TenderDekho Logo
Closed GEM

Bids are Invited For Transmission Equipment,Transmission Equipment,Transmission Equipment,Transmission Equipment,Transmi in UTTARKASHI, UTTARAKHAND

Bid Publish Date

11-Jul-2025, 11:06 am

Bid End Date

30-Jul-2025, 12:00 pm

EMD

₹2,50,000

Progress

Issue11-Jul-2025, 11:06 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

773

Category

Transmission Equipment

Bid Type

Two Packet Bid

Categories 70

Indian Army has released a public tender for Transmission Equipment, On Air Studio Equipment, Optional Equipment, Installation Material, Services, On Air Studio 10 x 12 Feet, Furniture, Electric Work, License Salary of Hiring of Staff in UTTARKASHI, UTTARAKHAND. Quantity: 773. Submission Deadline: 30-07-2025 12: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Transmission Equipment , On Air Studio Equipment , Optional Equipment , Installation Material , Services , On Air Studio 10 x 12 Feet , Furniture , Electric Work , License Salary of Hiring of Staff

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-8006917.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 49 Items Sign in for GEM prices

#1

Transmission Equipment

50W FM Transmitter

2 nos Delivery: 30 days
#2

Transmission Equipment

Two bay 2 Dipole Antenna

1 nos Delivery: 30 days
#3

Transmission Equipment

RF Cable RF Co axial cable 50 meter with N connector at both end

1 nos Delivery: 30 days
#4

Transmission Equipment

9 RU 19 equipment rack for transmitter

2 nos Delivery: 30 days
#5

Transmission Equipment

100W dummy Load with mathing transformer

1 nos Delivery: 30 days
#6

Transmission Equipment

Manual change over panel with 3 Nos of patch cord for switching between main and standby transmitter

1 nos Delivery: 30 days
#7

Transmission Equipment

10 Band FM audio broadcast processor Internet streamer with iPhone android application

1 nos Delivery: 30 days
#8

Transmission Equipment

Supply installation testing and commissioning of 30 meter self supported tower on ground with foundation erection galvanizing earthing lightning arrestor aviation light

1 nos Delivery: 30 days
#9

On Air Studio Equipment

Monitor 50 W

1 nos Delivery: 30 days
#10

On Air Studio Equipment

16 Channel analog audio mixer

1 nos Delivery: 30 days
#11

On Air Studio Equipment

RJ Condenser Microphone

1 nos Delivery: 30 days
#12

On Air Studio Equipment

Desktop audio work station gen 16GB 1TB 250SSD Win 10Pro Year 18 5 TFT

2 nos Delivery: 30 days
#13

On Air Studio Equipment

Two Channel USB soundcard

2 nos Delivery: 30 days
#14

On Air Studio Equipment

Table top stand

4 nos Delivery: 30 days
#15

On Air Studio Equipment

Flexible microphone stand

1 nos Delivery: 30 days
#16

On Air Studio Equipment

Headphone

4 nos Delivery: 30 days
#17

On Air Studio Equipment

Dynamic cardioid Microphone

4 nos Delivery: 30 days
#18

On Air Studio Equipment

Hand held recorder

1 nos Delivery: 30 days
#19

On Air Studio Equipment

Audio distribution amplifier 1 stereo input and 6 stereo output

1 nos Delivery: 30 days
#20

On Air Studio Equipment

Headphone Distribution amplifier 1 stereo input and 6 Stereo Output

1 nos Delivery: 30 days
#21

Optional Equipment

Single channel telephone hybrid

1 nos Delivery: 30 days
#22

Optional Equipment

Playout Software with logger

1 nos Delivery: 30 days
#23

Installation Material

Junction box Having 6 Nos of Microphone and 6 Nos of headphone facility

1 nos Delivery: 30 days
#24

Installation Material

Misc installation material like audio cable connector etc for the installation of above mention equipment

1 nos Delivery: 30 days
#25

Services

Installation and commissioning work to make the CRS fully functional include

1 nos Delivery: 30 days
#26

On Air Studio 10 x 12 Feet

Recording Studio 12x12x10x10x10 540x10 equal to 540

540 sqft Delivery: 30 days
#27

On Air Studio 10 x 12 Feet

Wooden sound proof door

1 nos Delivery: 30 days
#28

On Air Studio 10 x 12 Feet

Observation Window

1 nos Delivery: 30 days
#29

Furniture

Production Table to house the console Size 7x3

1 nos Delivery: 30 days
#30

Furniture

Transmitter Room Table Size 3x3

1 nos Delivery: 30 days
#31

Furniture

Revolving Chairs

5 nos Delivery: 30 days
#32

Furniture

Carpet

150 sqft Delivery: 30 days
#33

Electric Work

1 5 Ton AC

2 nos Delivery: 30 days
#34

Electric Work

5 KVA UPS

1 nos Delivery: 30 days
#35

Electric Work

Earthing

2 nos Delivery: 30 days
#36

Electric Work

Heat radiator

2 nos Delivery: 30 days
#37

Electric Work

15 KVA Genr set with complete accessories incl 90m power cable

1 nos Delivery: 30 days
#38

Electric Work

15 KVA Stabilizer

1 nos Delivery: 30 days
#39

Electric Work

Security LED lights

2 nos Delivery: 30 days
#40

Electric Work

Electrical works

1 nos Delivery: 30 days
#41

Electric Work

Studio ON air light

1 nos Delivery: 30 days
#42

Electric Work

Digital watch

1 nos Delivery: 30 days
#43

License Salary of Hiring of Staff

License

1 nos Delivery: 30 days
#44

License Salary of Hiring of Staff

Content Creation

1 nos Delivery: 30 days
#45

License Salary of Hiring of Staff

Station Manager

4 months Delivery: 30 days
#46

License Salary of Hiring of Staff

Technician

4 months Delivery: 30 days
#47

License Salary of Hiring of Staff

Radio Jockey Member One

4 months Delivery: 30 days
#48

License Salary of Hiring of Staff

Radio Jockey Member One

4 months Delivery: 30 days
#49

License Salary of Hiring of Staff

Attendant

4 months Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer