2574-5420-9997,L01402000041,278607989914,2060-4310-0102,2641-4370-0111,2702-5450-9950,2786-1599-990
Indian Army
Progress
Quantity
534
Category
3124111111
Bid Type
Two Packet Bid
The Indian Army, under the Department Of Military Affairs, seeks security equipment through a GEM tender with 19 BOQ items. The bid involves standard commercial terms including an option clause allowing quantity adjustments up to 25% of the bid quantity at contract placement and during the contract period. Delivery timelines are linked to the original delivery period, with a minimum additional time of 30 days if options are exercised. Financial and certification requirements are mandated, with GST handling described as per applicable rates and actuals. The contract emphasizes bidder financial health and non-liquidity, while ensuring adherence to delivery, performance, and compliance terms. The lack of explicit item specifications indicates a broad procurement scope, focusing on compliance and readiness to supply as demanded by the Army.
No explicit product specifications provided; 19 BOQ items listed as N/A
Option clause allows +/- 25% quantity change at contract and during currency
Delivery extension calculation: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
GST handling to be determined by bidder; reimbursement as actuals or applicable rate
Turnover requirement stated but exact value not disclosed in data
Mandatory certificates and documents required for bid submission
Option clause permits 25% quantity adjustment at contract time and during currency
GST payable/reimbursed as actuals or as per applicable rate; bidder bears tax considerations
Bidder must have solid financial standing and not be in liquidation; provide undertaking
Delivery period terms tied to original order date with formula-based extensions
Mandatory submission of prescribed certificates and financial/documents
Delivery period commences from the last date of original delivery order; extended duration calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Price adjustment or discounts may be offered at the buyer's discretion; detailed payment terms not specified in the excerpt.
Contract may be terminated for non-compliance, failure to deliver, insolvency, misrepresentation, or breach of material terms; LD details not specified in the provided data.
Not under liquidation or bankruptcy; provide an undertaking
Demonstrate minimum average turnover as per bid document
Provide all mandatory certificates and documents to participate
Compliance with GST requirements and submission of GST-related documentation
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
NEW DELHI, DELHI
Indian Army
Indian Army
JAMMU, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | 3124111111 | LV7/TMB 3124111111 Joint Piece | 26 | nos | dld.gem.proc | 30 |
| 2 | 2751-1540-0112 | LV7/TMB 2751-1540-0112 Brush Gear Assy | 21 | nos | dld.gem.proc | 30 |
| 3 | 012-760-0231J | LV7/TMB 012-760-0231J Door Lock (RH) W/O Locking | 25 | nos | dld.gem.proc | 30 |
| 4 | 2920-000139 | LV7/TMB 2920-000139 Solenoid Switch 12 Volt | 6 | nos | dld.gem.proc | 30 |
| 5 | 2636-1540-4906 | LV7/TMB 2636-1540-4906 Terminal Negative | 36 | nos | dld.gem.proc | 30 |
| 6 | 2786-1399-9916 | LV7/TMB 2786-1399-9916 Gasket Kit Cyl Head | 50 | nos | dld.gem.proc | 30 |
| 7 | 2786-1599-9933 | LV7/TMB 2786-1599-9933 Alternator (12V 55 AMP) | 7 | nos | dld.gem.proc | 30 |
| 8 | 269126105303 | LV7/TATA 269126105303 Gasket (Housing Front & Rear | 48 | nos | dld.gem.proc | 30 |
| 9 | 2573-5420-9918 | LV7/TMB 2573-5420-9918 Fuel Gauge (Pricol) | 35 | nos | dld.gem.proc | 30 |
| 10 | 2525-0312-0111 | LV7/TMB 2525-0312-0111 Connecting Rod Brg Set Std | 30 | nos | dld.gem.proc | 30 |
| 11 | 2786-1899-9906 | LV7/TMB 2786-1899-9906 Gasket Filter Head | 38 | nos | dld.gem.proc | 30 |
| 12 | 2786-0199-9973 | LV7/TMB 2786-0199-9973 Sealant Liquid Gasket | 65 | nos | dld.gem.proc | 30 |
| 13 | 2574-5442-0112 | LV7/TMB 2574-5442-0112 Tail Light (LH) 4 Chamber R | 25 | nos | dld.gem.proc | 30 |
| 14 | 3503-630-0131 | LV7/TATA 3503-630-0131 Double Face Sldge Hammer | 16 | nos | dld.gem.proc | 30 |
| 15 | 4710-000159 | LV7/TMB 4710-000159 Assy Fuel Line (Fuel Filter T | 33 | nos | dld.gem.proc | 30 |
| 16 | 2430-100-529 | LV7/TMB 2430-100-529 Shim 0.88MM THK | 2 | nos | dld.gem.proc | 30 |
| 17 | 000-9340-10000 | LV7/TMB 000-9340-10000 Nut Hex Brass M10 | 35 | nos | dld.gem.proc | 30 |
| 18 | 2574-8240-0106 | LV7/TMB 2574-8240-0106 Accessories Kit of 17W Wip | 14 | nos | dld.gem.proc | 30 |
| 19 | 2632-4370-0188 | LV7/TMB 2632-4370-0188 Graduated Hand Control Val | 22 | nos | dld.gem.proc | 30 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates
Financial statements (last 3 years)
EMD/Security deposit documents (if required per bid)
Technical bid documents
OEM authorizations (if applicable)
Certificates demonstrating compliance with bid terms
Undertakings for non-liquidity and financial standing
Key insights about DELHI tender market
Bidders must submit GST registration, PAN, experience certificates, and financial statements, along with technical bid documents. Ensure compliance with the option clause of 25% quantity, and provide necessary turnover evidence for the last three years. Delivery terms reference the original delivery period and formula-based extensions.
Required documents include GST certificate, PAN card, three-year financial statements, experience certificates for similar supplies, EMD documents if applicable, technical compliance certificates, OEM authorizations, and an undertaking regarding non-liquidity. All certificates must be uploaded in the bid submission.
Delivery extensions follow: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. If the original period is less than 30 days, the extension equals the original period. Extensions may stretch to the original delivery period under option exercise.
The purchaser may increase or decrease the quantity by up to 25% at contract placement and during the contract, with delivery timing adjusted accordingly. The calculation ensures a fair timeline, requiring bidders to maintain readiness for variable orders.
The tender data emphasizes certificates and compliance; exact standards are not listed. Bidders should prepare applicable certifications, verify ISI/ISO requirements in the bid document, and ensure presence of OEM authorizations where required.
Bidders must determine applicable GST and acknowledge that reimbursement is based on actuals or the rate in force, up to the quoted GST percentage. The Army clarifies no responsibility for GST computation; bidders must self-verify.
The buyer reserves the right to terminate the contract for failure to deliver, or for other material term breaches. The terms also cover potential remedies for late delivery or replacement of defective materials per contract stipulations.
Submit three-year financial statements and an undertaking confirming no liquidation or bankruptcy. The bid requires evidence of financial stability to support performance and delivery commitments, alongside turnover as stipulated in the bid document.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS