TenderDekho Logo
Active GEM

Bids are Invited For Power Transformer, Oil immersed type,Power Transformer, Oil immersed type,Power Transformer, Oil im in SAMBALPUR, ODISHA

Bid Publish Date

28-Aug-2026, 10:33 am

Bid End Date

18-Sep-2026, 11:00 am

EMD

₹11,33,000

Value

₹8,50,74,870

Progress

Issue28-Aug-2026, 10:33 am
AwardPending

A tender has been published for Mahanadi Coalfields Limited Power Transformer, Oil immersed type (Q3) in SAMBALPUR, ODISHA. Quantity: 8 by. Submission Deadline: 18-09-2026 11: 00: 00. Check eligibility and apply.

Tender Data

Bid Details

Quantity

8

Category

Power Transformer, Oil immersed type

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

7 Days

Preference & Exemptions

EMD Required

Yes

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

Yes

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Power Transformer, Oil immersed type (Q3)

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

11

Payment Timelines

Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Sambalpur

Delivery Pincodes

768020

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Doredla Tharun Sai768020,MAHANADI COALFIELDS LIMITED, AT & PO - JAGRUTI VIHAR, BURLASambalpurOdisha7680202180-

Authority Records

MINISTRY OF COALCOAL INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-9534808.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

CATALOG-Specification-2

CATALOG Specification

CATALOG-Specification-3

CATALOG Specification

CATALOG-Specification-4

CATALOG Specification

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Mcl Sambalpur Odisha

Grievance Contact

[email protected]

Categories 9

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Additional Doc 1 (Requested in ATC)

4

Additional Doc 2 (Requested in ATC)

5

Additional Doc 3 (Requested in ATC)

6

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Specifications 4 Items

Item #1 Details

View Catalog
Category Specification Requirement
RATING Rated Voltage - HV (in KV) 33
RATING Rated Voltage - LV (in kV) 11
RATING Maximum system voltage - HV (in kV) 12, 24, 36, 72.5, 145, 245, 420, 800, 3.6, 7.2
RATING Maximum system voltage - LV (in kV) 0.25, 0.46, 7.2, 12, 36, 72.5, 145, 245
RATING Rated power (in MVA) 3.15
RATING No. of Phase 1, 3, 3 Ph. 2 Winding
GENERIC Conformity of the specification IS:2026 (Part 1) : 2011 latest, IS:2026 (Part 1) : 2011 latest and as per Annexure - A attached for Coal India, as per IEC:60076:2011 latest
GENERIC Designed for Outdoor
GENERIC Installation, Testing and Demonstration Yes, No, Yes. Including civil works related to installation and commissioning of transformer
INSULATION LEVEL Insulation Levels, Dielectric Tests and External Clearances in Air as per IS: 2026 Part 3: 2009 latest, as per IEC:60076:2011 latest
INSULATION LEVEL Standard rated short duration power-frequency withstand voltage, r.m.s value (in kV) 10, 20, 28, 50, 70, 140, 150, 275 (for 132 KV), 70 (for 33 KV), 38, 95, 250, 450, 550, 650, 750, 850, 950, 1050, 1175, 1300, 1425, 1550, 1675, 1800, 1950, 2100, 230, 275, 325, 395, 460, 510, 570, 630
INSULATION LEVEL Standard rated lightning impulse withstand voltage (in kV, peak) 20, 40, 60, 75, 95, 125, 145, 170, 325, 650 (for 132 KV), 170 (for 33 KV), 250, 450, 550, 650, 750, 850, 950, 1050, 1175, 1300, 1425, 1550, 1675, 1800, 1950, 2100
WINDING Winding insulation Class A
WINDING Connection symbol Dyn 11, Star / Star (YNyno), Not applicable, HV- Star, Delta LV- star, Delta
WINDING Terminals of all windings Out of the tank through bushings for external connections, With cable box
WINDING Material of barrier insulation including spacers High Density Press board
TAP CHANGER Type of Tap Changer Off Circuit, On Load, NA
TAP CHANGER Winding tapped at HV, NA, LV
TAP CHANGER No. of tappings (in Nos.) 17, 9, NA, 16 (Excluding normal), 5
TAP CHANGER Range of tappings +10% to -10% in equal seps of 1.25%, +5% to-15% in equal seps of 1.25%, +5% to-5% in equal seps of 7.5%, NA, Tap range : - 15% to + 5% Rate of steps : 1.25 %of 132kv, (‒) 9 % to (+) 3%
CONSTRUCTION Material of core CRGO (ColdRolled GrainOriented steel), CRGO silicon alloy steel
CONSTRUCTION The maximum flux density in any part of the cores and yoke at normal voltage and frequency < 1.5 Tesla, < 1.7 Tesla, < 1.9 Tesla, < 1.6 Tesla
CONSTRUCTION Type of cooling ONAN, ONAN cooling 80% for 16 MVA,, ONAF cooling 100% for 20 MVA, ONAN cooling 80% for 32 MVA,, ONAF cooling 100% for 40 MVA, ONAF, OFAF, OFDF, OFWF
CONSTRUCTION Transformer filled with oil Yes, No
CONSTRUCTION Method of system earthing LV Winding: Solidly earthed, HV connections : Star with neutral solidly earthed, LV connections : Star with neutral solidly earthed, Neutral of HV,LV solidly earthed
CONSTRUCTION Type of oil preservation system Freely breathing type, Conservator type, Diaphragm type, Inert Gas Pressure type, Sealed tank type
CONSTRUCTION Temperature rise limit - Top oil measured by thermometer < 40 deg. C, < 45 deg. C, < 50 deg. C
CONSTRUCTION Temperature rise limit - Winding temperature by resistance < 45 deg. C, < 55 deg. C
CONSTRUCTION Percentage of impedance voltage on normal tap and MVA base at 75 deg. C corresponding to HV/ LV rating (in %) 6.25, 7.15, 8.35, 10, 12.5, 13, 14, 15
CONSTRUCTION No Load Losses (Fixed Loss) , Maximum (in KW) 3, 4, 4.6, 5.5, 7, 7.5, 16, 25, 9, 10, 12, 14, 18, 30, 35, 45, 60, 70, 75, 90
CONSTRUCTION Load losses at 75°C, Maximum ( in KW) 16, 23, 36, 40, 50, 65, 130, 185, 80, 90, 95, 110, 125, 140, 200, 245, 260, 400, 440, 450, 500
CONSTRUCTION Minium Creppage Distance (in mm) HV-900 mm, LV-300 mm, 25 mm per KV, 31 mm per KV, 35 mm per KV
TRANFORMER TANK Transformer tank construction shall conform in all respect to Clause 15 of IS 1180(Part1):2014., as per Annexure-A attached for Coal India, Bell shaped, Conventional
TRANFORMER TANK Transformer tank top cover Detachable with bolted flanged gasket joint, as per Annexure-A attached for Coal India, Bolted, Welded
TRANFORMER TANK The surface of the cover Suitable sloped, as per Annexure-A attached for Coal India, Flat
TRANFORMER TANK The transformer tank supported on steel structure, as per Annexure-A attached for Coal India
ADD ON ITEMS Oil conservator tank (in Nos.) 1, 0
ADD ON ITEMS Buchholz Relay 1, 0
ADD ON ITEMS Oil Temperature Indicator (OTI) (in Nos.) 1, 0, 1 No. For Local & remote winding with contacts
ADD ON ITEMS Winding Temperature indicator (WTI) (in Nos.) 1, 0, 2 Nos. Per phase, 1 No. For Local & remote winding with contacts
ADD ON ITEMS Pressure Relief Device (in Nos.) 1, 0, 2, 3
ADD ON ITEMS Oil Level Indicator (in Nos.) 1, 0
ADD ON ITEMS Silica Gel Breather with Silica Gel (in Nos.) 1, 0, 2, 3
ADD ON ITEMS Drain Valve on transformer tank (in Nos.) 1, 0, 2
ADD ON ITEMS Filter Valve on transformer tank (in Nos.) 1, 2, 0
ADD ON ITEMS Oil sampling valve on transformer tank (in Nos.) 1, 0, 2
ADD ON ITEMS Air release plug (in Nos.) 150 mm dia, 1 No., NA, 15 mm NB 1 no.
ADD ON ITEMS Lifting eyes or lugs for the top cover, core and coils and for the complete transformer Yes, No
ADD ON ITEMS Tank earthing terminals with associated nuts and bolts for connections to grounding strip 2 sets, 0
ADD ON ITEMS HV Bushings according to highest system voltage (in Nos.) 2 (Porcelain), 3 (Porcelain), 0, 1 No. Porcelain with metal parts and gaskets
ADD ON ITEMS LV Bushings according to highest system voltage (in Nos.) 2 (Porcelain), 3 (Porcelain), 0, 1 No. Porcelain with metal parts and gaskets
ADD ON ITEMS Terminal arrangement: for HV/LV bushings with arcing horns Yes, No
ADD ON ITEMS Suitable terminal connector for HV & LV terminal for holding Conductor Yes. Suitable for Panther type, No
ADD ON ITEMS Bus Bars Copper at LV side, No
ADD ON ITEMS Cable termination box 1 No. at LV side, No, 1 No. at HV side and 1 No. at LV side
ADD ON ITEMS Arrangement for Auxilary supply voltage for For Alarm, For Relays, NA
ADD ON ITEMS Marshalling box with required glands, locks, glass door, terminal Board, heater with switch, illumination lamp with switch etc to accommodate temperature indicators terminal blocks etc 1, 0
ADD ON ITEMS Ingress protection for Marshalling Box IP 55, IP 54
ADD ON ITEMS Padlocks and locking key arrangements for Mrashalling box, Valves, NA
ADD ON ITEMS Foundation bolts for wheel locking devices of Transformer Yes, No
ADD ON ITEMS Bi-metallic terminal connector/ clamp/ washers suitable for fixing to bushing terminals Yes, No
ADD ON ITEMS Other requrements Air release plug, 1 No., Rating Plate, NA, 1 No. Neutral Bushing, Metal parts for Bushings, Gaskets for Bushings, Magnetic oil level gauge: 1 No., Magnetic Oi Level Gauge with Low oil level alarm contacts, 1 No. Cooler fan with motor, HV & LV neutral : brought out on separate bushing, 1 No. Dial type thermometer, Thermometer: Maximum reading pointer, Thermometer: adjustable, Thermometer: Poterntial free contacts for alarm and trip for top oil temperature ., Additional pockets for mercury-in-glass thermo meter for measuring oil and winding temperature, Explosion/ relief vent with double diaphragm equalizer connection, Diagram plates, Terminal marking plate, Identification marking plate, Approved Pressure Relief Device for Rapid Release of Pressure, Under carriage with jacking pads, Under carriage with hauling holes / hook, Supervisory alarm for oil temperature indicator, Supervisorytrip contacts for oil temperature indicator, Supervisory alarm for gas operated double float relay, Supervisory trip contacts for gas operated double float relay, Supervisory alarm contacts for oil level indicator, Inspection cover, Oil filling hole and cap, Thermometer for Oil Temp Indicator 150mm, Dial Type.
ADD ON ITEMS Agreed for unloading of transformer at site Yes, No
SPECIAL TEST Agreed to furnish special test reports as per Cl.10.1.3 of IS:2026 (Part 1) latest, NA
SPECIAL TEST Test reports for dielectric special tests Yes, No
SPECIAL TEST Test report for determination of capacitances winding to earth, and between windings Yes, No
SPECIAL TEST Test report for determination of transient voltage transfer characteristics Yes, No
SPECIAL TEST Test reports for measurement of zero sequence impedance (s) on three phase transformers Yes, No
SPECIAL TEST Test report for determination of sound levels Yes, No
SPECIAL TEST Test report for measurement of harmonics of the no load current Yes, No, Yes. Including Contact Resistance Test (<2 miliohm)
SPECIAL TEST Test report for measurement of the power taken by the fan and oil pump motors Yes, No, Yes. Including Measurement of Impedance voltage at highest rated and lowest voltage taps
SPECIAL TEST Test report for measurement of insulation resistance to earth of the windings and or measurement of dissipation factor of the insulation system capacitances Yes, No, Yes. Including Ratio and high voltage magnetisation current test.
CERTIFICATIONS Agreed for stage inspection as and when required by buyer / consingee Yes as per buyer requirements, No
CERTIFICATIONS Agreed to furnish Guaranteed Technical Particulars (GTP) and complete drawings of Power Transformer as and when required by buyer / consignee Yes, No
CERTIFICATIONS Agreed to furnish routine test reports to buyer / consingee on demand as per Cl.10.1.1 of IS:2026 (Part 1) latest, No, as per Annexure-A attached for Coal India
CERTIFICATIONS Availability of Type test report from Central Government/NABL/ILAC accridiated laoratory to prove conformity of the specification Yes, No, as per Annexure-A attached for Coal India
CERTIFICATIONS Agreed to furnish routine and type tet reports for porcelain bushings Yes, No