Bids are Invited For Contact Resistance Meter (for CB, Isolator etc) as per technical specifications in BIHAR

Bid Publish Date

20-Sep-2022, 6:10 pm

Bid End Date

04-Nov-2022, 4:00 pm

EMD

₹1,42,268

Value

₹71,13,403

Location

Progress

Issue20-Sep-2022, 6:10 pm
AwardPending
Explore all 3 tabs to view complete tender details

Tender Type

Open

Tender Fee

₹11,800

Tender Fee Exemption

No

EMD Exemption

Yes

Category

ELECTRICAL

Categories 10

The issuing authority announces a tender for Design, Manufacture & Supply of 18 nos of Contact Resistance Meter (for circuit breaker, isolator etc. ) in BIHAR. Submission Deadline: 04-11-2022 16: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Processing Fee

₹3,540

Tender Currency

INR

Bid Currency

INR

Ranking Sequence

L1 Ranking

Estimated Value Visibility

Y

Bid To RA

No

Authority & Contact

Organization Hierarchy

Government of Bihar->Bihar State Power Transmission Company Limited->BSPTCL->Headquarter->Operation Maintenance

Approving Authority

BHUPENDRA NATH SINGH (ESE)

Tender Creator

Ms Madhu Priya (EXECUTIVE ENGINEER)

Pre-Bid & Qualification

Pre-Bid Meeting Start

28-09-2022 11:00:00

Pre-Bid Meeting End

28-09-2022 13:00:00

Pre-Bid Discussion Type

ONLINE

Pre-Bid Venue

4th Floor, Vidyut Bhawan

Payment Breakdown

TypeAmountCurrencyModeExemption
EMD₹1,42,268INRInternet Payment Gateway(IPG),Challan|Bank GuaranteeYes
Tender Fee₹11,800INRInternet Payment Gateway(IPG),Challan|No
Tender Processing Fee₹3,540INRInternet Payment Gateway(IPG),Challan|No

Document Requirements

GST CERTIFICATE

BidPart1FinancialMandatoryNo Exemption

Annual Turn Over Certificate for last 5 years (2021-22,2020-21,2019-20, 2018- 19,2017-18)

BidPart1FinancialMandatoryNo Exemption

Exemption Certificate for EMD if applicable (clause 1.11.11 of TS)

BidPart1FinancialOptionalExemption Allowed

ITR for last 5 years

BidPart1FinancialMandatoryNo Exemption

Purchase order, Work order and related Performance Certificate as per Tender clause no-1.06

BidPart1ExperiencesMandatoryNo Exemption

Type Test reports as per Tender clause1.06

BidPart1ExperiencesMandatoryNo Exemption

Audited balance sheet for last 5 years

BidPart1FinancialMandatoryNo Exemption

PAN Card/Aadhar card of Company owner

BidPart1OthersMandatoryNo Exemption

Country of origin of items/ Declaration regarding local contents of item(Submit hardcopy with bid)

BidPart1OthersMandatoryNo Exemption

Affidavit conforming test report&doc. furnished with the tender are correct&true copies

BidPart1OthersMandatoryNo Exemption

Any other documents not mentioned herewith but required for qualification may be submitted

BidPart1OthersMandatoryNo Exemption

General Particulars

1

Name & Designation of the officer of the Bidder/Manufacturer to whom all reference shall be made for expeditious technical co-operation-

2

Place of Manufacturer

3

Service of facilities available

4

Availability of spare parts

5

Bidder proposal no & Date

6

Annual production units for past 5 years

7

Annual Turnover for the 2016-17(in Rs. Crores)

8

Annual Turnover for the 2017-18 (in Rs. Crores)

9

Annual Turnover for the 2018-19 (in Rs. Crores)

10

Annual Turnover for the 2019-20 (in Rs. Crores)

11

Annual Turnover for the 2020-21 (in Rs. Crores)

12

Make

13

Model. No

14

Confirm whether equipment shall be suitable for automatic offline measurement of contact resistance of the switchyard equipments i.e. CB, Isolator, clamp/connectors, joints in live switch yard up to 400 kV level, as per applicable standard testing procedure of BSPTCL

15

Measurement Range

16

Test Current

17

Resolution

18

Accuracy

19

Display

20

Operation Mode

21

Memory

22

Printer

23

Communication Port

24

Test leads and accessories

25

Battery Operation & Charging Supply

26

Operating temperature

27

Relative humidity

28

Cooling arrangement

29

Ruggedness

30

Weight

31

Software

32

Confirm that the complete equipment along with complete accessories must be designed/ engineered by Original Equipment Manufacturer.

33

Confirm that Unit shall be duly calibrated before supply and the date of calibration shall not be older than two month from the date of supply of Kit. However party will have to submit the calibration certificate from/traceable to, NABL accredited lab or internationally reputed lab. Date of calibration shall not be older than two months from the date of supply of Kit.

34

Confirm that Bidder will have to submit the documentary evidences of having established mechanism for prompt services as and when required by BSPTCL. Bidder need to submit their organization service chart along with bid

35

Confirm that warranty/ guarantee of 18 months from the date of delivery or 12 months from the date of successful & complete commissioning at BSPTCL sub-station, whichever is earlier. shall have to ensure the kit is made user friendly apart from the detailed demonstrations at each site. The instrument failed during the demonstration shall be rejected.

36

Confirm that Supplier shall have to ensure that the instrument is made user friendly. Apart from the detailed demonstration at site, the supplier shall also have to arrange necessary training to BSPTCL engineers

Tender Terms

Section 1

Details

Security deposit as per clause 1.14 of this specification has to be deposited and this deposit has to be kept with the Company for the entire guarantee period.

Security deposit as per clause 1.14 of this specification has to be deposited and this deposit has to be kept with the Company for the entire guarantee period.

Section 2

Details

Whether delivery schedule indicated in the specification is acceptable

Whether delivery schedule indicated in the specification is acceptable

Section 3

Details

Whether penalty for delay in delivery as indicated in the specification is acceptable

Whether penalty for delay in delivery as indicated in the specification is acceptable

Section 4

Details

Whether terms of payment indicated in the specification is acceptable

Whether terms of payment indicated in the specification is acceptable

Section 5

Details

Whether guarantee clause indicated in the specification in acceptable

Whether guarantee clause indicated in the specification in acceptable

Section 6

Details

Whether 5% bank guarantee as stipulated under performance guarantee clause will be submitted

Whether 5% bank guarantee as stipulated under performance guarantee clause will be submitted

Section 7

Details

Whether Board's terms of insurance as per specification is acceptable

Whether Board's terms of insurance as per specification is acceptable

Section 8

Details

Whether agreeable to enter into a contract in event of order

Whether agreeable to enter into a contract in event of order

Section 9

Details

Are prices quoted in the price bid FIRM/Variable.

Are prices quoted in the price bid FIRM/Variable.

Section 10

Details

Whether unit F.O.R. destination prices have been quoted in the price bid

Whether unit F.O.R. destination prices have been quoted in the price bid

Section 11

Details

Whether prices quoted are also applicable on reduced quantity or not? Rebate on account of quantity increase, if any, applicable may be mentioned.

Whether prices quoted are also applicable on reduced quantity or not? Rebate on account of quantity increase, if any, applicable may be mentioned.

Section 12

Details

Whether all general terms and conditions are acceptable and no any deviations are quoted, If any deviation, mention the same

Whether all general terms and conditions are acceptable and no any deviations are quoted, If any deviation, mention the same

Section 13

Details

Whether all technical terms and conditions are acceptable and no any deviations are quoted, If any deviation, mention the same

Whether all technical terms and conditions are acceptable and no any deviations are quoted, If any deviation, mention the same

Section 14

Details

Whether the bidder is agreeable to manufacture & supply the equipment in case deviations stipulated by him is not acceptable to Company.

Whether the bidder is agreeable to manufacture & supply the equipment in case deviations stipulated by him is not acceptable to Company.

Section 15

Details

Whether certificates of past performance and copies of related Purchase orders/Work orders along with Type Test Reports as per Eligibility criteria submitted...

Whether certificates of past performance and copies of related Purchase orders/Work orders along with Type Test Reports as per Eligibility criteria submitted or not.

Section 16

Details

Offer must be made complete in all respects as per Technical specification.

Offer must be made complete in all respects as per Technical specification.

Section 17

Details

Though in the Specification for some equipments, particular make and type have not been mentioned, Equipments of make and types which are being used satisfac...

Though in the Specification for some equipments, particular make and type have not been mentioned, Equipments of make and types which are being used satisfactorily in BSPTCL, will be preferred. However, in case of equipments of makes, not supplied earlier to BSPTCL the credentials and updated performance reports regarding supplies made to other central and state Power utilities should be furnished. BSPTCL reserves the right to opt for the make and type.

Section 18

Details

Only type tested equipments and materials shall be supplied by the contractor

Only type tested equipments and materials shall be supplied by the contractor

Section 19

Details

Tenderer shall note and confirm that their scope of work shall fully comply with the requirement as detailed in BSPTCL's Specn.

Tenderer shall note and confirm that their scope of work shall fully comply with the requirement as detailed in BSPTCL's Specn.

Section 20

Details

The Insurance covering Transit Risk, Transportation Risk, handling (during loading and unloading), risk during storage, erection, commissioning, theft and fi...

The Insurance covering Transit Risk, Transportation Risk, handling (during loading and unloading), risk during storage, erection, commissioning, theft and fire shall be done and borne by the Tenderer for all the equipment/items devices pertaining to the transmission line under turnkey package till the installation is handed over to BSPTCL authorities.

Section 21

Details

Tenderer to note and confirm that the freight charges including handling charges during loading and unloading shall be borne by the bidder. All the materials...

Tenderer to note and confirm that the freight charges including handling charges during loading and unloading shall be borne by the bidder. All the materials sent by the Tenderer to site by road transportation shall be suitably packed. No separate freight charges shall be paid by BSPTCL.

Section 22

Details

Tenderer to note and confirm that storing of all materials under this contract shall be within the Tenderer's scope of work and adequate security arrangement...

Tenderer to note and confirm that storing of all materials under this contract shall be within the Tenderer's scope of work and adequate security arrangement for the stores as well as in the areas of erection till the date of handling over, shall be tenderer's responsibility, Tenderer to arrange their own suitable storage at their cost for materials. Bidder also to construct temporary store as well as Site office at Bidders cost.

Section 23

Details

Tenderer to note and confirm that the BSPTCL and his duly authorised representative shall have an access to the contractor's premises, manufacturer's work fo...

Tenderer to note and confirm that the BSPTCL and his duly authorised representative shall have an access to the contractor's premises, manufacturer's work for all tests of the equipment, cable etc. as listed in the schedule of tender. Inspection and testing shall be carried out as per tender specification.

Section 24

Details

All plants/equipment and materials to be supplied for the project shall be guaranteed as per BSPTCL's specifications.

All plants/equipment and materials to be supplied for the project shall be guaranteed as per BSPTCL's specifications.

Section 25

Details

Tenderer to note and confirm that all the supplies shall conform to relevant ISS, IEC, I.E. RULES and BSPTCL's specifications. No material will be accepted u...

Tenderer to note and confirm that all the supplies shall conform to relevant ISS, IEC, I.E. RULES and BSPTCL's specifications. No material will be accepted unless covered by relevant ISS, IEC on any other relevant approved specification as required.

Section 26

Details

Tenderer to note and confirm that without the written consent of BSPTCL they will not assign or sublet the total contract or any part thereof other than for ...

Tenderer to note and confirm that without the written consent of BSPTCL they will not assign or sublet the total contract or any part thereof other than for any part of the work for which the maker are named in the contract. Such contract if given shall not relieve him from any obligation, duty or responsibility as per the terms and conditions of the specification and the contract.

Section 27

Details

Tenderer to note and confirm that relevant data those may be required for the above work and the survey work will be undertaken immediately on receipt of let...

Tenderer to note and confirm that relevant data those may be required for the above work and the survey work will be undertaken immediately on receipt of letter of intent. Tenderer also to note that all supply of consumable materials including cement and steel shall be arranged by the contractor. No separate charges for design and preparation of detailed drawing will be entertained by BSPTCL.

Section 28

Details

Tenderer to confirm that they will furnish Bank Guarantee towards security deposit/contract performance, guarantee before execution of the contract Agreement.

Tenderer to confirm that they will furnish Bank Guarantee towards security deposit/contract performance, guarantee before execution of the contract Agreement.

Section 29

Details

Tenderer to confirm that they will furnish Bank Guarantee for advance payment

Tenderer to confirm that they will furnish Bank Guarantee for advance payment

Section 30

Details

Tenderer to confirm that they will furnish Pert CPM/Barchart/Execution schedule for completion of the project before execution of the agreement

Tenderer to confirm that they will furnish Pert CPM/Barchart/Execution schedule for completion of the project before execution of the agreement

Section 31

Details

Tenderer to confirm that they will furnish Indemnity Bond for the equipments delivered and handed over to the contractor.

Tenderer to confirm that they will furnish Indemnity Bond for the equipments delivered and handed over to the contractor.

Section 32

Details

Tenderer to confirm that they will furnish Bank Guarantee against performance guarantee.

Tenderer to confirm that they will furnish Bank Guarantee against performance guarantee.

Section 33

Details

Tenderer to confirm that they will furnish Power of Attorney by all the partners in case of Joint Venture for authorising the lead partner

Tenderer to confirm that they will furnish Power of Attorney by all the partners in case of Joint Venture for authorising the lead partner

Section 34

Details

Tenderer to confirm that they will furnish Copy of Agreement executed by the members of Joint Ventures.

Tenderer to confirm that they will furnish Copy of Agreement executed by the members of Joint Ventures.

Section 35

Details

The tenderer prices quoted in price schedule included all import duties and levies including licence fees lawfully payable by the contractor on imported good...

The tenderer prices quoted in price schedule included all import duties and levies including licence fees lawfully payable by the contractor on imported goods/items and other taxes and duties on bought-out components, materials, equipments and other items and no such taxes, duties & levies shall be additionally payable by the BSPTCL. Tenderer are also to confirm that no taxes and duties (except entry tax if applicable) shall be payable by the BSPTCL/Purchaser on bought-out items which are dispatched by the Sub-vendors of the contractor directly to the project site on sale-in-transit basis. However, BSPTCL shall provide necessary concessional sales tax declaration from, as concessional sales tax has been included in the price for such sale in transit transactions.

Section 36

Details

This is also hereby confirmed that the award of two contracts will not in any way absolve the contractor of any responsibility and obligation as per the term...

This is also hereby confirmed that the award of two contracts will not in any way absolve the contractor of any responsibility and obligation as per the terms and conditions of the tender specification for succesful completion of the complete work as per the tender specifications and both the contract will have a cross fall breach Clause i.e., a breach in one contract will automatically be considered as breech of the other contract which will conform the BSPTCL/Purchaser/ Employer the right to terminate the other contract at th contractor's risk and cost.

Section 37

Details

It is hereby confirmed that if any income-tax, surcharge on income tax or any other corporate tax is applicable/payble under the law, the same shall be paid ...

It is hereby confirmed that if any income-tax, surcharge on income tax or any other corporate tax is applicable/payble under the law, the same shall be paid by the contractor.

Section 38

Details

It is confirmed that the contract shall be executed strictly in accordance with the specifications and documents except for the variations and deviations, al...

It is confirmed that the contract shall be executed strictly in accordance with the specifications and documents except for the variations and deviations, all of which have been detailed out exhaustively in the respective schedules irrespective of what soever has been stated to the contrary any where else in the tender/offer/bid.

Section 39

Details

Confirm that the Price clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account w...

Confirm that the Price clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 40

Details

Confirm that the Security Deposit clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on an...

Confirm that the Security Deposit clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 41

Details

Confirm that the Earnest Money clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any a...

Confirm that the Earnest Money clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 42

Details

Confirm that the Liquidated damage for delay clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are ...

Confirm that the Liquidated damage for delay clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 43

Details

Confirm that the Guarantee clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any accou...

Confirm that the Guarantee clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 44

Details

Confirm that the Terms of payment clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on an...

Confirm that the Terms of payment clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 45

Details

Confirm that the Performance guarantee clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken ...

Confirm that the Performance guarantee clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 46

Details

Confirm that the Taking over clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any acc...

Confirm that the Taking over clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 47

Details

Confirm that the Insurance clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any accou...

Confirm that the Insurance clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 48

Details

Confirm that the Negligence clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any acco...

Confirm that the Negligence clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 49

Details

Confirm that the Agreement clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any accou...

Confirm that the Agreement clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 50

Details

Confirm that the Time for execution of the contract clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptio...

Confirm that the Time for execution of the contract clauses as specified in the tender specifications are accepted unconditionally and no deviations/exceptions are taken on any account whatsoever.

Section 51

Details

Confirm that additional conditions, deviations, if any, found in the proposal documents other than those stated in the deviation schedules, save the pretaini...

Confirm that additional conditions, deviations, if any, found in the proposal documents other than those stated in the deviation schedules, save the pretaining to any rebate, offered, shall stand with drawn.

Section 52

Details

Unit rates of items/equipments/works as and where required have been furnished

Unit rates of items/equipments/works as and where required have been furnished

Section 53

Details

The details of equipments/materials proposed to be supplied as bought out items have been furnished in a separate schedule.

The details of equipments/materials proposed to be supplied as bought out items have been furnished in a separate schedule.

Section 54

Details

The required documents related to the pre-qualification of he tenderers as detailed in the tender specifications has been furnished in the tender. The docume...

The required documents related to the pre-qualification of he tenderers as detailed in the tender specifications has been furnished in the tender. The documents for the fulfillment of the requirement of the tender specifications have been furnished.

Section 55

Details

Confirm that if the offer is submitted against the tender is accepted by the BSPTCL, the contractor agree to submit engineering data, provide services and co...

Confirm that if the offer is submitted against the tender is accepted by the BSPTCL, the contractor agree to submit engineering data, provide services and complete the entire work in accordance with schedule indicated in the tender/offer. It has been clearly understood that the time for completion of the project is the essence of the contract and hence the execution schedule shall be strictly adhered to the execution schedule has been furnished with the offer.

Section 56

Details

Separate schedule for each item for which L.S. price have been quoted should be furnished with part I of the tender.

Separate schedule for each item for which L.S. price have been quoted should be furnished with part I of the tender.

Section 57

Details

Confirm that all equipments and materials confirming strictly to the tender specification only shall be offered to be delivered in case the order is placed o...

Confirm that all equipments and materials confirming strictly to the tender specification only shall be offered to be delivered in case the order is placed on the bidder. In case of any deviations in the technical specification or make of offered materials/equipments, the BSPTCL shall not be responsibble for any delay even if it is approved proved.

Section 58

Details

Confirm that no extra claim shall be entertained by the BSPTCL for the specified scope of work

Confirm that no extra claim shall be entertained by the BSPTCL for the specified scope of work

Section 59

Details

Confirm that OEM/Bidder should have supplied and commisioned 25%equipment offered against this tender to leading public sectors in India like POWERGRID/ NTPC...

Confirm that OEM/Bidder should have supplied and commisioned 25%equipment offered against this tender to leading public sectors in India like POWERGRID/ NTPC/ NHPC/ BHEL/ CPRI/ State Transmission & Generation Utilities in India etc. in the preceding 10 years.

Section 60

Details

Confirm that Performance certificate ensuring minimum one year successful operation of equipment from the date of commissioning to be submitted

Confirm that Performance certificate ensuring minimum one year successful operation of equipment from the date of commissioning to be submitted

Authority Records

BIHAR STATE POWER TRANSMISSION COMPANY LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

NIT-42_NOTICE.pdf

NIT

TENDER DOC_final_for upload.pdf

TENDER_DOCUMENT

Bill of Quantities (BOQ) 1 Item Sign in for GEM prices

#1

Contact Resistance Meter (for CB, Isolator etc) as per technical specifications

Contact Resistance Meter (for CB, Isolator etc) as per technical specifications

18 NO Rate: ₹1 Est: ₹18

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data