Bid Publish Date
16-Sep-2026, 10:50 am
Bid End Date
29-Sep-2026, 11:00 am
Location
Progress
The Indian Coast Guard, under the Department of Defence, seeks supply, installation, testing and commissioning of a Power over Ethernet (PoE) switch with a 01 KVA UPS. The contract scope includes all standard accessories, cables and installation materials at no extra cost, with the delivered and installed system to be brand new, genuine and mutually compatible. Final acceptance hinges on successful on-site installation, testing and commissioning, with warranty and after-sales support governed by GeM terms. The winner must maintain a local service presence in the consignee’s state. The option clause allows a ±25% quantity variation during contract period, impacting delivery timelines and quantities. The order will be delivered to the Commanding Officer, ICGS Mayabunder, North and Middle Andaman, 744204. This procurement emphasizes reliable power-assisted PoE switching suitable for defence communications in a coastal environment.
PoE Switch with integrated 01 KVA UPS
Brand new and genuine hardware
SITC scope: supply, installation, testing, commissioning
On-site acceptance testing required
Warranty and after-sales as per GeM terms
Local service presence in consignee state
Quantity may vary up to 25% during contract at contracted rates
Delivery to The Commanding Officer, ICGS Mayabunder, 744204
Mandatory on-site installation and commissioning and acceptance
Provide PAN, GSTIN, Cancelled Cheque and EFT mandate
Office in consignee state required for service support
Not specified in available data; follow GeM STC/GTC terms
Delivery timeline tied to original delivery period with option-based adjustments; minimum 30 days as applicable
Not detailed in provided terms; refer GeM GTC for LD provisions
Vendor must have local office in North & Middle Andaman or state of consignee
Capability to perform SITC of PoE switches with UPS in defence context
Compliance with GeM GTC, STC, and ATC terms
Quantity
1
Bid Type
Single Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
10 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
POE Switch with 01 KVA UPS
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
North And middle andaman
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | North And middle andaman | North And middle andaman | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
29-Sep-2026, 5:30 am
Opening Date
30-Sep-2026, 5:30 am
PAN card copy
GSTIN copy
Cancelled cheque copy
EFT mandate certified by bank
Vendor code creation documents
Proof of service capability in consignee state
Any GeM STC/GTC-compliant certificates
Key insights about ANDAMAN & NICOBAR tender market
Bidders must register on GeM, upload PAN, GSTIN, Cancelled Cheque and EFT mandate, and ensure local service presence in the consignee state. Prepare SITC capability for PoE switches with a 01 KVA UPS, and align with GeM GTC/ATC. Ensure on-site installation acceptance and warranty coverage.
Submit PAN card, GSTIN, Cancelled Cheque, EFT Mandate, and vendor code creation proof. Include evidence of local service presence in North & Middle Andaman and any GeM-compliant certificates; lack of certificates risks bid rejection.
The contract requires a brand new PoE switch with an integrated 01 KVA UPS, SITC scope, inclusion of all accessories, cables, and installation materials at no extra cost, and successful on-site testing before final acceptance.
Delivery and installation must occur at The Commanding Officer, ICGS Mayabunder, Rampur Village, Mayabunder, North and Middle Andaman - 744204; acceptance follows satisfactory commissioning.
Final acceptance occurs after satisfactory installation, testing, and commissioning at the site, as per GeM terms. Acceptance is contingent on on-site performance and compatibility with existing defence systems.
Warranty and after-sales support must follow GeM bid/STC/GTC terms, covering hardware defects and service response during the warranty period, with defined SLAs for on-site support in the consignee state.