TenderDekho Logo
Active GEM

Government Tender Published for Wall cladding,uPVC window,Window glazing,Window Blind,Painting,Allied works,MCB 1,MCB 2,Wiring,PVC in KAMRUP, ASSAM

Bid Publish Date

20-Aug-2026, 2:59 pm

Bid End Date

10-Sep-2026, 3:00 pm

EMD

₹17,449

Location

KAMRUP , ASSAM

Progress

Issue20-Aug-2026, 2:59 pm
AwardPending

A tender has been published for Employees State Insurance Corporation (esic) Wall cladding, uPVC window, Window glazing, Window Blind, Painting, Allied works, MCB 1, MCB 2, Wiring, PVC conduit 1, PVC conduit 2, Modular blanking plate, PVC box 1, PVC box 2, PVC box 3, Modular switch 1, Modular switch 2, Modular switch 3, Modular switch 4, Wiring 1, Wiring 2, Wiring 3, ITC, LED light 2 in KAMRUP, ASSAM. Quantity: 364 by. Submission Deadline: 10-09-2026 15: 00: 00. Check eligibility and apply.

Tender Data

Bid Details

Quantity

364

Category

Wall cladding

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

OEM Avg. Turnover

30

Past Performance

80 %

Warranty Period

1 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Wall cladding , uPVC window , Window glazing , Window Blind , Painting , Allied works , MCB 1 , MCB 2 , Wiring , PVC conduit 1 , PVC conduit 2 , Modular blanking plate , PVC box 1 , PVC box 2 , PVC box 3 , Modular switch 1 , Modular switch 2 , Modular switch 3 , Modular switch 4 , Wiring 1 , Wiring 2 , Wiring 3 , ITC , LED light 2

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

12

Pre-Bid & Qualification

Pre-Bid Date

27-08-2026 11:00:00

Pre-Bid Venue

ESIC RO COMPLEX (HYBRID MODE)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Kamrup Metro

Delivery Pincodes

781021

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Manish Pal781021,ESIC Regional Office Bamunimaidan, GuwahatiKamrup MetroAssam7810218090-

Authority Records

MINISTRY OF LABOUR AND EMPLOYMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9783639.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

Regional Office Guwahati

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 24 Items Sign in for GEM prices

#1

Wall cladding

Providing & fixing in position Phenol bonded Bamboowood wall cladding at all height with planks of sizes 10mm thick, minimum 1800mm length and minimum 100 mm wide as detailed in the detailed BOQ enclosed with the NIT document

80 sqm Delivery: 90 days
#2

uPVC window

Providing and fixing factory made uPVC white colour sliding glazed window upto 1.50 m in height dimension as detailed in the detailed BOQ enclosed with the NIT document

7 sqm Delivery: 90 days
#3

Window glazing

Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge

7 sqm Delivery: 75 days
#4

Window Blind

Providing and fixing Window Blind, including complete in all respect as per the direction of Engineer in-Charge.

9 sqm Delivery: 75 days
#5

Painting

Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete, as per specification provided

50 sqm Delivery: 75 days
#6

Allied works

Allied works as per the BOQ and Item-wise specifications enclosed with the NIT document

1 lot Delivery: 75 days
#7

MCB 1

Supplying and fixing 5 A to 32 A rating 240/415 V miniature circuit breaker as detailed in the detailed BOQ enclosed with the NIT document

2 each Delivery: 75 days
#8

MCB 2

Supplying and fixing 40A rating double pole 240 volts isolator in the existing MCB DB as detailed in the detailed BOQ enclosed with the NIT document

1 each Delivery: 75 days
#9

Wiring

Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable as detailed in the detailed BOQ enclosed with the NIT document

3 each Delivery: 75 days
#10

PVC conduit 1

Supplying and fixing of following sizes of medium class PVC conduit along with accessories in surface/recess including cutting the wall and making good the same in case of recessed conduit as required- 20mm dia

30 mtr Delivery: 75 days
#11

PVC conduit 2

Supplying and fixing of following sizes of medium class PVC conduit along with accessories in surface/recess including cutting the wall and making good the same in case of recessed conduit as required- 25 mm dia

20 mtr Delivery: 75 days
#12

Modular blanking plate

Supplying and fixing modular blanking plate on the existing modular plate & switch box excluding modular plate as required.

6 each Delivery: 75 days
#13

PVC box 1

Supplying and fixing GI/PVC box alongwith modular base & cover plate for modular switches in recess etc.as required- 3 Module (100mmX75mm)

3 each Delivery: 75 days
#14

PVC box 2

Supplying and fixing GI/PVC box alongwith modular base & cover plate for modular switches in recess etc.as required- 6 Module (200mmX75mm)

6 each Delivery: 75 days
#15

PVC box 3

Supplying and fixing GI/PVC box alongwith modular base & cover plate for modular switches in recess etc.as required- 8 Module (125mmX125mm)

8 each Delivery: 75 days
#16

Modular switch 1

Supplying and fixing modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required- 5/6 A switch

12 each Delivery: 75 days
#17

Modular switch 2

Supplying and fixing modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required- 3 pin 5/6 A socket outlet

12 each Delivery: 75 days
#18

Modular switch 3

Supplying and fixing modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required- 15/16A switch

3 each Delivery: 75 days
#19

Modular switch 4

Supplying and fixing modular switch/ socket on the existing modular plate & switch box including connections but excluding modular plate etc. as required- 6 pin 15/16 A socket outlet

3 each Delivery: 75 days
#20

Wiring 1

Wiring for circuit/ submain wiring alongwith earth wire - 1 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire

30 mtr Delivery: 75 days
#21

Wiring 2

Wiring for circuit/ submain wiring alongwith earth wire - 2 X 2.5 sq. mm + 1 X 2.5 sq. mm earth wire

40 mtr Delivery: 75 days
#22

Wiring 3

Wiring for circuit/ submain wiring alongwith earth wire - 2 X 4 sq. mm + 1 X 4 sq. mm earth wire

25 mtr Delivery: 75 days
#23

ITC

Installation, testing and commissioning of pre-wired, fluorescent fitting / compact fluorescent fitting of all types

3 each Delivery: 75 days
#24

LED light 2

Supplying of Ceilling Mounted 22 Watt Indoor type LED Light Fittings as detailed in the detailed BOQ enclosed with the NIT document

3 each Delivery: 75 days

Categories 73

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover

6

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Explore More Opportunities

Quick Access