GEM

Invitation to Bid - Plug-stem set for IMI CCI/ Gadelius make motorized valve of FM supply circuit,Cage for IMI CCI/ Gad in SURAT, GUJARAT

Bid Publish Date

18-Dec-2025, 4:47 pm

Bid End Date

31-Jan-2026, 5:00 pm

EMD

₹42,567

Progress

Issue18-Dec-2025, 4:47 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

4

Category

Plug-stem set for IMI CCI/ Gadelius make motorized valve of FM supply circuit

Bid Type

Two Packet Bid

Public procurement opportunity for Nuclear Power Corporation Of India Limited Plug-stem set for IMI CCI/ Gadelius make motorized valve of FM supply circuit, Cage for IMI CCI/ Gadelius make motorized valve of FM supply circuit, Tag no. 3525-CV-3/4, Valve Mo in SURAT, GUJARAT. Quantity: 4 issued by. Submission Deadline: 31-01-2026 17: 00: 00. View full details and respond.

Past Similar Tenders (Historical Results)

5 found

PLUG WITH STEM AND SEAT RING 15 LV 1306,CAGE 15 LV 1306 VALVE,PLUG WITH STEM AND SEAT RING 15 LV 13

Hindustan Petroleum Corporation Ltd

Posted: 28 May 2025
Closed: 9 June 2025
GEM

CONTROL VALVE WITH POSITIONER, SIZE 25 mm, LINING: PFA(TEFLON) , I/P SIGNAL: 4-20mA, 0.2-1 Kg/cm2,

Munitions India Limited

Posted: 21 November 2024
Closed: 6 December 2024
GEM

ACTUATOR 667/34I FOR HGRU CONTROL VALVES,BARE SHAFT VALVE BODY FOR 90LV555,PLUG FOR 90LV-555,SEAT R

Rashtriya Chemicals And Fertilizers Limited (rcf)

RAIGAD, MAHARASHTRA

Posted: 28 June 2025
Closed: 8 July 2025
GEM

SC110360406: CAGE FOR VSN(HT) 6” , # 2500, VA4R, FOR VALVE SL NO. 3217383,PLUG WITH STEM FOR VSN(

Nlc India Limited

BIKANER, RAJASTHAN

Posted: 10 February 2025
Closed: 3 March 2025
GEM

1. Supply of Parker make FM Snout Plug" O-Ring" as per drawing No. NAPP/35221/3365/DD R-1,2. Supply

Nuclear Power Corporation Of India Limited

BULANDSHAHR, UTTAR PRADESH

Posted: 29 January 2025
Closed: 21 February 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria

3

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer