TenderDekho Logo
Closed GEM

Open Tender for Supply of Stone Pad,Supply of AL LUG Long Barrel Off Size,Supply of Holding Clamp,Supply of M s Top in HATHRAS, UTTAR PRADESH

Bid Publish Date

10-Aug-2026, 4:46 pm

Bid End Date

27-Aug-2026, 2:00 pm

EMD

₹1,30,640

Value

₹1,30,64,000

Generate Docs

Progress

Issue10-Aug-2026, 4:46 pm
Corrigendum12-Aug-2026
AwardPending

A tender has been published for Uttar Pradesh Power Corporation Limited (uppcl) Supply of Stone Pad, Supply of AL LUG Long Barrel Off Size, Supply of Holding Clamp, Supply of M s Top Channel 125x65x2240 mm, Supply of MS Dropper Channel 100x50x2028 mm, Supply of Number Plate, Supply of MS Angle T F base With Clamp and nut bolt, Supply of Barbed Wire, Supply of Danger Board, Supply of Copper L Piece, Supply of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V, Supply of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box, Supply of Insulated Weasel Conductor, Supply of M s Nut and Bolt, Supply of Suspension Clamp, Supply of Dead End Clamp, Supply of I Hook J Hook, Carriage of Pcc Pole 8 5 Mtr Long, Carriage of Pcc Pole 11 Mtr Long, Carriage of 11 KV Pin Insulator With Pin, Carriage of 11 KV Disc Insulator With Fitting, Carriage of Fuse Set, Carriage of Earthing Complete, Carriage of Stay set Complete, Carriage of 25 KVA 11 0 4 KV T F, Carriage of 250 KVA 11 0 4 KV T F, Carriage of LT XLPE PVC Cable 3 5x70 Sqmm, Carriage of LT XLPE PVC Cable 1x400 Sqmm, Carriage of LT XLPE PVC Cable 1x240 Sqmm, Carriage of LT ABC Cable 3x120plus1x95plus1x16 sqmm, Carriage of 11 KV TPMO with Polymer Insualator, Errection of Pcc Pole 8 5 Mtr Long, Errection of Pcc Pole 11 Mtr Long, Fixing of Stone Pad, Fixing of AL LUG Long Barrel Off Size, Fixing of Holding Clamp, Fixing of M s Top Channel 125x65x2240 mm, Fixing of MS Dropper Channel 100x50x2028 mm, Fixingof Number Plate, Fixing of MS Angle T F base With Clamp and nut bolt, Fixing of Barbed Wire, Fixing of Danger Board, Fixing of Copper L Piece, Fixing of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V, Fixing of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box, Fixing of M s Nut and Bolt, Fixing of 11 KV Pin Insulator With Pin, Fixing of 11 KV Disc Insulator With Fitting, Fixing of Fuse Set, Fixing of 11 KV TPMO with Polymer Insualator, Fixing of Suspension Clamp, Errection of Dead End Clamp, Fixing of I Hook J Hook, Installation of 25 KVA 11 0 4 KV T F on newly constructed double pole in proper alignment, Installation of 250 KVA T F on newly Old constructed Plinth in proper alignment, Dismenteling of 10 16 KVA T F, Dismenteling of 100 KVA T F, Errection and grouting of stays, Fixing of earthing rod, Laying LT XLPE PVC Cable 3 5x70 Sqmm, Laying LT XLPE PVC Cable 1x400 Sqmm, Laying LT XLPE PVC Cable 1x240 Sqmm, Laying LT ABC Cable 3x120 plus 1x95 plus 1x16 sqmm, Laying Insulated Weasel Conductor, Construction of plinth of size 2x2x1 point 5 M, Pipe and Water Level earthing of 250 KVA medium Power Transformers, Net Fencing Shall be 1150x1200 mm made of 35x35 mm MS Angle, Back Cartage of 10 16 KVA T F, Back Cartage of 100 KVA T F in HATHRAS, UTTAR PRADESH. Quantity: 10602 by. Submission Deadline: 27-08-2026 14: 00: 00. Check eligibility and apply.

Authority & Contact

Tender Data

Bid Details

Quantity

10602

Category

Installation of 250 KVA T F on newly Old constructed Plinth in proper alignment

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

65

OEM Avg. Turnover

65

Past Performance

50 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Supply of Stone Pad , Supply of AL LUG Long Barrel Off Size , Supply of Holding Clamp , Supply of M s Top Channel 125x65x2240 mm , Supply of MS Dropper Channel 100x50x2028 mm , Supply of Number Plate , Supply of MS Angle T F base With Clamp and nut bolt , Supply of Barbed Wire , Supply of Danger Board , Supply of Copper L Piece , Supply of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V , Supply of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box , Supply of Insulated Weasel Conductor , Supply of M s Nut and Bolt , Supply of Suspension Clamp , Supply of Dead End Clamp , Supply of I Hook J Hook , Carriage of Pcc Pole 8 5 Mtr Long , Carriage of Pcc Pole 11 Mtr Long , Carriage of 11 KV Pin Insulator With Pin , Carriage of 11 KV Disc Insulator With Fitting , Carriage of Fuse Set , Carriage of Earthing Complete , Carriage of Stay set Complete , Carriage of 25 KVA 11 0 4 KV T F , Carriage of 250 KVA 11 0 4 KV T F , Carriage of LT XLPE PVC Cable 3 5x70 Sqmm , Carriage of LT XLPE PVC Cable 1x400 Sqmm , Carriage of LT XLPE PVC Cable 1x240 Sqmm , Carriage of LT ABC Cable 3x120plus1x95plus1x16 sqmm , Carriage of 11 KV TPMO with Polymer Insualator , Errection of Pcc Pole 8 5 Mtr Long , Errection of Pcc Pole 11 Mtr Long , Fixing of Stone Pad , Fixing of AL LUG Long Barrel Off Size , Fixing of Holding Clamp , Fixing of M s Top Channel 125x65x2240 mm , Fixing of MS Dropper Channel 100x50x2028 mm , Fixingof Number Plate , Fixing of MS Angle T F base With Clamp and nut bolt , Fixing of Barbed Wire , Fixing of Danger Board , Fixing of Copper L Piece , Fixing of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V , Fixing of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box , Fixing of M s Nut and Bolt , Fixing of 11 KV Pin Insulator With Pin , Fixing of 11 KV Disc Insulator With Fitting , Fixing of Fuse Set , Fixing of 11 KV TPMO with Polymer Insualator , Fixing of Suspension Clamp , Errection of Dead End Clamp , Fixing of I Hook J Hook , Installation of 25 KVA 11 0 4 KV T F on newly constructed double pole in proper alignment , Installation of 250 KVA T F on newly Old constructed Plinth in proper alignment , Dismenteling of 10 16 KVA T F , Dismenteling of 100 KVA T F , Errection and grouting of stays , Fixing of earthing rod , Laying LT XLPE PVC Cable 3 5x70 Sqmm , Laying LT XLPE PVC Cable 1x400 Sqmm , Laying LT XLPE PVC Cable 1x240 Sqmm , Laying LT ABC Cable 3x120 plus 1x95 plus 1x16 sqmm , Laying Insulated Weasel Conductor , Construction of plinth of size 2x2x1 point 5 M , Pipe and Water Level earthing of 250 KVA medium Power Transformers , Net Fencing Shall be 1150x1200 mm made of 35x35 mm MS Angle , Back Cartage of 10 16 KVA T F , Back Cartage of 100 KVA T F

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

12

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Hathras

Delivery Pincodes

204101

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Anurag Singh204101,132 KV S/S Ohpura Mathura Road HathrasHathrasUttar Pradesh20410124180-

Authority Records

ENERGY DEPARTMENTUTTAR PRADESH POWER CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9722790.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 69 Items Sign in for GEM prices

#1

Supply of Stone Pad

Supply of Stone Pad as per relevent ISS

24 no Delivery: 180 days
#2

Supply of AL LUG Long Barrel Off Size

Supply of AL LUG Long Barrel Off Size as per relevent ISS

792 no Delivery: 180 days
#3

Supply of Holding Clamp

Supply of Holding Clamp as per relevent ISS

143 no Delivery: 180 days
#4

Supply of M s Top Channel 125x65x2240 mm

Supply of M s Top Channel 125x65x2240 mm as per relevent ISS

14 no Delivery: 180 days
#5

Supply of MS Dropper Channel 100x50x2028 mm

Supply of MS Dropper Channel 100x50x2028 mm as per relevent ISS

30 no Delivery: 180 days
#6

Supply of Number Plate

Supply of Number Plate as per relevent ISS

1 no Delivery: 180 days
#7

Supply of MS Angle T F base With Clamp and nut bolt

Supply of MS Angle T F base With Clamp and nut bolt as per relevent ISS

26 no Delivery: 180 days
#8

Supply of Barbed Wire

Supply of Barbed Wire as per relevent ISS

56 kg Delivery: 180 days
#9

Supply of Danger Board

Supply of Danger Board as per relevent ISS

14 no Delivery: 180 days
#10

Supply of Copper L Piece

Supply of Copper L Piece as per relevent ISS

216 no Delivery: 180 days
#11

Supply of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V

Supply of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V as per relevent ISS

44 no Delivery: 180 days
#12

Supply of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box

Supply of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box

13 no Delivery: 180 days
#13

Supply of Insulated Weasel Conductor

Supply of Insulated Weasel Conductor as per relevent ISS

420 mtr Delivery: 180 days
#14

Supply of M s Nut and Bolt

Supply of M s Nut and Bolt as per relevent ISS

56 kg Delivery: 180 days
#15

Supply of Suspension Clamp

Supply of Suspension Clamp as per relevent ISS

6 no Delivery: 180 days
#16

Supply of Dead End Clamp

Supply of Dead End Clamp as per relevent ISS

2 no Delivery: 180 days
#17

Supply of I Hook J Hook

Supply of I Hook J Hook as per relevent ISS

8 no Delivery: 180 days
#18

Carriage of Pcc Pole 8 5 Mtr Long

Carriage of Pcc Pole 8 5 Mtr Long from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )

16 no Delivery: 180 days
#19

Carriage of Pcc Pole 11 Mtr Long

Carriage of Pcc Pole 11 Mtr Long from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )

12 no Delivery: 180 days
#20

Carriage of 11 KV Pin Insulator With Pin

Carriage of 11 KV Pin Insulator With Pin

42 no Delivery: 180 days
#21

Carriage of 11 KV Disc Insulator With Fitting

Carriage of 11 KV Disc Insulator With Fitting

21 no Delivery: 180 days
#22

Carriage of Fuse Set

Carriage of Fuse Set

14 no Delivery: 180 days
#23

Carriage of Earthing Complete

Carriage of Earthing Complete

28 no Delivery: 180 days
#24

Carriage of Stay set Complete

Carriage of Stay set Complete

28 no Delivery: 180 days
#25

Carriage of 25 KVA 11 0 4 KV T F

Carriage of 25 KVA 11 0 4 KV T F from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )

13 no Delivery: 180 days
#26

Carriage of 250 KVA 11 0 4 KV T F

Carriage of 250 KVA 11 0 4 KV T F from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )

44 no Delivery: 180 days
#27

Carriage of LT XLPE PVC Cable 3 5x70 Sqmm

Carriage of LT XLPE PVC Cable 3 5x70 Sqmm from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )

260 mtr Delivery: 180 days
#28

Carriage of LT XLPE PVC Cable 1x400 Sqmm

Carriage of LT XLPE PVC Cable 1x400 Sqmm from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )

2,240 mtr Delivery: 180 days
#29

Carriage of LT XLPE PVC Cable 1x240 Sqmm

Carriage of LT XLPE PVC Cable 1x240 Sqmm from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )

500 mtr Delivery: 180 days
#30

Carriage of LT ABC Cable 3x120plus1x95plus1x16 sqmm

Carriage of LT ABC Cable 3x120+1x95+1x16 sqmm from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )

60 mtr Delivery: 180 days
#31

Carriage of 11 KV TPMO with Polymer Insualator

Carriage of 11 KV TPMO with Polymer Insualator

14 no Delivery: 180 days
#32

Errection of Pcc Pole 8 5 Mtr Long

Errection of Pcc Pole 8 5 Mtr Long with grouting including Cutting of kharanja mettalic road concrete portion while digging pit & complete H T L T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour T&P and carrier etc required for proper completion of work

16 no Delivery: 180 days
#33

Errection of Pcc Pole 11 Mtr Long

Errection of Pcc Pole 11 Mtr Long with grouting including Cutting of kharanja mettalic road concrete portion while digging pit & complete H T L T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour T&P and carrier etc required for proper completion of work

12 no Delivery: 180 days
#34

Fixing of Stone Pad

Fixing of Stone Pad

24 no Delivery: 180 days
#35

Fixing of AL LUG Long Barrel Off Size

Fixing of AL LUG Long Barrel Off Size

792 no Delivery: 180 days
#36

Fixing of Holding Clamp

Fixing of Holding Clamp

143 no Delivery: 180 days
#37

Fixing of M s Top Channel 125x65x2240 mm

Fixing of M s Top Channel 125x65x2240 mm

14 no Delivery: 180 days
#38

Fixing of MS Dropper Channel 100x50x2028 mm

Fixing of MS Dropper Channel 100x50x2028 mm

30 no Delivery: 180 days
#39

Fixingof Number Plate

Fixingof Number Plate

1 no Delivery: 180 days
#40

Fixing of MS Angle T F base With Clamp and nut bolt

Fixing of MS Angle T F base With Clamp and nut bolt

26 no Delivery: 180 days
#41

Fixing of Barbed Wire

Fixing of Barbed Wire

56 kg Delivery: 180 days
#42

Fixing of Danger Board

Fixing of Danger Board

14 no Delivery: 180 days
#43

Fixing of Copper L Piece

Fixing of Copper L Piece

216 no Delivery: 180 days
#44

Fixing of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V

Fixing of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V

44 no Delivery: 180 days
#45

Fixing of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box

Fixing of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box

13 no Delivery: 180 days
#46

Fixing of M s Nut and Bolt

Fixing of M s Nut & Bolt

56 kg Delivery: 180 days
#47

Fixing of 11 KV Pin Insulator With Pin

Fixing of 11 KV Pin Insulator With Pin

42 no Delivery: 180 days
#48

Fixing of 11 KV Disc Insulator With Fitting

Fixing of 11 KV Disc Insulator With Fitting

21 no Delivery: 180 days
#49

Fixing of Fuse Set

Fixing of Fuse Set

14 no Delivery: 180 days
#50

Fixing of 11 KV TPMO with Polymer Insualator

Fixing of 11 KV TPMO with Polymer Insualator

14 no Delivery: 180 days
#51

Fixing of Suspension Clamp

Fixing of Suspension Clamp

6 no Delivery: 180 days
#52

Errection of Dead End Clamp

Errection of Dead End Clamp

2 no Delivery: 180 days
#53

Fixing of I Hook J Hook

Fixing of I Hook J Hook

8 no Delivery: 180 days
#54

Installation of 25 KVA 11 0 4 KV T F on newly constructed double pole in proper alignment

Installation of 25 KVA 11 0 4 KV T F on newly constructed double pole in proper alignment direction & making HT LT connection

13 no Delivery: 180 days
#55

Installation of 250 KVA T F on newly Old constructed Plinth in proper alignment

Installation of 250 KVA T F on newly Old constructed Plinth in proper alignment direction & making HT LT connection all Cost of labour and T&P which required for completion of work

44 no Delivery: 180 days
#56

Dismenteling of 10 16 KVA T F

Dismenteling of 10 16 KVA T F from Double Pole with opening of all HT LT Jumpers all works which required for dismentling of T F

13 no Delivery: 180 days
#57

Dismenteling of 100 KVA T F

Dismenteling of 100 KVA T F from Double Pole with opening of all HT LT Jumpers all works which required for dismentling of T F

43 no Delivery: 180 days
#58

Errection and grouting of stays

Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer Grouting material i e cement sand brick ballast stone ballast etc shall be arranged by the contractor at his own cost

28 no Delivery: 180 days
#59

Fixing of earthing rod

Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer

28 no Delivery: 180 days
#60

Laying LT XLPE PVC Cable 3 5x70 Sqmm

Laying LT XLPE PVC Cable 3 5x70 Sqmm

260 mtr Delivery: 180 days
#61

Laying LT XLPE PVC Cable 1x400 Sqmm

Laying LT XLPE PVC Cable 1x400 Sqmm

2,240 mtr Delivery: 180 days
#62

Laying LT XLPE PVC Cable 1x240 Sqmm

Laying LT XLPE PVC Cable 1x240 Sqmm

500 mtr Delivery: 180 days
#63

Laying LT ABC Cable 3x120 plus 1x95 plus 1x16 sqmm

Laying LT ABC Cable 3x120 plus 1x95 plus 1x16 sqmm

60 mtr Delivery: 180 days
#64

Laying Insulated Weasel Conductor

Laying Insulated Weasel Conductor

420 mtr Delivery: 180 days
#65

Construction of plinth of size 2x2x1 point 5 M

Construction of plinth of size 2x2x1 5 M above ground level one ft below the ground level of 9 inch After Exavation of 4 inch earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9 inchwidth by fist class brick in ratio 1 ratio 4 of cement & sand shall be made The earth shall be filled up to one ft below the top of the plinth After this brick ballast shall be provided upto 6 inch from the earth level and proper rammering shall be done one No jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth The 12 mm thick plastering shall be done all round the plinth in 1 4 ratio of cement and sand

44 job Delivery: 180 days
#66

Pipe and Water Level earthing of 250 KVA medium Power Transformers

Pipe & Water Level earthing of 250 KVA medium Power Transformers

88 job Delivery: 180 days
#67

Net Fencing Shall be 1150x1200 mm made of 35x35 mm MS Angle

Net Fencing Shall be 1150x1200 mm made of 35x35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt and nut

44 job Delivery: 180 days
#68

Back Cartage of 10 16 KVA T F

Back Cartage of 10 16 KVA T F and carriage it up to Store Hathras J E Store all cost of labour and T and P which required for completion of work

13 no Delivery: 180 days
#69

Back Cartage of 100 KVA T F

Back Cartage of 100 KVA T F and carriage it up to Store Hathras J E Store all cost of labour and T&P which required for completion of work

43 no Delivery: 180 days

Categories 65

Corrigendum Updates

1 Update
#1

Update

12-Aug-2026

Extended Deadline

27-Aug-2026, 8:30 am

Opening Date

27-Aug-2026, 9:00 am

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer