TenderDekho Logo
Closed GEM

ICAR HDPE irrigation pipe Tender 2026 by Department of Agricultural Research and Education - ICAR procurement

Bid Publish Date

21-Sep-2026, 10:31 am

Bid End Date

17-Oct-2026, 6:00 pm

Generate Docs

Progress

Issue21-Sep-2026, 10:31 am
Corrigendum15-Oct-2026
AwardPending

Tender Overview

The Indian Council Of Agricultural Research (ICAR), under the Department Of Agricultural Research And Education (DARE), seeks to procure HDPE irrigation pipes. The tender lacks published specifications and BOQ items, with the total quantity and estimated value not disclosed. The location is not specified in the available data. A key differentiator is the documented option clause allowing a ±25% quantity variation at contracted rates, impacting supply planning and pricing. Affected deliveries would commence from the last date of the original delivery order, with extension logic based on a formula tied to increased quantity. An ATC document has been uploaded for bidder reference.

  • Organization: ICAR
  • Product category: HDPE irrigation pipe
  • Location: not specified
  • Quantity/Value: not disclosed
  • Key differentiator: option clause for quantity variation up to 25%; delivery extension mechanism
  • ATC presence: yes; file available for bidders

Technical Specifications & Requirements

  • No explicit technical specifications or BOQ items published
  • Tender indicates procurement of HDPE irrigation pipes without listed size, grade, or pressure rating
  • No EMD amount or estimated contract value published
  • Buyer terms allow quantity variation up to 25% and extended delivery time calculations: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • Delivery timing tied to last date of original order; ATC document governs special terms
  • No mandatory standards or brand requirements specified in the available data

Terms, Conditions & Eligibility

  • Option Clause allows purchaser to increase/decrease quantity by up to 25% at contract rates
  • Delivery period adjustments will use the given formula with a minimum of 30 days
  • ATC document uploaded; bidders should review for compliance and additional conditions
  • BOQ items are not listed; bidders must plan for potential scope changes and confirm exact quantities during contract placement
  • No explicit EMD, qualification criteria, or payment terms published in the provided excerpt

Key Specifications

  • Product/service: HDPE irrigation pipe

  • Estimated value: Not disclosed

  • Quantities: Not disclosed (quantity variation up to 25%)

  • Delivery: From last date of original delivery order; extended delivery time formula

  • Standards/Certification: Not specified in data; ATC doc may contain requirements

  • Brand/OEM: Not specified

  • Warranty/Support: Not specified

Terms & Conditions

  • Option Clause permits ±25% quantity variation at contract rates

  • Delivery extension calculated as (Increased quantity ÷ Original quantity) × Original delivery period with min 30 days

  • ATC document governs additional terms and bidder compliance

Important Clauses

Delivery Terms

Delivery starts after last date of original delivery order; extension time computed per option clause with minimum 30 days

Quantity Variation

Purchaser may increase or decrease quantity by up to 25% during contract and currency with contracted rates

ATC Availability

Uploader has provided an ATC document; bidders must review for detailed terms and compliance

Bidder Eligibility

  • Submit GST registration and PAN as part of bid documents

  • Demonstrate ability to handle HDPE irrigation pipe procurement (if experience required in ATC)

  • Agree to quantity variation and delivery extension terms outlined in the ATC

Advertisement

Authority & Contact

Tender Data

Bid Details

Quantity

200

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

OEM Avg. Turnover

4

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

HDPE irrigation pipe

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Lucknow

Delivery Pincodes

226002

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Arvind Kumar Yadav226002,Raebareli Road, P.O. DilkushaLucknowUttar Pradesh22600220015-

Authority Records

MINISTRY OF AGRICULTURE AND FARMERS WELFAREAGRICULTURAL RESEARCH AND EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9921041.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 2

Advertisement

Corrigendum Updates

1 Update
#1

Update

15-Oct-2026

Extended Deadline

17-Oct-2026, 12:30 pm

Opening Date

18-Oct-2026, 12:30 pm

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates (if any for HDPE pipe supply)

4

Financial statements or turnover proof

5

EMD/Security deposit documents (if specified in ATC)

6

Technical bid documents and OEM authorizations (if required in ATC)

7

Any other documents required by the ATC file uploaded by the Buyer

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for ICAR HDPE irrigation pipe tender in 2026

Bidders should review the ATC document uploaded by ICAR, ensure compliance with the quantity variation clause up to 25%, prepare GST, PAN, and financial documents, and await original delivery order dates to determine delivery timelines. The tender lacks published BOQ items, so confirm exact pipe specifications during contract finalization.

What documents are required for ICAR HDPE pipe procurement bid

Mandatory documents include GST certificate, PAN, experience certificates for HDPE pipe supply (if applicable), financial statements, and EMD/Security as per ATC. Also include technical bid documents and OEM authorizations if required by the ATC file to demonstrate supplier capability.

What are the delivery terms for the ICAR HDPE pipe tender

Delivery begins from the last date of the original delivery order. If quantity increases, delivery time extends by (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. Ensure compliance with the ATC for any additional conditions.

What is the EMD amount for the ICAR HDPE pipe tender

EMD details are not published in the available data. Bidders should verify the ATC document for any EMD amount or alternative security требования and ensure submission with the bid as specified by ICAR.

What standards or certifications are required for ICAR HDPE pipe bid

No explicit standards are listed in the data. The ATC document may specify requirements. Bidders should obtain any applicable certifications and verify if ISI/ISO or material grade standards apply once the ATC is reviewed.

How will quantity variation impact bids for ICAR irrigation pipes

Bidder pricing must accommodate a potential ±25% quantity change at contracted rates. Prepare pricing for base quantity and ensure flexibility in cost per unit. Delivery schedules will adjust as per the extension formula, affecting overall project timeline.

When is the tender expected to finalize its award for HDPE pipe

The available data does not specify dates. Bidders should monitor the ATC and procurement portal for the final award timeline; ensure readiness with complete documents and a compliant bid under ICAR procurement procedures.

What details will the ATC document provide for this ICAR tender

The ATC will outline submission requirements, quantity variation rules, delivery extensions, and any special terms not in the basic tender. Bidders must review the ATC to ensure full compliance and align bids with ICAR procurement expectations.

Advertisement