TenderDekho Logo
GEM

Open Tender for Saturable absorber mirror 800nm, absorptance 1 percent,Saturable absorber mirror 800nm, absorptance in AHMEDABAD, GUJARAT

Bid Publish Date

24-Mar-2025, 5:40 pm

Bid End Date

14-Apr-2025, 6:00 pm

Progress

Issue24-Mar-2025, 5:40 pm
Technical04-Jul-2025, 5:38 pm
Financial
Award07-Aug-2025, 12:00 am
Explore all 5 tabs to view complete tender details

Quantity

22

Category

Saturable absorber mirror 800nm, absorptance 1 percent

Bid Type

Two Packet Bid

Categories 1

Indian Space Research Organization has released a public tender for Saturable absorber mirror 800nm, absorptance 1 percent, Saturable absorber mirror 800nm, absorptance 6 percent, Saturable absorber mirror 1030nm, absorptance 2. 5 percent, Saturable absorber mirror 1030nm, absorptance 3. 5 percent, Saturable absorber mirror 1040nm, absorptance 1 percent, Saturable absorber mirror 1040, absorptance 4 percent, Saturable absorber mirror 1040, absorptance 1. 5 percent, Saturable absorber mirror 1064nm, absorptance 2 percent, Saturable absorber mirror 1064nm, absorptance 0. 7 percent, Saturable absorber mirror 1064nm, absorptance 3 percent, compact microchip laser module, Picosecond fiber laser kit in AHMEDABAD, GUJARAT. Quantity: 22. Submission Deadline: 14-04-2025 18: 00: 00. Download documents and apply online.

Documents 6

GeM-Bidding-7675757.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Primary Mirror Cell,Primary Mirror Mount,Seondary Mirror cell,Secondary Mirror Mount,Detector Mount

Indian Institute Of Astrophysics (iia)

BANGALORE, KARNATAKA

Posted: 9 April 2025
Closed: 12 May 2025
GEM

Glass Mirror with Side Mounting,Side Mounting,L Button,Looking Mirror 2 ft x 2 ft,Looking Mirror 2

Indian Army

Posted: 3 November 2024
Closed: 25 November 2024
GEM

Front Mirror,Back Side Mirror,Left Side Mirror,Right Side Mirror,Hrs Metre with Cable,Back Light,Op

Indian Army

JAMMU, JAMMU & KASHMIR

Posted: 23 January 2025
Closed: 13 February 2025
GEM

Folding Mirror-2(FM-2) (With mount assembly),Folding Mirror-1(FM-1) (With mount assembly),Dichroic

Office Of Dg (ecs)

HYDERABAD, TELANGANA

Posted: 15 October 2025
Closed: 19 November 2025
GEM

Floor Matting,Rubber Mat 4 ft x 3 ft,Looking Mirror with fitting 6 ft x 6.5 ft,Looking Mirror with

Indian Army

JALANDHAR, PUNJAB

Posted: 12 December 2024
Closed: 3 January 2025
GEM

Bill of Quantities (BOQ) 12 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Saturable absorber mirror 800nm, absorptance 1 percent As per specifications document 2 nos [email protected] 90
2 Saturable absorber mirror 800nm, absorptance 6 percent As per specifications document 2 nos [email protected] 90
3 Saturable absorber mirror 1030nm, absorptance 2.5 percent As per specifications document 2 nos [email protected] 90
4 Saturable absorber mirror 1030nm, absorptance 3.5 percent As per specifications document 2 nos [email protected] 90
5 Saturable absorber mirror 1040nm, absorptance 1 percent As per specifications document 2 nos [email protected] 90
6 Saturable absorber mirror 1040, absorptance 4 percent As per specifications document 2 nos [email protected] 90
7 Saturable absorber mirror 1040, absorptance 1.5 percent As per specifications document 2 nos [email protected] 90
8 Saturable absorber mirror 1064nm, absorptance 2 percent As per specifications document 2 nos [email protected] 90
9 Saturable absorber mirror 1064nm, absorptance 0.7 percent As per specifications document 2 nos [email protected] 90
10 Saturable absorber mirror 1064nm, absorptance 3 percent As per specifications document 2 nos [email protected] 90
11 compact microchip laser module As per specifications document 1 no [email protected] 90
12 Picosecond fiber laser kit As per specifications document 1 kit [email protected] 90

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1ADVANCED PHOTONICS   Under PMA-07-04-2025 17:38:47Qualified
2INFRARED OPTICS PRIVATE LIMITED   Under PMA-11-04-2025 12:00:20Qualified
3NEW AGE INSUTRUMENTS AND MATERIALS PRIVATE LIMITED   Under PMA-14-04-2025 15:17:04Qualified

Financial Results

Rank Seller Price Item
L1INFRARED OPTICS PRIVATE LIMITED   Under PMA₹33,91,320Item Categories : Saturable absorber mirror 800nm, absorptance 1 percent,Saturable absorber mirror 800nm, absorptance
L2ADVANCED PHOTONICS   Under PMA₹35,64,860Item Categories : Saturable absorber mirror 800nm, absorptance 1 percent,Saturable absorber mirror 800nm, absorptance
L3NEW AGE INSUTRUMENTS AND MATERIALS PRIVATE LIMITED   Under PMA₹36,07,530Item Categories : Saturable absorber mirror 800nm, absorptance 1 percent,Saturable absorber mirror 800nm, absorptance

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about GUJARAT tender market

What are the eligibility requirements for this tender?

The eligibility requirements include being a registered entity, possessing relevant industry certifications, and having documented experience in the field of optical component manufacturing, specifically in saturable absorbers. Bidders must adhere to the quality standards established by the Department of Space to qualify for participation.

What technical specifications must be met for the saturable absorbers?

The technical specifications entail providing saturable absorber mirrors with specific absorptance levels at designated wavelengths, including 800nm, 1030nm, 1040nm, and 1064nm, among others. Bidders must supply comprehensive documentation showcasing performance metrics, testing procedures, and compliance with international standards relevant to optical components.

What are the payment terms and EMD details for the tender?

The payment terms include submitting an Earnest Money Deposit (EMD) along with financial documentation. The precise amount required for the EMD will be specified in the tender documents. Upon successful evaluation, a performance security guarantee must also be provided to secure compliance with contract terms.

How should bids be submitted and what formats are accepted?

Bids should be submitted electronically through the specified tender portal. Accepted document formats typically include PDF and other standard formats that comply with electronic submission protocols outlined in the tender documentation. Ensure all proposals are clearly formatted for easy review.

What benefits do MSEs and startups receive in this tender?

Micro, Small, and Medium Enterprises (MSEs) and startups can benefit from various provisions in this tender. These may include simplified eligibility requirements, evaluation points for products manufactured under Make in India initiatives, and greater chances of project engagement to promote local industry participation.