UPPCL (Uttar Pradesh Power Corporation Limited), Energy Department, invites bids for repair, maintenance, and installation services covering plant systems, transmission substations, switchyards, power houses, and related electrical installations. Estimated value is ₹312,651 with no BOQ items published. The procurement focuses on service-provider execution for electrical system works within Uttar Pradesh. A key differentiator is the flexibility to adjust contract quantity or duration by up to 25%, either before award or after contract issuance, increasing scope with mutual consent for lumpsum services. EMD submission can be completed online via RTGS/Internet banking to the account of the Executive Engineer, Electricity Transmission Division Gonda, with a named bidder reference and proof uploaded. This tender emphasizes mandatory certificate uploads and timely security deposit arrangements, including an alternative Fixed Deposit Receipt (FDR) as security. Unique ATC terms require adherence to the attached documents and ATC corrigenda.
Scope: Repair, maintenance, and installation of plant/electrical systems for Transmission Substations, Switchyards, and Power House Equipment
EMD/Performance Security: Online RTGS/internet banking or Fixed Deposit Receipt (FDR) in favor of Executive Engineer, Electricity Transmission Division Gonda
Quantity/Duration: Up to 25% increase in contract quantity or duration post-award
Delivery/Implementation: Not explicitly stated; adherence to ATC terms and delivery of FDR within 15 days of award
Documentation: Mandatory certificate uploads; compliance with all bid packet and corrigenda
EMD and security can be paid online or via FDR, with specific bank details provided
Contract scope allows up to 25% variation in quantity or duration
Compliance with ATC, Corrigendum, and required certificate submissions is mandatory
EMD can be paid online; alternative is Fixed Deposit Receipt (FDR) in favor of Executive Engineer, Electricity Transmission Division Gonda; include bidder name and bid number in transaction details
Not explicitly defined; contract may permit up to 25% quantity/duration adjustment with mutual consent
Not specified in the provided data; bidders should rely on GeM General Terms and ATC for remedies
Experience in repair/maintenance of electrical substations or related plant/equipment
Demonstrated technical capability and financial stability via submitted statements
Compliance with GST, PAN, and required certificates as per bid packet
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Transmission Substation; Substation, Switchyard, Power House Equipment, Electrical System or Installation; Service Provider
Advisory Bank
PUNJAB NATIONAL BANK
ePBG Percentage
5%
ePBG Duration (Months)
15
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Gonda
Delivery Pincodes
271001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Rajendra Singh | 271001,ELECTRICITY TRANSMISSION CIRCLE, 220 KV S/S CAMPUS JAIL ROAD GONDA | Gonda | Uttar Pradesh | 271001 | Project / Lumpsum Based | - | Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 0 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST Registration Certificate
PAN Card
Experience Certificates (relevant to repair/maintenance of electrical substations)
Financial Statements (as applicable to demonstrate stability)
EMD submission proof (RTGS/Internet banking or online transfer)
Technical bid documents and certificates
OEM authorizations or service capability certifications (if applicable)
FDR document (if chosen as security) and endorsement letter
Any certificates requested in Bid Document, ATC and Corrigendum
Bidders must submit EMD via RTGS/online transfer to the Executive Engineer, Electricity Transmission Division Gonda, and upload proof. Include all required certificates, technical bid, and any OEM authorizations as per ATC. The contract allows up to 25% variation in quantity or duration; comply with Corrigendum and GeM terms for submission.
Required documents include GST registration, PAN, experience certificates, financial statements, EMD proof, technical bid documents, and OEM authorizations. If choosing FDR, attach the endorsed FDR in favor of the Executive Engineer, with delivery of hard copy within 15 days of award.
EMD can be paid online; alternatively, a Fixed Deposit Receipt (FDR) in favor of the Executive Engineer, Electricity Transmission Division Gonda is allowed. Include the bidder name and bid number in the transaction details; FDR must be endorsed and hard copy delivered within 15 days of award.
The buyer may increase or decrease the contract quantity or duration up to 25% at the time of contract issue, and post-issuance up to 25% with mutual consent for lumpsum service contracts, enabling scope expansion if needed.
Bidders must upload all certificates requested in the bid document, ATC, and Corrigendum. Ensure compliance with any standard references in attached ATC and provide OEM authorizations if mandated by the tender packet.
If the bidder selects FDR as security, the hard copy FDR must be delivered to the buyer within 15 days of award of contract, with endorsement on the back and signed covering letter.
Estimated value is ₹312,651. The scope includes repair, maintenance, and installation for Transmission Substations, Switchyards, and Power House Equipment; no BOQ items are published yet, so bidders should anticipate service-based work within electrical installation and maintenance.
Bid submission requires coordination with UPPCL’s Energy Department in Uttar Pradesh; payments via RTGS to the designated Gonda division account and submission of online transfer proof are mandatory as per bid ATC and terms.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS