Bid Publish Date
06-Oct-2026, 1:47 pm
Bid End Date
16-Oct-2026, 2:00 pm
Location
Progress
The Armed Forces Tribunal (Department of Defence) invites bids for the Repair of Rotary Pump. No BOQ items are listed and the estimated value is not disclosed. The tender allows a +/- 25% quantity variation and permits a further 25% increase during contract execution at contracted rates. A mandatory advance sample must be provided before bid opening. Location and complete scope details are not specified in the data.
Product/service names: Rotary pump repair
Quantities: ±25% variation allowed at order; further 25% during currency
EMD/estimated value: Not disclosed in data
Experience: Repair of rotary pumps or similar pumping equipment
Quality/standards: Not specified in tender data
Delivery: From last date of original delivery order; minimum 30 days extension
Option Clause permits quantity changes up to 25% at order and during contract
Advance sample must be provided before bid opening
Delivery period calculation includes minimum 30 days when extending
Not specified in data; advise awaiting tender documents for schedule
Delivery starts from the last date of original delivery order; extended period determined by (increased/original) × original period with minimum 30 days
Not specified; bidders should monitor contract terms for LD or penalties
Experience in repairing rotary pumps or similar pumping equipment
Capability to handle quantity flexibilities up to 25%
Compliance with advance sample submission requirement
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
20 %
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
REPAIR OF ROTARY PUMP
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Leh
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Leh | Leh | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates (repair of rotary pumps or similar pumping equipment)
Financial statements or turnover evidence (if requested by purchaser)
EMD/Security deposit details (not specified in data; bidders should prepare if called)
Technical bid documents demonstrating repair capabilities
OEM authorizations or service center certifications (if applicable)
Key insights about JAMMU AND KASHMIR tender market
Bidders should submit a technical and financial bid along with the mandatory documents listed in the Terms and Conditions. Ensure advance sample submission before bid opening and readiness to accommodate a ±25% quantity variation at order and during currency, as per the option clause.
Required documents include GST certificate, PAN card, relevant experience certificates for rotary pump repairs, financial statements, and technical compliance documents. OEM authorizations or service certifications should be provided if applicable, along with EMD details if requested.
Delivery starts from the last date of the original delivery order. If quantity increases, extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days, and may extend to the original delivery period.
Yes, an advance sample must be provided before bid opening as per the buyer-added ATC clauses, to demonstrate capability to repair and meet performance expectations on the Rotary Pump.
The purchaser may increase or decrease the quantity up to 25 percent at the time of placement of contract, and may further increase up to 25 percent during the currency of the contract at contracted rates.
The tender data provided does not specify the exact delivery location or estimated value. Bidders should await the official tender documents for the precise delivery address, quantity, and value, and verify any site-specific requirements.
If the original delivery period is under 30 days, the minimum extended time equals the original delivery period; however, the overall process may still require coordination with the purchaser for scheduling flexibility.
The tender data lacks explicit standards. Bidders should prepare to demonstrate repair capabilities for rotary pumps with likely industry practices and be ready to provide technical compliance documents, service capabilities, and prior repair project details as per official terms.