Uttar Pradesh Cooperative Sugar Factories Federation Limited Procurement Tender Bijnor UP 2026

Bid Publish Date

28-Jun-2026, 2:14 pm

Bid End Date

21-Jul-2026, 3:00 pm

Value

₹4,50,000

Generate Docs

Progress

Issue28-Jun-2026, 2:14 pm
Corrigendum18-Jul-2026
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

1802

Category

Repairing the condensate tank pump delivery line of the pan 1

Bid Type

Two Packet Bid

Categories 95

Tender Overview

Uttar Pradesh Cooperative Sugar Factories Federation Limited invites bids for a broad procurement with an estimated value of ₹450,000 in BIJNOR, UTTAR PRADESH 246701. The tender covers multiple line items (193 BOQ entries reported as N/A), with an option clause allowing ±25% quantity variation at contracted rates. All bidders must meet turnover, experience proof, and certificate submission requirements as outlined in the ATC. The opportunity emphasizes compliance, record accuracy, and timely delivery within contract terms.

Key Specifications

    • Estimated value: ₹450,000
    • BOQ items: 193 items (described as N/A in data)
    • Quantity variation: up to 25% under option clause
    • Delivery time: minimum 30 days (adjusted per formula for extended quantity)
    • Turnover proof: last three years turnover required
    • Past experience proofs: contract copies, execution certificates, or third-party notes

Terms & Conditions

  • Key Term 1: Quantity variation allowed up to 25% during contract

  • Key Term 2: Turnover criteria requires audited statements or CA certificate

  • Key Term 3: Documentation and certificates must be uploaded; non-submission risks rejection

Important Clauses

Payment Terms

Not explicitly stated; verify in Bid Document/ATC for EMD, payment schedule, and any advance payments

Delivery Schedule

Delivery period starts from the last date of original delivery order; extended time calculated as (increased quantity / original quantity) × original delivery period, min 30 days

Penalties/Liquidated Damages

Not specified in data; check ATC for LD or performance bond requirements

Bidder Eligibility

  • Minimum average turnover over the last three financial years as per bid document

  • Past project experience proof via contract copies or client certifications

  • Submission of required GST, PAN, and technical/certification documents

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Bijnor

Delivery Pincodes

246763

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Anurag Singh246763,KISAN SAHKARI CHINI MILLS LTD., Sneh Road Najibabad PIN CODE- 246763 GST NO - 09AAAAK1634P1ZD Contact no- 9411427852,6397805612BijnorUttar Pradesh246763290-

Authority Records

UTTAR PRADESH COOPERATIVE SUGAR FACTORIES FEDERATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9530078.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Invitation to Bid - Mtc. Of different L.I Schemes under Dasda and Laljuri R.D Block under Water Resource Sub-Division, Kanchanpur, North Tripura during the year 2023-2024 in North Tripura, TRIPURA

N/A

North Tripura, TRIPURA

Closed: 26 February 2024
EPROCURE

Tender Notice for Mtc.of different L.I Schemes under Pecharthal R.D Block under Water Resource Sub-division, Kanchanpur, North Tripura during the year 2023-2024 in Unakoti, TRIPURA

N/A

Unakoti, TRIPURA

Closed: 26 February 2024
EPROCURE

Procurement Opportunity: Repairing./replacement of defective existing pump i/c repairing of G.I pipe line and other allied work to be carried out in DUWA, Department of CIE and Engineering Department, University of Delhi in NORTH, DELHI

Delhi University

NORTH, DELHI

Posted: 18 July 2025
Closed: 4 August 2025
EPROCURE

Pump Repair

Indian Army

LEH, JAMMU & KASHMIR

Posted: 15 May 2025
Closed: 5 June 2025
GEM

Government Tender Published for NIT No. 07, Item No.10 (2025-26) (Re-invite) in CENTRAL, DELHI

N/A

CENTRAL, DELHI

Posted: 6 August 2025
Closed: 12 August 2025
EPROCURE

Bill of Quantities (BOQ) 193 Items Sign in for GEM prices

#1

Repairing the condensate tank pump delivery line of the pan 1

Fabricate and install 6inch size nipple

2 pcdn Delivery: 90 days
#2

Repairing the condensate tank pump delivery line of the pan 2

Fabricate and install 6inch size flange

4 pcdn Delivery: 90 days
#3

Repairing the condensate tank pump delivery line of the pan 3

Dismantling 6inch size pipeline

6 pcdn Delivery: 90 days
#4

Replacing damaged bypass line band flange of melter 1

Installing 6inch size pipeline and giving satisfactory trial

12 pcdn Delivery: 90 days
#5

Replacing damaged bypass line band flange of melter 2

Fabricate and install 6inch size band

4 pcdm Delivery: 90 days
#6

Replacing damaged bypass line band flange of melter 3

Fabricate and install 6inch size flange

5 pcdn Delivery: 90 days
#7

Replace damaged 100 pound 3inch size pipeline from Pan No 1 to Pan No 6 and give satisfactory trial

Replace damaged 100 pound 3inch size pipeline from Pan No 1 to Pan No 6 and give satisfactory trial

30 pcdn Delivery: 90 days
#8

Replace the weak vapor pipe from Pan No 1 to 6 size dia 1 150 m length 30 m 1

Dismantle the weak vapor pipe from Pan No 1 to 6

10 pcdm Delivery: 90 days
#9

Replace the weak vapor pipe from Pan No 1 to 6 size dia 1 150 m length 30 m 2

Fabricate the weak vapor pipe from Pan No 1 to 6

10 per ton Delivery: 90 days
#10

Replace main hole dia 600 mm of Pan No 3 Sevual with 10 mm thick plate

Replace main hole dia 600 mm of Pan No 3 Sevual with 10 mm thick plate

1 per ton Delivery: 90 days
#11

Replace damaged overflow pipeline of BH and CL molasses conditioner of 6inch size 1

Replace damaged overflow pipeline of BH and CL molasses conditioner of 6inch size

5 per piece Delivery: 90 days
#12

Replace damaged overflow pipeline of BH and CL molasses conditioner of 6inch size 2

Fabricate and install 6inch size band

4 pcdm Delivery: 90 days
#13

Replace corroded nipples pipes flanges of 6inch size header on Pan No 5 and 6 install related nipples valves etc and give satisfactory trial

Replace corroded nipples pipes flanges of 6inch size header on Pan No 5 and 6 install related nipples valves etc and give satisfactory trial

2 pcdn Delivery: 90 days
#14

Replace damaged ammonia pipeline flange nipple in Pan No 4 and 6 1

Replace 2inch size pipeline

30 per piece Delivery: 90 days
#15

Replace damaged ammonia pipeline flange nipple in Pan No 4 and 6 2

Fabricate and install 2inch size flange

4 pcdm Delivery: 90 days
#16

Replace damaged ammonia pipeline flange nipple in Pan No 4 and 6 3

Fabricate and install 2inch size nipple

4 pcdm Delivery: 90 days
#17

Replace damaged ammonia pipeline flange nipple in Pan No 4 and 6 4

Fabricate and install 3inch size flange

6 pcdm Delivery: 90 days
#18

Replace damaged ammonia pipeline flange nipple in Pan No 4 and 6 5

Fabricate and install 3inch size valve

2 pcdm Delivery: 90 days
#19

Cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and install it 1

Replace and install 6inch size pipeline

18 pcdm Delivery: 90 days
#20

Cut and remove damaged wash-out line installed on the pan and rebuild with supplied pipe and install it 2

