TenderDekho Logo
Active GEM

Rural Development Department Bihar Drinking Water Purification & Cooling System Tender 2026 Banka Bihar SITC

Bid Publish Date

24-Oct-2026, 4:38 pm

Bid End Date

03-Nov-2026, 5:00 pm

Location

Progress

Issue24-Oct-2026, 4:38 pm
AwardPending

Key Highlights

  • • Brand/OEM requirement: OEM Authorization Letter for the BID
  • • Technical standards: ISI/ISO certificates if applicable; IS 550 not specified but reference to standard compliance may be implied
  • • Special clause: Bid quantity/duration adjustment up to 25% during contract issuance and execution
  • • Eligibility: Proof of past performance on water purification and civil works; 3-year financials and CA-audited turnover

Tender Overview

Rural Development Department, Bihar invites bids for the SITC of a complete drinking water purification and cooling system, including civil construction, water purification, and storage infrastructure at Gram Panchayat Pair in BANKA, BIHAR 813101. The scope encompasses installation, civil works, and associated water storage facilities, with no BOQ items listed. Bidders must provide OEM authorization, past performance proof, and comprehensive technical literature. The procurement emphasizes local Bihar suppliers with documented GSTIN and financial disclosures. The opportunity requires adherence to documented ATC terms and standard bid documentation, with quantity flexibility up to 25% per contract terms.

Technical Specifications & Requirements

  • System scope: complete drinking water purification and cooling system with civil works, storage infrastructure, and water purification equipment
  • Documentation: OEM Authorization, product brochures, and detailed BOQ/price quotations
  • Eligibility evidence: past performance proofs, PAN, GSTIN (State Bihar), 3-year financials, ITRs, GSTR-3B (last 6 months), ISO/MSME/ZED/CVC certificates, non-blacklist declaration, ATC acceptance
  • Compliance focus: local preference in Bihar, adherence to ISI/ISO where applicable, and demonstrated financial stability
  • Delivery/installation location: Gram Panchayat Pair; civil construction tied to water infrastructure
  • Tender flexibility: quantity/duration adjustments up to 25% during contract execution per buyer terms

Terms, Conditions & Eligibility

  • EMD: not specified in data; ensure bid compliance with typical security deposit per state norms
  • Payment terms: linked to delivery/acceptance; no explicit percentage provided in data
  • Documentation: PAN, GSTIN, recent financials, ITRs, GSTR-3B, OEM authorizations, and ATC Acceptance Letter
  • Compliance: Non-Blacklist declaration; IS0/MSME/ZED/CVC certifications as applicable; CA-audited turnover for 3 years
  • Experience: proof of relevant work in similar SITC/water infrastructure projects; past performance evidence required
  • ATC: mandatory acceptance of Additional Terms & Conditions

Key Specifications

  • Product/service: SITC of complete drinking water purification and cooling system with civil construction

  • Delivery location: Gram Panchayat Pair, Banka, Bihar 813101

  • Documentation: OEM Authorization, product brochures, and detailed BOQ/price quotation

  • Eligibility: proof of relevant experience in water infrastructure SITC projects, 3-year financials

  • Standards: ISI/ISO certifications where applicable; local Bihar GST compliance

Terms & Conditions

  • EMD/security deposit: terms to be clarified in bidder documents

  • Delivery schedule: execution within contract timelines with 25% quantity variation

  • Payment terms: to be defined in contract; ensure clear schedule on delivery and acceptance

Important Clauses

Payment Terms

Terms require clarification; typical practice involves milestone-based payments linked to delivery/acceptance

Delivery Schedule

Contract may permit up to 25% variation in quantity or duration; ensure schedule aligns with Gram Panchayat Pair requirements

Penalties/Liquidated Damages

Not specified; verify in final tender documents for LD coefficients or performance bonds

Bidder Eligibility

  • Experience in supplying or implementing SITC of water purification and cooling systems with civil works

  • CA-audited turnover for last 3 financial years meeting threshold (to be clarified in tender)

  • GSTIN active in Bihar; PAN and ITR compliance; absence of blacklisting

Advertisement

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Compliance

Yes

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

25

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Service

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - SITC of a complete drinking water purification and cooling system, including civil construction, water purification, and storage infrastructure at Gram Panchayat Pair; R..

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Delivery Locations

1

Delivery Cities

Banka

Delivery Pincodes

813110

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Arti Devi813110,GRAM PANCHAYAT- PAIR, BLOCK- DHORAIYABankaBihar813110Project / Lumpsum Based-Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 0

Authority Records

RURAL DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-10078019.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Block Office Dhoraiya

Grievance Contact

[email protected]

Categories 14

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

OEM Authorization Letter on OEM letterhead

2

Product specification brochure and detailed literature

3

Past performance proofs for relevant SITC/water infrastructure projects

4

PAN Card copy (self-attested, signed, stamped)

5

GSTIN Certificate (self-attested, signed, stamped, with visible GST number)

6

Financial Statements (P&L, Balance Sheet, turnover certificate for last 3 financial years, CA audited with UDIN)

7

ITR copies for last 3 financial years

8

GSTR-3B copies for last 6 months

9

ISO/MSME/ZED/CVC certificates (self-attested)

10

Non-Blacklist Declaration on ₹100 stamp paper, notarized

11

ATC Acceptance Letter (signed)

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for the drinking water purification tender in Banka Bihar 2026

Bidders must provide OEM authorization, product brochures, past performance proofs, PAN, GSTIN, three years of financial statements (CA audited with UDIN), ITRs, GSTR-3B (last 6 months), and non-blacklist declarations along with ATC Acceptance. Ensure compliance with Terms/ATC and local Bihar GST requirements.

What documents are required for this Rural Development Department procurement

Required documents include OEM authorization, product brochures, past performance proof, PAN, GSTIN, three years of financial statements (CA audited), ITRs, GSTR-3B (last 6 months), ISO/MSME/ZED/CVC certificates, non-blacklist declaration, and ATC Acceptance Letter.

What are the technical specifications for the water purification system in this tender

The tender covers SITC of a complete drinking water purification and cooling system with civil construction and storage infrastructure. Specific ISI/ISO certifications may apply; detailed BOQ not provided yet, so bidders should attach product brochures and literature showing compliance.

When is the delivery/completion timeline for the Banka water system project

Exact delivery dates are not disclosed; the contract allows up to 25% variation in duration/quantity. Bidders should seek clarification on project start date in the bid document and align milestones with Gram Panchayat Pair installation schedule.

What are the payment terms for the Bihar water infrastructure procurement

Payment terms are not explicitly stated in the available data. Typically, milestones align with delivery/acceptance. Bidders should confirm acceptance criteria, delivery verification, and payment schedule in the contract and ensure compliance with Bihar state procurement norms.

What experience is required to qualify for this SITC water project

Applicants must demonstrate past performance on similar SITC/water infrastructure projects, provide audited turnover for the last 3 financial years, and show ongoing compliance with GST and tax documents. Ensure ISO/MSME/ZED/CVC certifications where applicable.

What is the role of ATC Acceptance Letter in this bid

ATC Acceptance Letter is mandatory, signifying agreement to Additional Terms & Conditions. Include this with the bid to demonstrate readiness to comply with buyer-specific clauses, including quantity/duration adjustments and project-specific conditions.

Advertisement