TenderDekho Logo
GEM

Invitation to Bid - Prefab Shelters With PUF Panel of Size 7.620 M X 10.661 (As Per GeM Drawing),Prefab Hut / House of in CHAMPAWAT, UTTARAKHAND

Bid Publish Date

14-Oct-2025, 9:39 am

Bid End Date

04-Nov-2025, 10:00 am

EMD

₹1,82,795

Progress

RA
Issue14-Oct-2025, 9:39 am
Reverse AuctionCompleted
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

28

Category

Prefabricated Toilet Block

Bid Type

Two Packet Bid

Categories 3

Border Road Organisation announces a tender for Prefab Shelters With PUF Panel of Size 7. 620 M X 10. 661 (As Per GeM Drawing), Prefab Hut / House of Size 6. 10 M x 19. 52 M (as per GeM Drawing), Prefab Hut / House of Size 6. 10 M X 7. 32 M (as per GeM Drawing), Prefab Hut / House of Size 4. 88 M X 9. 76 M (as per GeM Drawing), Prefabricated Toilet Block in CHAMPAWAT, UTTARAKHAND. Quantity: 28. Submission Deadline: 04-11-2025 10: 00: 00. Last date to apply is approaching fast!

Documents 13

GeM-Bidding-8347702.pdf

Main Document

CATALOG-Specification-43-items

CATALOG Specification

Other Documents

OTHER

Other Documents

OTHER

CATALOG-Specification-17-items

CATALOG Specification

Other Documents

OTHER

CATALOG-Specification-17-items

CATALOG Specification

Other Documents

OTHER

CATALOG-Specification-18-items

CATALOG Specification

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Prefab Hut / House of Size 6.10 M x 19.52 M (as per GeM Drawing),Prefab Hut / House of Size 6.10 M

Border Road Organisation

WEST SIANG, ARUNACHAL PRADESH

Posted: 25 August 2025
Closed: 5 September 2025
GEM

Prefab Hut / House of Size 6.10 M x 19.52 M (as per GeM Drawing),Prefab Hut / House of Size 6.10 M

Border Road Organisation

Posted: 7 November 2024
Closed: 18 November 2024
GEM

Prefab Hut / House of Size 6.10 M x 19.52 M (as per GeM Drawing),Prefab Hut / House of Size 6.10 M

Border Road Organisation

DIMAPUR, NAGALAND

Posted: 12 January 2025
Closed: 22 January 2025
GEM

Prefab Toilet Block of Size 4.88 M x 7.32 M (As Per GeM Drawing),Prefab Hut / House of Size 6.10 M

Border Road Organisation

WEST SIANG, ARUNACHAL PRADESH

Posted: 27 January 2025
Closed: 6 February 2025
GEM

Prefab Hut / House of Size 6.10 M x 19.52 M (as per GeM Drawing)

Aryabhatta Research Institute Of Observational Sciences (aries)

NAINITAL, UTTARAKHAND

Posted: 7 February 2025
Closed: 7 March 2025
GEM

Technical Specifications 4 Items

Item #1 Details

View Catalog
Category Specification Requirement
GENERIC Type and Size of Prefab Shelter TYPE B5 having Outside size 7.620 M x 10.661 M with PUF Insulated Panel of 80 mm including Full length Verandah and without Toilets.
GENERIC Structure of Shelter As per layout drawings conforming to GeM Drg. No. 1 to Drg. No. 12 and Perspective view of roof with arrangement of Purlins and Columns for shelter - Floor structure - Steel footings - roof - doors - windows - Ventilators - Base frame - Floor panels with constructional details of the main structural members - as per GeM drg. uploaded at QR SPCN DOCUMENT.
GENERIC Scope of supply (Offer Price to include all cost components) Supply - Installation - Testing and Commissioning of Prefab Shelter - including Electrical wiring & Fittings as well as Plumbing and Sanitary fittings.
GENERIC Transpotations / Freight charges Offer Prices are on Free Delivery at Consignee site basis.
GENERIC Approval of Advance sample before Bulk Supply No Advance Sample
GENERIC Foundation for Prefab Shelter Building of Foundation at site shall be the responsibility of the Consignee and the Seller shall Install / Erect and Commission the structure on the foundation constructed upto plinth level by the Consignee.
GENERIC Time Period for Completion of Erection work at site by Seller Within 45 days of the date of receipt of consignee's confirmation regarding completion of ground and foundation work
GENERIC Payment Terms Bill / invoice to be submitted in two parts by seller (80% and 20%). Payment for initial 80% to be made within ten (10) days of receipt of goods by consignee. Bill for balance 20% to be raised by seller after completion of installation / commissioning , and to be released by Buyer with in ten (10) days of issue of consignee receipt-cum-acceptance certificate after Successful installation / Commissioning
GENERIC Suitability / structural stability / completness of structures, the structure is intended for use in In wind condition of 55m/s - in Seismic zone V and ambient temperature range (-) 40 degree C to (+) 50 degree C - 1 M snow load standing on the roof - Roof slope 1 : 2 Shelter should be structurally stable and suitable to meet severity of these climatic condition.
MATERIALS & MANUFACTURE Structural members welded together Confmg. to the relevant drawing
PPGI SHEET - Colour & Finish Zinc coating With minimum 120 gsm of zinc coating on both sides followed by a top coat of PVDE / Silicon modified Polyester having a thickness of 20 micron minimum and with back coat of alkaloid epoxy .
PUF INSULATED PANELS Polyurethane Foam (PUF) insulation Encased between pre-painted galvanized steel sheets.
PUF INSULATED PANELS Puf components iso-cyanide and polyol liquid for in-situ process of providing polyurethane foam insulation in the panels.
PUF INSULATED PANELS Insulation of Wall, Roof and Floor panels Insulation core of panel formed in one piece and provides desired structural and physical properties.
PUF INSULATED PANELS Injection of PUF chemical mixture Injected in to the cavity before the foam reaction starts - For wall / roof panel inject specified amount of full panel in ONE SHOT and for floor panel in THREE SHOTS in a duration not exceeding 25 sec.
PUF INSULATED PANELS PU foam layer 79 mm in case of 80 mm wall panels design.
STEEL FOOTING Number of ISA 4 Nos. of size 50 mm x 50 mm x 6 mm thick 1200 mm long having slot for adjustment of height provided these ISA and inforced by 40 mm x 4 mm MS flat at every 300 mm c / c.
STEEL FOOTING Joining of Floor panel and base frame Floor panel joined with the steel base frame with the help of 10 mm x 100 mm counter sunk nut bolt for 60 mm design.
STEEL FOOTING Steel footing welded By means of MIG welding
COLUMNS - Trusses and Purlins Trusses manufactured In split form (two parts) using RHS section of 80 mm x 40 mm x 3.2 mm at top and bottom cord of truss and 50 mm x 25 mm x 1.8 mm thick internal members.
COLUMNS - Trusses and Purlins Purlins made up of RHS of size 96 mm x 48 mm x 3.2 mm and fixed between the trusses with suitable cleats and nuts and bolts as per relevant drawing.
COLUMNS - Trusses and Purlins Verandah column made Using RHS section of size 80 mm x 40 mm x 3.2 mm thick fixed with help of 5 mm thick MS Plates and 12 mm nut bolts at the top level on base plate of the steel footing.
COLUMNS - Trusses and Purlins Design and dimensions Steel structure for the shelters designed with dimensions as per the relevant Drawing.
WALL PANELS Panels provided with Tongue and groove joint and interlocked using cam lock systems.
WALL PANELS Wall panels at the corner Placed using factory fabricated corner angle panel made out from PUF insulated panel so that wall panels not to be have any PPGI top track - therfore no riveting / welding to be allowed.
WALL PANELS Bent / riveted PPGI angle and flashings bent or/ and riveted to form the desired shapes and sizes.
FLOOR PANELS Floor made in PUF panel system using 0.5 mm thick (TMT) PPGI as outer and 19 mm thick BWR ply as IS : 303 (latest) as inner skin with .
FLOOR PANELS Gap filled with Rigid CFC free polyurethane foam of Density 40 Kg/cum ± 2 Kg/cum as insulation with 2 nos. reinforcement hollow rectangular section of size 60 mm x 40 mm x 2 mm thick.
FLOOR PANELS Thickness of PU foam 61 mm for 80 mm design and having 19 mm thick BWR ply.
FLOOR PANELS Toungue and Groove joint Floor panels have tongue and groove joint and interlocked with each other lengthwise using Cam Lock systems.
FLOOR PANELS Floor panel fixing Floor panel fixed to base frame steel beams with help of counter sunk nut bolt of 10 mm dia and 125 mm long for 80 mm design.
FALSE CEILING & PARTITION WALL Provision for False ceiling In main living area
FALSE CEILING & PARTITION WALL To accomodate False ceiling MS angle of size 40 mm x 40 mm x 5 mm to accomodate false ceiling panel of 40 mm thickness used to fix all around the wall panel and false ceiling panel for support.
FOOTING COVER PANELS & ROOFING PU foam layer thickness 76 mm in case of 80 mm design.
FOOTING COVER PANELS & ROOFING Total Thickness 80 mm
DOORS Number of tower bolts in main / toilet door 2 nos. of size 200 mm long (from inside)made of Alminium.
DOORS Main / Toilet door sliding bolt 1 nos. of size 300 mm long (from outside)made of Alminium.
MISCELLANEOUS Interiors for doors and windows 25 mm diameter mild steel powder colour coated fancy type drapery rod with fixing arrangements.
MISCELLANEOUS Each frame in between 2 verandah column Consists of one aluminium sliding window having glazed shutter of 8 mm in 80 mm design polycarbonate sheet.
MISCELLANEOUS Any other portion fixed in verandah Using 8 mm for 80 mm design multi wall polycarbonate sheet - as per relevant drawing.
MISCELLANEOUS MCB / Switches / Sockets / Cables /Distribution boxes ISI marked
MISCELLANEOUS Earthing Conforming to IS : 3043 / latest - and as per Indian Electricity Rules.
WARRANTY Warranty 1 - Year

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Reverse Auction Schedule

Completed

Start

19-Nov-2025, 10:00 am

End

20-Nov-2025, 11:53 am

Duration: 26 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1RM Excellant(MSE,MII)   Under PMA Winner ₹1,52,95,000Item Categories : Prefab Shelters With PUF Panel of Size 7.620 M X 10.661 (As Per GeM Drawing),Prefab Hut / House of
L2SIYARAM SALES CORPORATION (MSE,MII)   Under PMA₹1,56,51,400Item Categories : Prefab Shelters With PUF Panel of Size 7.620 M X 10.661 (As Per GeM Drawing),Prefab Hut / House of
L3SIMRAN INDUSTRIES (MII)   Under PMA₹1,79,15,436Item Categories : Prefab Shelters With PUF Panel of Size 7.620 M X 10.661 (As Per GeM Drawing),Prefab Hut / House of
L4LUXMI ENGINEERS (MSE,MII)   Under PMA₹1,86,40,000Item Categories : Prefab Shelters With PUF Panel of Size 7.620 M X 10.661 (As Per GeM Drawing),Prefab Hut / House of
L5ARYAVART TECH PRIVATE LIMITED (MSE,MII)   Under PMA₹2,98,30,000Item Categories : Prefab Shelters With PUF Panel of Size 7.620 M X 10.661 (As Per GeM Drawing),Prefab Hut / House of

🎉 L1 Winner

RM Excellant(MSE,MII)   Under PMA

Final Price: ₹1,52,95,000