Fabricate and install 6inch size flange

4 pcdm Delivery: 90 days
#21

Replace damaged washing pipeline nipple flange band on Pan No 6 1

Replace 6inch size pipeline of the above

6 pcdn Delivery: 90 days
#22

Replace damaged washing pipeline nipple flange band on Pan No 6 2

Fabricate and install 6inch size flange

6 pcdm Delivery: 90 days
#23

Replace damaged washing pipeline nipple flange band on Pan No 6 3

Fabricate and install 6inch size nipple

4 pcdn Delivery: 90 days
#24

Replace damaged washing pipeline nipple flange band on Pan No 6 4

Fabricate and install 6inch size band

4 pcdn Delivery: 90 days
#25

Install valve in steam line at Pan No 2 550 mm 1

Install valve in steam line at Pan No 2 550 mm

1 pcdn Delivery: 90 days
#26

Install valve in steam line at Pan No 2 550 mm 2

Install flange in steam line at Pan No 2 550 mm

4 pcdn Delivery: 90 days
#27

Install valve in steam line at Pan No 2 550 mm 3

Install nipple in steam line at Pan No 2 550 mm

1 pcdn Delivery: 90 days
#28

Install valve in steam line at Pan No 2 550 mm 4

Fabricate and install catcher element size 75 X 75 X 8 angle on Pan No 4 and 5

2 pcdn Delivery: 90 days
#29

Replace nipple and band of A heavy tank 2

Replace nipples of the above tank

2 per piece Delivery: 90 days
#30

Replace nipple and band of A heavy tank 3

Replace bands of the above tank

2 pcdn Delivery: 90 days
#31

Replace nipple and band of A heavy tank 4

Replace partition of syrup tank with 10/12 mm thick plate

10 kg m Delivery: 90 days
#32

Remove clean and reinstall 4inch size syrup line on pan

Remove clean and reinstall 4inch size syrup line on pan

120 per m Delivery: 90 days
#33

Cut and remove syrup header and fabricate and install new header

Cut and remove syrup header and fabricate and install new header

2 per piece Delivery: 90 days
#34

Replacing the 6inch size glycol washing line fitted on Pan No 1

Replacing the 6inch size glycol washing line fitted on Pan No 1

10 pcdm Delivery: 90 days
#35

Replacing nipples of different lines of Pan No 6 1

Replacing nipples of 2inch size line mentioned above

2 pcdn Delivery: 90 days
#36

Replacing nipples of different lines of Pan No 6 2

Replacing nipples of 4inch size line mentioned above

2 pcdn Delivery: 90 days
#37

Replacing nipples of different lines of Pan No 6 3

Replacing nipples of 6inch size line mentioned above

2 pcdn Delivery: 90 days
#38

Replacing nipples of different lines of Pan No 6 4

Replacing nipples of 8inch size line mentioned above

2 pcdn Delivery: 90 days
#39

Replacing 10inch size nipples of cut off line of Pan No 6 1

Replacing 10inch size nipples of cut off line of Pan No 6

2 pcdn Delivery: 90 days
#40

Replacing 10inch size nipples of cut off line of Pan No 6 2

Replacing 10inch size pipe line

12 pcdm Delivery: 90 days
#41

Replacing 10inch size nipples of cut off line of Pan No 6 3

Making and fitting 10inch size flange

4 pcdn Delivery: 90 days
#42

Replacing 10inch size nipples of cut off line of Pan No 6 4

Making and fitting 10inch size band

2 pcdn Delivery: 90 days
#43

Replacing corroded hot water pipeline nipples flanges valves in Pan No 4 1

Making and fitting 8inch size band

2 pcdn Delivery: 90 days
#44

Replacing corroded hot water pipeline nipples flanges valves in Pan No 4 2

Replacing 4inch size pipe line

10 pcdm Delivery: 90 days
#45

Replacing corroded hot water pipeline nipples flanges valves in Pan No 4 3

Making and fitting 4inch size flange

4 pcdn Delivery: 90 days
#46

Replacing corroded hot water pipeline nipples flanges valves in Pan No 4 4

Making and fitting 4inch size valve

2 pcdn Delivery: 90 days
#47

Fabricating M S bed for syrup pump and motor fitting and alignment followed by satisfactory trial

Fabricating M S bed for syrup pump and motor fitting and alignment followed by satisfactory trial

2 lamsam Delivery: 90 days
#48

Dismantling weak condensate bottle of old set

Dismantling weak condensate bottle of old set vertical line juice heater and quad body No 4 disposing to scrap yard fabricating all connections using 8/10 mm plates and giving satisfactory vacuum trial

2 per piece Delivery: 90 days
#49

Replacing weak pipeline flange valve and band of old set vertical juice heater 1

Replacing 2inch size pipeline

15 pcdm Delivery: 90 days
#50

Replacing weak pipeline flange valve and band of old set vertical juice heater 2

Replacing 6inch size pipeline

15 pcdm Delivery: 90 days
#51

Replacing weak pipeline flange valve and band of old set vertical juice heater 3

Making and fitting 2inch size flange

4 pcdn Delivery: 90 days
#52

Replacing weak pipeline flange valve and band of old set vertical juice heater 4

Making and fitting 6inch size flange

4 pcdn Delivery: 90 days
#53

Replacing weak pipeline flange valve and band of old set vertical juice heater 5

Making and fitting 6inch size band

2 pcdn Delivery: 90 days
#54

Replacing weak pipeline of old Quad set No 4 1

Making and fitting 6inch size valve

2 pcdn Delivery: 90 days
#55

Replacing weak pipeline of old Quad set No 4 2

Replacing 2inch size pipeline

14 pcdm Delivery: 90 days
#56

Replacing weak pipeline of old Quad set No 4 3

Replacing 6inch size pipeline

18 pcdm Delivery: 90 days
#57

Replacing weak pipeline of old Quad set No 4 4

Making and fitting 6inch size band

2 pcdn Delivery: 90 days
#58

Replacing weak pipeline of old Quad set No 4 5

Making and fitting 6inch size flange

4 pcdn Delivery: 90 days
#59

Dismantling damaged mesh of section pipe located at Injection No 2 and 3 and making a new one from given M S plate and fitting it

Dismantling damaged mesh of section pipe located at Injection No 2 and 3 and making a new one from given M S plate and fitting it

2 per piece Delivery: 90 days
#60

Cutting and discarding old damaged reducer plate of section pipe located at Injection No 2 and 3 and remaking the same

Cutting and discarding old damaged reducer plate of section pipe located at Injection No 2 and 3 and remaking the same

2 per piece Delivery: 90 days
#61

Fitting water line from overhead to service tank 1

Fitting mentioned line into service tank

20 pcdm Delivery: 90 days
#62

Fitting water line from overhead to service tank 2

Making and fitting 8inch size band

2 pcdn Delivery: 90 days
#63

Details of work of Canti machine No 6 and 7 1

Making and fitting 8inch size nipple

1 pcdn Delivery: 90 days
#64

Details of work of Canti machine No 6 and 7 2

Dismantling and fitting 6inch size pipeline

18 pcdm Delivery: 90 days
#65

Details of work of Canti machine No 6 and 7 3

Making and fitting 6inch size band

6 pcdn Delivery: 90 days
#66

Details of work with new pipes from S Sugarbin 1

Dismantling resistance box installed on spray making and fitting new one from given M M plate carrying out proper stay fitting and welding and conducting leak proof trial

1 per piece Delivery: 90 days
#67

Details of work with new pipes from S Sugarbin 2

Dismantling and installing 8inch size pipeline

6 pcdm Delivery: 90 days
#68

Details of work with new pipes from S Sugarbin 3

Fabricating and installing 8inch size bands

1 pcdn Delivery: 90 days
#69

Details of work for KCP No 1 and 2 and Canty Machine No 6 and 7 1

Fabricating and installing 8inch size flanges

4 pcdn Delivery: 90 days
#70

Details of work for KCP No 1 and 2 and Canty Machine No 6 and 7 2

Dismantling and installing 12inch size pipeline

8 pcdm Delivery: 90 days
#71

Details of work for KCP No 1 and 2 and Canty Machine No 6 and 7 3

Fabricating and installing 12inch size bands

2 pcdn Delivery: 90 days
#72

Work on hot water line of brown sugar magma 1

Fabricating and installing 12inch size flanges

4 pcdn Delivery: 90 days
#73

Work on hot water line of brown sugar magma 2

Dismantling and installing 3inch size pipeline

10 pcdm Delivery: 90 days
#74

Work on hot water line of brown sugar magma 3

Manufacturing and installing 3inch size nipples

2 pcdn Delivery: 90 days
#75

Work on hot water line of brown sugar magma 4

Manufacturing and installing 3inch size bands

1 pcdn Delivery: 90 days
#76

Cutting and removing damaged monitor casing and ribs

Cutting and removing damaged monitor casing and ribs inside Canty No 1 and 2 and KCP Machine 1 and 2 patching with 10/12 mm MS plate and giving satisfactory trial 1

2 pcdn Delivery: 90 days
#77

Cutting and removing damaged center shaft and arms inside KCP Machines No 1 and 2 bending and fitting new parts with 8 to 10 mm plate

Cutting and removing damaged center shaft and arms inside KCP Machines No 1 and 2 bending and fitting new parts with 8 to 10 mm plate 1

2 lamsam Delivery: 90 days
#78

Dismantling damaged upper cover part of Canty Machine No 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections

Dismantling damaged upper cover part of Canty Machine No 6 and 7 scrapping fabricating and fitting new cover with 12 mm plate and making all related connections

2 per unit Delivery: 90 days
#79

Dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard

Dismantling damaged part of molasses weighing scale receiving tank and fabricating and fitting new part by bending 8 mm thick plate and depositing scrap in scrap yard

1 lamsam Delivery: 90 days
#80

Dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard

Dismantling damaged plate of sugar discharge chute from sugar elevator to sugar grader and fabricating and fitting new plate of 6 mm thickness depositing scrap in scrap yard

3 per meter Delivery: 90 days
#81

Details of work from C magma to melter tank 1

Modifying sugar chute of grader in dryer house and giving satisfactory trial

4 per unit Delivery: 90 days
#82

Details of work from C magma to melter tank 2

Dismantling and installing 4inch size pipeline

8 pcdm Delivery: 90 days
#83

Details of work from C magma to melter tank 3

Fabricating and installing 4inch size flanges

2 pcdn Delivery: 90 days
#84

Details of work from C magma to melter tank 4

Manufacturing and installing 4inch size bands

2 pcdn Delivery: 90 days
#85

Details of work from C magma to melter tank 5

Manufacturing and installing 4inch size nipples

3 pcdn Delivery: 90 days
#86

Repairing work details of final molasses tank 1

Removing transit heater installed on C Centrifugal machine opening side plate for cleaning and hydraulic servicing reinstalling in place and making all connections

2 per unit Delivery: 90 days
#87

Repairing work details of final molasses tank 2

Dismantling and installing 2inch size pipeline

6 pcdm Delivery: 90 days
#88

Repairing work details of final molasses tank 3

Fabricating and installing 2inch size flanges

2 pcdn Delivery: 90 days
#89

Repairing work details of final molasses tank 4

Manufacturing and installing 2inch size nipples

4 pcdn Delivery: 90 days
#90

Repairing work details of final molasses tank 5

Manufacturing and installing 2inch size valves

1 pcdn Delivery: 90 days
#91

Details of work from melter to magma line 1

Removing old taper of Sugar Hopper No 1 scrapping it fabricating new one from 3/5 mm MS plate installing and giving satisfactory trial

1 lamsam Delivery: 90 days
#92

Details of work from melter to magma line 2

Dismantling and installing 6inch size pipeline

16 pcdm Delivery: 90 days
#93

Details of work from melter to magma line 3

Manufacturing and installing 6inch size bands

3 pcdn Delivery: 90 days
#94

Details of work for A magma pump 1

Manufacturing and installing 2inch size nipples

1 pcdn Delivery: 90 days
#95

Details of work for A magma pump 2

Manufacturing and installing 6inch size bands

2 pcdn Delivery: 90 days
#96

Details of work for A magma pump 3

Manufacturing and installing 6inch size flanges

2 pcdn Delivery: 90 days
#97

Details of work for A magma pump 4

Manufacturing and installing 5inch size flanges

2 pcdn Delivery: 90 days
#98

Details of work for A magma pump 5

Manufacturing and installing 5inch size valves

2 pcdn Delivery: 90 days
#99

Details of work at ETP Effluent Treatment Plant1

Removing damaged/weak top and bottom sugar discharge chute of Canty Machine No 4 including flange scrapping fabricating new parts with 6 mm MS plate as per suit sample preparing all connections like angle channel etc fitting on side and giving satisfactory trial

1 lamsam Delivery: 90 days
#100

Details of work at ETP Effluent Treatment Plant2

Installing 2inch flow meter

2 per unit Delivery: 90 days
#101

Details of work at ETP Effluent Treatment Plant3

Dismantling the damaged 6inch dia pipeline from primary clarifier to anoxic tank and putting it in scrap yard and installing a new pipeline

100 pcdm Delivery: 90 days
#102

Details of work at ETP Effluent Treatment Plant4

Dismantling and installing 4inch size pipeline

7 pcdn Delivery: 90 days
#103

Details of work at ETP Effluent Treatment Plant5

Installing 4inch size valve/NRV

4 pcdn Delivery: 90 days
#104

Details of work at ETP Effluent Treatment Plant6

Fabricating 4inch size band

4 pcdn Delivery: 90 days
#105

Details of work at ETP Effluent Treatment Plant7

Dismantling and installing 2inch size pipeline

6 pcdm Delivery: 90 days
#106

Details of work at ETP Effluent Treatment Plant8

Fabricating and installing 2inch size flange

6 pcdn Delivery: 90 days
#107

Dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard

Dismantling the damaged 8inch dia pipeline from aeration tank to secondary tank and putting it in scrap yard

60 pcdm Delivery: 90 days
#108

Dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part

Dismantling diffusers installed in aeration tank and putting them in scrap yard and replacing the throat part

100 per unit Delivery: 90 days
#109

In Sulfate Removal Plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate

In Sulfate Removal Plant reaction chamber dismantling corroded 6 mm partition plate putting it in scrap yard and fabricating with new 8 mm plate

6 per meter Delivery: 90 days
#110

Dismantling corroded 2inch size treated water outlet line of ETP and putting in scrap yard and installing new 3inch size line at the same location

Dismantling corroded 2inch size treated water outlet line of ETP and putting in scrap yard and installing new 3inch size line at the same location

100 pcdm Delivery: 90 days
#111

Dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard

Dismantling 800 mm dia exhaust pipe line below turbine with nipple band flange and putting in scrap yard

3 per ton Delivery: 90 days
#112

Fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial

Fabricating 800 mm dia exhaust pipeline below turbine from 12 mm plate by bending and installing at position and providing satisfactory trial

6 per ton Delivery: 90 days
#113

Fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial

Fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending and installing at position and providing satisfactory trial

1 per ton Delivery: 90 days
#114

Fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into T shape and installing at position and providing satisfactory trial

Fabricating 800 mm dia exhaust pipeline below vapor cell 950 wag meter from 12 mm plate by bending into T shape and installing at position and providing satisfactory trial

1 running meter Delivery: 90 days
#115

Fabricating work

Fabricating 800 mm dia exhaust pipeline dummy/flange from 12 mm plate by bending and installing at position and providing satisfactory trial

4 per unit Delivery: 90 days
#116

Dismantling weak part of semichemiser 1000 wag meter

Dismantling weak part of semichemiser 1000 wag meter warm saser putting scrap in scrap yard fabricating from 12 mm thick plate by bending and installing with related connections and giving satisfactory trial Size dia 3 4 m

1 running meter Delivery: 90 days
#117

Dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial

Dismantling weak parts of old quad body no 2 and 3 20inch vapor pipe putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial

16 per meter Delivery: 90 days
#118

Dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial

Dismantling weak parts of vapor pipe 32inch size of vapor cell 1000 wag meter putting scrap in scrap yard fabricating from 8 mm thick plate by bending and installing and providing satisfactory trial

8 per meter Delivery: 90 days
#119

Dismantling weak part of 6inch size header of all juice heaters condensate and installing new one

Dismantling weak part of 6inch size header of all juice heaters condensate and installing new one

22 per meter Delivery: 90 days
#120

Removing all partition plates

Removing all partition plates of juice heater header by cutting straight and circular shapes cleaning tube plate completely and fabricating new circular and straight partition plates from 10/12 mm plate installing and preparing header with MS strips as before applying rubber strips and providing satisfactory trial

3 per unit Delivery: 90 days
#121

Cutting out quailons and all related angles

Cutting out quailons and all related angles fixed in clarifier compartments and refitting after completion of work and providing satisfactory trial

8 per unit Delivery: 90 days
#122

Carrying out work on clarifier pipeline 1

Patching inside clarifier with 6/8 mm MS plate

10 per square meter Delivery: 90 days
#123

Carrying out work on clarifier pipeline 2

Dismantling damaged 8inch size MS pipeline from clarifier clear juice overflow tank to sombox

18 pcdm Delivery: 90 days
#124

Carrying out work on clarifier pipeline 3

Installing 6inch size MS pipeline from clarifier compartments no 2 and 3 to mud tank and providing satisfactory trial

18 pcdm Delivery: 90 days
#125

Carrying out work on clarifier pipeline 4

Opening 6inch size valve and installing at designated location

2 pcdn Delivery: 90 days
#126

Carrying out work on clarifier pipeline 5

Fabricating 6inch size nipple and installing at designated location

2 pcdn Delivery: 90 days
#127

Carrying out work on clarifier pipeline 6

Fabricating 6inch size flange by cutting plate and dismantling to fit

3 pcdn Delivery: 90 days
#128

Carrying out work on clarifier pipeline 7

Dismantling 4inch size air pipeline above door including nipple band flange and putting scrap in scrap yard

18 pcdm Delivery: 90 days
#129

Carrying out work related to pipeline on big vacuum filter 1

Installing 4inch size air pipeline above door and providing satisfactory trial

18 pcdm Delivery: 90 days
#130

Carrying out work related to pipeline on big vacuum filter 2

Dismantling 6inch size MS pipeline of big vacuum filter mud tank overflow line and putting scrap in scrap yard

24 pcdm Delivery: 90 days
#131

Carrying out work related to pipeline on big vacuum filter 3

Fitting and trial of 6inch size MS pipeline overflow line of big vacuum filter mud tank at position

24 pcdm Delivery: 90 days
#132

Carrying out work related to pipeline on big vacuum filter 4

Fabricating 6inch size band

3 pcdn Delivery: 90 days
#133

Carrying out work related to pipeline on big vacuum filter 5

Fabricating 8inch size band

3 pcdn Delivery: 90 days
#134

Carrying out work related to pipeline on big vacuum filter 6

Dismantling 8inch size pipeline from big vacuum filter pump to condenser and putting scrap in scrap yard

24 pcdm Delivery: 90 days
#135

Fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position

Fitting and trial of 8inch size pipeline from big vacuum filter pump to condenser at position

24 pcdm Delivery: 90 days
#136

Dismantling 4inch MS pipeline from filter juice header to vibro screen

Dismantling 4inch MS pipeline from filter juice header to vibro screen

24 pcdm Delivery: 90 days
#137

Fitting and trial of 4inch MS pipeline from filter juice header to vibro screen at position

Fitting and trial of 4inch MS pipeline from filter juice header to vibro screen at position

24 pcdm Delivery: 90 days
#138

Making 4inch size nipple

Making 4inch size nipple

2 pcdn Delivery: 90 days
#139

Opening 4inch size valve

Opening 4inch size valve

1 pcdn Delivery: 90 days
#140

Installing 4inch size valve at the specified location

Installing 4inch size valve at the specified location

1 pcdn Delivery: 90 days
#141

Carrying out work related to small vacuum filter pipelines etc 1

Cutting 4inch size flange from plate making it and fitting after drilling

2 pcdn Delivery: 90 days
#142

Carrying out work related to small vacuum filter pipelines etc 2

Dismantling 3inch size pipeline

36 pcdm Delivery: 90 days
#143

Carrying out work related to small vacuum filter pipelines etc 3

Installing and fitting 3inch size line at position and giving satisfactory trial

36 pcdm Delivery: 90 days
#144

Carrying out work related to small vacuum filter pipelines etc 4

Making and installing 3inch size T

10 pcdn Delivery: 90 days
#145

Carrying out work related to small vacuum filter pipelines etc 5

Making and installing 3inch size nipple

4 pcdn Delivery: 90 days
#146

Carrying out work related to small vacuum filter pipelines etc 6

Cutting 3inch size flange from plate making it and installing

4 pcdn Delivery: 90 days
#147

Carrying out work related to small vacuum filter pipelines etc 7

Making and installing 3inch size band

6 pcdn Delivery: 90 days
#148

Carrying out work related to small vacuum filter pipelines etc 8

Dismantling 8inch size clear juice overflow pipeline

18 pcdm Delivery: 90 days
#149

Carrying out work related to small vacuum filter pipelines etc 9

Installing and fitting 8inch size clear juice overflow pipeline at position and giving satisfactory trial

18 pcdm Delivery: 90 days
#150

Carrying out work related to pipeline from juice sulfiter tank to juice tank 1

Making and installing 3inch size band

3 pcdn Delivery: 90 days
#151

Carrying out work related to pipeline from juice sulfiter tank to juice tank 2

Dismantling 6inch size pipeline

18 pcdm Delivery: 90 days
#152

Carrying out work related to pipeline from juice sulfiter tank to juice tank 3

Installing and fitting 6inch size pipeline at position and giving satisfactory trial

18 pcdm Delivery: 90 days
#153

Carrying out work related to pipeline from juice sulfiter tank to juice tank 4

Making and installing 6inch size band/elbow at specified location

2 pcdn Delivery: 90 days
#154

Carrying out work related to pipeline from juice sulfiter tank to juice tank 5

Making and installing 6inch size T

2 pcdn Delivery: 90 days
#155

Carrying out work related to pipeline from juice sulfiter tank to juice tank 6

Dismantling 4inch size pipeline

18 pcdm Delivery: 90 days
#156

Carrying out work related to pipeline from juice sulfiter tank to juice tank 7

Installing and fitting 4inch size pipeline at position and giving satisfactory trial

18 pcdm Delivery: 90 days
#157

Carrying out work related to pipeline from juice sulfiter tank to juice tank 8

Making and installing 4inch size band

4 pcdn Delivery: 90 days
#158

Carrying out work related to pipeline from juice tank to juice sulfiter

Making and installing 4inch size T

4 pcdn Delivery: 90 days
#159

Carrying out work related to pipeline from juice tank to juice sulfiter

Dismantling 10inch size pipeline

6 pcdm Delivery: 90 days
#160

Carrying out work related to pipeline from juice tank to juice sulfiter

Installing fitting and trial of 10inch size pipeline at position

6 pcdm Delivery: 90 days
#161

Carrying out work related to pipeline from juice tank to juice sulfiter

Making and installing 10inch size T

3 pcdn Delivery: 90 days
#162

Carrying out work related to pipeline from juice tank to juice sulfiter

Making and installing 10inch size dummy/flange

4 pcdn Delivery: 90 days
#163

Carrying out work related to pipeline from juice tank to juice sulfiter

Dismantling 6inch pipeline

18 pcdm Delivery: 90 days
#164

Carrying out work related to pipeline from juice tank to juice sulfiter

Installing fitting and trial of 6inch size pipeline at position

18 pcdm Delivery: 90 days
#165

Carrying out work related to pipeline from juice tank to juice sulfiter

Making and fitting 6inch size flange

2 pcdn Delivery: 90 days
#166

Carrying out work related to pipeline from juice tank to juice sulfiter

Opening and binding 6inch size valve

1 pcdn Delivery: 90 days
#167

Carrying out work related to pipeline from juice tank to juice sulfiter

Dismantling 4inch size pipeline

6 pcdm Delivery: 90 days
#168

Carrying out work related to pipeline from juice tank to juice sulfiter

Installing fitting and trial of 4inch size pipeline at position

6 pcdm Delivery: 90 days
#169

Carrying out work related to pipeline from juice tank to juice sulfiter

Making and installing 8inch and 6inch size cross

1 pcdn Delivery: 90 days
#170

Carrying out work related to pipeline from juice tank to juice sulfiter

Dismantling 4inch size ammonia pipeline of semichemiser quad

12 pcdm Delivery: 90 days
#171

Carrying out work related to pipeline from juice tank to juice sulfiter

Installing 4inch size ammonia pipeline of semichemiser quad at position

12 pcdm Delivery: 90 days
#172

Carrying out work related to pipeline from juice tank to juice sulfiter

Making 4inch size band

1 pcdn Delivery: 90 days
#173

Carrying out work related to pipeline from juice tank to juice sulfiter

Making 4inch size T

2 pcdn Delivery: 90 days
#174

Carrying out work related to pipeline from juice tank to juice sulfiter

Making 4inch size flange

2 pcdn Delivery: 90 days
#175

Carrying out work related to pipeline from juice tank to juice sulfiter

Dismantling 2inch size pipeline

2 pcdm Delivery: 90 days
#176

Carrying out work related to pipeline from juice tank to juice sulfiter

Fixing 2inch size pipeline in position

2 pcdm Delivery: 90 days
#177

Carrying out work related to pipeline from juice tank to juice sulfiter

Fabricating and installing 2inch size flange

1 pcdn Delivery: 90 days
#178

Carrying out work related to pipeline from juice tank to juice sulfiter

Dismantling new Quad No 2 vapor pipe 24inch size vapor pipeline fabricating it by bending with 10 mm thick plate and installing

10 pcdm Delivery: 90 days
#179

Carrying out work related to pipeline from juice tank to juice sulfiter

Fabricating and installing 24inch size bends

1 pcdn Delivery: 90 days
#180

Carrying out work related to pipeline from juice tank to juice sulfiter

Fabricating and installing 24inch size tees

1 pcdn Delivery: 90 days
#181

Carrying out work related to pipeline from juice tank to juice sulfiter

Fabricating and installing 24inch size flange/dummy

1 pcdn Delivery: 90 days
#182

Carrying out work related to pipeline from juice tank to juice sulfiter

Dismantling 24inch size pipeline

10 pcdm Delivery: 90 days
#183

Carrying out work related to pipeline from juice tank to juice sulfiter

Fitting 24inch size pipeline in position

10 pcdm Delivery: 90 days
#184

Carrying out work related to pipeline from juice tank to juice sulfiter

Fabricating and installing 24inch size flange

1 pcdn Delivery: 90 days
#185

Carrying out work related to pipeline from juice tank to juice sulfiter

Cutting damaged 6inch syrup pump header fabricating new header and installing along with fitting all related nipples valves etc and conducting satisfactory trial

2 per header Delivery: 90 days
#186

Carrying out work related to pipeline from juice tank to juice sulfiter

Dismantling bent incoming and outgoing wax and heater cell and partition plate between double beat valve of juice heater/ juice heater header fabricating new one using 12/10 mm plate as before installing and conducting satisfactory trial

6 per box Delivery: 90 days
#187

Carrying out work related to pipeline from juice tank to juice sulfiter

Dismantling 6inch condensate header of juice heaters and replacing the weak part

22 per meter Delivery: 90 days
#188

Carrying out work related to pipeline from juice tank to juice sulfiter

Fitting 6inch size pipeline in position and conducting satisfactory trial

22 pcdm Delivery: 90 days
#189

Carrying out work related to pipeline from juice tank to juice sulfiter

Fabricating and installing 6inch size flange

20 pcdn Delivery: 90 days
#190

Carrying out work related to pipeline from juice tank to juice sulfiter

Fabricating and installing 6inch size nipple

2 pcdn Delivery: 90 days
#191

Works related to juice sulfiter gas pipeline

Fabricating and installing 6inch size tees

2 pcdn Delivery: 90 days
#192

Works related to juice sulfiter gas pipeline

Dismantling and fitting 6inch size pipeline in position and conducting satisfactory trial

6 pcdm Delivery: 90 days
#193

Works related to juice sulfiter gas pipeline

Fabricating and installing 6inch size flange

18 pcdn Delivery: 90 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements for the last three financial years or CA certificate indicating turnover

4

Past experience proofs: contract copies with invoices and client execution certificates or equivalent

5

Technical compliance certificates (as applicable)

6

OEM authorizations or supplier certifications (if required by the bid)

7

Any other documents listed in the Bid Document/ATC or Corrigendum

Corrigendum Updates

2 Updates
#1

Update

18-Jul-2026

Extended Deadline

21-Jul-2026, 3:00 pm

Opening Date

21-Jul-2026, 3:30 pm

#2

Update

13-Jul-2026

Extended Deadline

17-Jul-2026, 3:00 pm

Opening Date

17-Jul-2026, 3:30 pm

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for the UP cooperative sugar federation tender in Bijnor 2026

Bidders should review the ATC and corrigenda, prepare turnover documents (audited statements/CA certificate), compile past experience proofs (contract copies or client certificates), and upload GST, PAN, and required certificates. Ensure compliance with the 25% quantity option and minimum 30-day delivery timeline.

What documents are required for the Bijnor UP procurement bid 2026

Required documents include GST certificate, PAN, audited turnover statements for the last three years or CA certificate, past project experience proofs, technical compliance certificates, OEM authorizations if applicable, and any certificates specified in the Bid Document/ATC.

What is the estimated value and scope for the Bijnor tender

The tender has an estimated value of ₹450,000 with 193 BOQ items reported as N/A; bidders should confirm item specifics from the official bid document and be prepared for quantity variations up to 25%.

What are the delivery and extension terms for this UP tender

Delivery begins from the last date of the original order; additional time is (increased quantity / original quantity) × original delivery period, with a minimum of 30 days. The purchaser may extend time to cover up to the original delivery period.

How is eligibility determined for bidders in this UP tender

Eligibility requires meeting turnover criteria for the last three years, providing past-experience proofs (contracts or client certificates), and uploading required certificates per ATC and corrigenda; non-compliance risks bid rejection.

What standards or certifications are required for submission

The tender data does not specify standards; bidders must rely on the Bid Document/ATC for exact certification requirements and any OEM authorizations or quality standards referenced there.

When evaluating bids, what should bidders prepare in advance for EMD

EMD details are not provided in the data; bidders must verify the exact EMD amount, payment method, and submission procedure in the Bid Document and ensure readiness before the bid deadline.

Which evidence proves past project experience in this tender

Acceptable proofs include contract copies with invoices and bidder self-certification, execution certificates from clients, or other supporting documents like third-party inspection notes, as permitted in the ATC.

Similar Tenders

5 found
Urgent

Open Tender for Repairing of 200 HP Induction Pump at Gujaini Jalkal Pump House Unit No.-3 in KANPUR NAGAR, UTTAR PRADESH

Directorate of Local Bodies UP

📍 KANPUR NAGAR, UTTAR PRADESH

EMD: ₹2,900
⏰ Deadline: 5 days left
🛒 Type: Works
View EPROCURE

Pkg1 Condensate Pump Sipat

Bharat Heavy Electricals Limited (bhel)

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Government Tender Published for Complete Repairing of one (01) no. DSM-3 kirloskar make pumps. Sl.No. WS/DSM-III/01 in DHANBAD, JHARKHAND

Bharat Coking Coal Limited

📍 DHANBAD, JHARKHAND

EMD: ₹1,210
Est: ₹81,430
⏰ Deadline: 3 days left
🛒 Type: Works
View EPROCURE

Government Tender Published for Call for Objection notice for Repair of DVT Pump (Make-Daesung Maref) 23 nos Installed in Various department in AIIMS in DEHRADUN, UTTARAKHAND

All India Institute of Medical Sciences-Rishikesh

📍 DEHRADUN, UTTARAKHAND

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View EPROCURE

Contract Bidding Open For KMC/S_D/TDPS/P1/26-27 in KOLKATA, WEST BENGAL

KOLKATA MUNICIPAL CORPORATION

📍 KOLKATA, WEST BENGAL

EMD: ₹6,000
⏰ Deadline: 2 weeks left
🛒 Type: Works
View EPROCURE