connecting assembly for chain outer drive

3 nos Delivery: 15 days
#27

Needle connecting rod

Needle connecting rod

3 nos Delivery: 15 days
#28

Wood ruff key

Wood ruff key

4 nos Delivery: 15 days
#29

Connecting assembly

Connecting assembly

4 nos Delivery: 15 days
#30

Needle holder

Needle holder

4 nos Delivery: 15 days
#31

Union elbow

Union elbow

4 nos Delivery: 15 days
#32

Thread cut off assembly

Thread cut off assembly

3 nos Delivery: 15 days
#33

Sleeve assembly complete

Sleeve assembly complete

3 nos Delivery: 15 days
#34

Needle lever ball link

Needle lever ball link

4 nos Delivery: 15 days
#35

Arm shaft with collar

Arm shaft with collar

4 nos Delivery: 15 days
#36

Shall assembly for rocker

Shall assembly for rocker

4 nos Delivery: 15 days
#37

Conveyor chain complete fitted with slates

Conveyor chain complete fitted with slates

6 mtrs Delivery: 15 days
#38

Chain end bracket complete with sprocket, shaft and bearings

Chain end bracket complete with sprocket, shaft and bearings

1 nos Delivery: 15 days
#39

Idler shaft with collars

Idler shaft with collars

2 nos Delivery: 15 days
#40

Return rollers

Return rollers

10 nos Delivery: 15 days
#41

Double action foot switch

Double action foot switch

1 nos Delivery: 15 days
#42

Driving chain

Driving chain

1 nos Delivery: 15 days
#43

Needle GB-250 Big

Needle GB-250 Big

25 nos Delivery: 15 days
#44

Needle GB-250 Small

Needle GB-250 Small

25 nos Delivery: 15 days
Advertisement

Categories 19

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates (similar supply capabilities)

4

Financial statements (as required in ATC)

5

EMD/Security deposit documentation (per ATC)

6

Technical bid documents

7

OEM authorizations or dealer licenses (if applicable)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What documents are required for the tender in Budaund UP sugar facilities?

Bidders must submit GST registration, PAN, experience certificates, financial statements, EMD documents, technical bid, and OEM authorizations as specified in the ATC. Ensure all documents align with the 44-item BOQ requirements and verify any project-specific clauses.

How is delivery time calculated under the option clause in this tender?

Delivery time extends by the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. The Purchaser can adjust quantities by up to 25% during and after contracting, impacting lead times.

What are the critical eligibility criteria for supplying looper and lever assemblies?

bidders must demonstrate capability to supply 44 item types, comply with the option-quantity clause, and provide OEM authorizations and relevant experience certificates showing prior similar supply, with GST and financial documents as required by ATC.

What is the minimum delivery extension period in this UP tender?

The minimum extension period under the option clause is 30 days, applicable when increased quantities trigger additional delivery time, ensuring a baseline schedule adjustment.

What standards or certifications are explicitly required for this Uttar Pradesh tender?

The dataset lists no explicit standard; bidders should review the ATC for any required certifications (e.g., OEM approvals or industry norms) and confirm ISI/ISO if referenced in the ATC documents.

How can bidders participate in the 44-item UP sugar factory procurement?

Prepare and submit the required ATC-compliant bid package, including technical bids, EMD, OEM authorizations, and all mandatory documents. Ensure quantities align with the 25% variation clause and confirm delivery terms per the original order and ATC guidance.

What are the key components included in the tender BOQ items?

Key components span needle lever bolts, feed lift assemblies, looper rocker holders, pressure bar columns, stitch regulating studs, lever handles, crank connecting rods, thread cut off assemblies, and conveyor chain assemblies with slates and sprockets.

When is the bid submission deadline for the UP tender in Budan UP 2026?

Bid deadlines are governed by the ATC; the basic dataset does not specify a date. Review the ATC document uploaded by the buyer for exact submission deadlines, format, and submission portal instructions.

Advertisement