Bid Publish Date
10-Aug-2026, 4:46 pm
Bid End Date
27-Aug-2026, 2:00 pm
EMD
₹1,30,640
Value
₹1,30,64,000
Location
Progress
A tender has been published for Uttar Pradesh Power Corporation Limited (uppcl) Supply of Stone Pad, Supply of AL LUG Long Barrel Off Size, Supply of Holding Clamp, Supply of M s Top Channel 125x65x2240 mm, Supply of MS Dropper Channel 100x50x2028 mm, Supply of Number Plate, Supply of MS Angle T F base With Clamp and nut bolt, Supply of Barbed Wire, Supply of Danger Board, Supply of Copper L Piece, Supply of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V, Supply of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box, Supply of Insulated Weasel Conductor, Supply of M s Nut and Bolt, Supply of Suspension Clamp, Supply of Dead End Clamp, Supply of I Hook J Hook, Carriage of Pcc Pole 8 5 Mtr Long, Carriage of Pcc Pole 11 Mtr Long, Carriage of 11 KV Pin Insulator With Pin, Carriage of 11 KV Disc Insulator With Fitting, Carriage of Fuse Set, Carriage of Earthing Complete, Carriage of Stay set Complete, Carriage of 25 KVA 11 0 4 KV T F, Carriage of 250 KVA 11 0 4 KV T F, Carriage of LT XLPE PVC Cable 3 5x70 Sqmm, Carriage of LT XLPE PVC Cable 1x400 Sqmm, Carriage of LT XLPE PVC Cable 1x240 Sqmm, Carriage of LT ABC Cable 3x120plus1x95plus1x16 sqmm, Carriage of 11 KV TPMO with Polymer Insualator, Errection of Pcc Pole 8 5 Mtr Long, Errection of Pcc Pole 11 Mtr Long, Fixing of Stone Pad, Fixing of AL LUG Long Barrel Off Size, Fixing of Holding Clamp, Fixing of M s Top Channel 125x65x2240 mm, Fixing of MS Dropper Channel 100x50x2028 mm, Fixingof Number Plate, Fixing of MS Angle T F base With Clamp and nut bolt, Fixing of Barbed Wire, Fixing of Danger Board, Fixing of Copper L Piece, Fixing of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V, Fixing of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box, Fixing of M s Nut and Bolt, Fixing of 11 KV Pin Insulator With Pin, Fixing of 11 KV Disc Insulator With Fitting, Fixing of Fuse Set, Fixing of 11 KV TPMO with Polymer Insualator, Fixing of Suspension Clamp, Errection of Dead End Clamp, Fixing of I Hook J Hook, Installation of 25 KVA 11 0 4 KV T F on newly constructed double pole in proper alignment, Installation of 250 KVA T F on newly Old constructed Plinth in proper alignment, Dismenteling of 10 16 KVA T F, Dismenteling of 100 KVA T F, Errection and grouting of stays, Fixing of earthing rod, Laying LT XLPE PVC Cable 3 5x70 Sqmm, Laying LT XLPE PVC Cable 1x400 Sqmm, Laying LT XLPE PVC Cable 1x240 Sqmm, Laying LT ABC Cable 3x120 plus 1x95 plus 1x16 sqmm, Laying Insulated Weasel Conductor, Construction of plinth of size 2x2x1 point 5 M, Pipe and Water Level earthing of 250 KVA medium Power Transformers, Net Fencing Shall be 1150x1200 mm made of 35x35 mm MS Angle, Back Cartage of 10 16 KVA T F, Back Cartage of 100 KVA T F in HATHRAS, UTTAR PRADESH. Quantity: 10602 by. Submission Deadline: 27-08-2026 14: 00: 00. Check eligibility and apply.
Quantity
10602
Category
Installation of 250 KVA T F on newly Old constructed Plinth in proper alignment
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
65
OEM Avg. Turnover
65
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Supply of Stone Pad , Supply of AL LUG Long Barrel Off Size , Supply of Holding Clamp , Supply of M s Top Channel 125x65x2240 mm , Supply of MS Dropper Channel 100x50x2028 mm , Supply of Number Plate , Supply of MS Angle T F base With Clamp and nut bolt , Supply of Barbed Wire , Supply of Danger Board , Supply of Copper L Piece , Supply of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V , Supply of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box , Supply of Insulated Weasel Conductor , Supply of M s Nut and Bolt , Supply of Suspension Clamp , Supply of Dead End Clamp , Supply of I Hook J Hook , Carriage of Pcc Pole 8 5 Mtr Long , Carriage of Pcc Pole 11 Mtr Long , Carriage of 11 KV Pin Insulator With Pin , Carriage of 11 KV Disc Insulator With Fitting , Carriage of Fuse Set , Carriage of Earthing Complete , Carriage of Stay set Complete , Carriage of 25 KVA 11 0 4 KV T F , Carriage of 250 KVA 11 0 4 KV T F , Carriage of LT XLPE PVC Cable 3 5x70 Sqmm , Carriage of LT XLPE PVC Cable 1x400 Sqmm , Carriage of LT XLPE PVC Cable 1x240 Sqmm , Carriage of LT ABC Cable 3x120plus1x95plus1x16 sqmm , Carriage of 11 KV TPMO with Polymer Insualator , Errection of Pcc Pole 8 5 Mtr Long , Errection of Pcc Pole 11 Mtr Long , Fixing of Stone Pad , Fixing of AL LUG Long Barrel Off Size , Fixing of Holding Clamp , Fixing of M s Top Channel 125x65x2240 mm , Fixing of MS Dropper Channel 100x50x2028 mm , Fixingof Number Plate , Fixing of MS Angle T F base With Clamp and nut bolt , Fixing of Barbed Wire , Fixing of Danger Board , Fixing of Copper L Piece , Fixing of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V , Fixing of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box , Fixing of M s Nut and Bolt , Fixing of 11 KV Pin Insulator With Pin , Fixing of 11 KV Disc Insulator With Fitting , Fixing of Fuse Set , Fixing of 11 KV TPMO with Polymer Insualator , Fixing of Suspension Clamp , Errection of Dead End Clamp , Fixing of I Hook J Hook , Installation of 25 KVA 11 0 4 KV T F on newly constructed double pole in proper alignment , Installation of 250 KVA T F on newly Old constructed Plinth in proper alignment , Dismenteling of 10 16 KVA T F , Dismenteling of 100 KVA T F , Errection and grouting of stays , Fixing of earthing rod , Laying LT XLPE PVC Cable 3 5x70 Sqmm , Laying LT XLPE PVC Cable 1x400 Sqmm , Laying LT XLPE PVC Cable 1x240 Sqmm , Laying LT ABC Cable 3x120 plus 1x95 plus 1x16 sqmm , Laying Insulated Weasel Conductor , Construction of plinth of size 2x2x1 point 5 M , Pipe and Water Level earthing of 250 KVA medium Power Transformers , Net Fencing Shall be 1150x1200 mm made of 35x35 mm MS Angle , Back Cartage of 10 16 KVA T F , Back Cartage of 100 KVA T F
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
12
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Hathras
Delivery Pincodes
204101
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Anurag Singh | 204101,132 KV S/S Ohpura Mathura Road Hathras | Hathras | Uttar Pradesh | 204101 | 24 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Supply of Stone Pad
Supply of Stone Pad as per relevent ISS
Supply of AL LUG Long Barrel Off Size
Supply of AL LUG Long Barrel Off Size as per relevent ISS
Supply of Holding Clamp
Supply of Holding Clamp as per relevent ISS
Supply of M s Top Channel 125x65x2240 mm
Supply of M s Top Channel 125x65x2240 mm as per relevent ISS
Supply of MS Dropper Channel 100x50x2028 mm
Supply of MS Dropper Channel 100x50x2028 mm as per relevent ISS
Supply of Number Plate
Supply of Number Plate as per relevent ISS
Supply of MS Angle T F base With Clamp and nut bolt
Supply of MS Angle T F base With Clamp and nut bolt as per relevent ISS
Supply of Barbed Wire
Supply of Barbed Wire as per relevent ISS
Supply of Danger Board
Supply of Danger Board as per relevent ISS
Supply of Copper L Piece
Supply of Copper L Piece as per relevent ISS
Supply of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V
Supply of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V as per relevent ISS
Supply of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box
Supply of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box
Supply of Insulated Weasel Conductor
Supply of Insulated Weasel Conductor as per relevent ISS
Supply of M s Nut and Bolt
Supply of M s Nut and Bolt as per relevent ISS
Supply of Suspension Clamp
Supply of Suspension Clamp as per relevent ISS
Supply of Dead End Clamp
Supply of Dead End Clamp as per relevent ISS
Supply of I Hook J Hook
Supply of I Hook J Hook as per relevent ISS
Carriage of Pcc Pole 8 5 Mtr Long
Carriage of Pcc Pole 8 5 Mtr Long from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )
Carriage of Pcc Pole 11 Mtr Long
Carriage of Pcc Pole 11 Mtr Long from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )
Carriage of 11 KV Pin Insulator With Pin
Carriage of 11 KV Pin Insulator With Pin
Carriage of 11 KV Disc Insulator With Fitting
Carriage of 11 KV Disc Insulator With Fitting
Carriage of Fuse Set
Carriage of Fuse Set
Carriage of Earthing Complete
Carriage of Earthing Complete
Carriage of Stay set Complete
Carriage of Stay set Complete
Carriage of 25 KVA 11 0 4 KV T F
Carriage of 25 KVA 11 0 4 KV T F from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )
Carriage of 250 KVA 11 0 4 KV T F
Carriage of 250 KVA 11 0 4 KV T F from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )
Carriage of LT XLPE PVC Cable 3 5x70 Sqmm
Carriage of LT XLPE PVC Cable 3 5x70 Sqmm from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )
Carriage of LT XLPE PVC Cable 1x400 Sqmm
Carriage of LT XLPE PVC Cable 1x400 Sqmm from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )
Carriage of LT XLPE PVC Cable 1x240 Sqmm
Carriage of LT XLPE PVC Cable 1x240 Sqmm from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )
Carriage of LT ABC Cable 3x120plus1x95plus1x16 sqmm
Carriage of LT ABC Cable 3x120+1x95+1x16 sqmm from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms )
Carriage of 11 KV TPMO with Polymer Insualator
Carriage of 11 KV TPMO with Polymer Insualator
Errection of Pcc Pole 8 5 Mtr Long
Errection of Pcc Pole 8 5 Mtr Long with grouting including Cutting of kharanja mettalic road concrete portion while digging pit & complete H T L T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour T&P and carrier etc required for proper completion of work
Errection of Pcc Pole 11 Mtr Long
Errection of Pcc Pole 11 Mtr Long with grouting including Cutting of kharanja mettalic road concrete portion while digging pit & complete H T L T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour T&P and carrier etc required for proper completion of work
Fixing of Stone Pad
Fixing of Stone Pad
Fixing of AL LUG Long Barrel Off Size
Fixing of AL LUG Long Barrel Off Size
Fixing of Holding Clamp
Fixing of Holding Clamp
Fixing of M s Top Channel 125x65x2240 mm
Fixing of M s Top Channel 125x65x2240 mm
Fixing of MS Dropper Channel 100x50x2028 mm
Fixing of MS Dropper Channel 100x50x2028 mm
Fixingof Number Plate
Fixingof Number Plate
Fixing of MS Angle T F base With Clamp and nut bolt
Fixing of MS Angle T F base With Clamp and nut bolt
Fixing of Barbed Wire
Fixing of Barbed Wire
Fixing of Danger Board
Fixing of Danger Board
Fixing of Copper L Piece
Fixing of Copper L Piece
Fixing of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V
Fixing of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V
Fixing of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box
Fixing of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box
Fixing of M s Nut and Bolt
Fixing of M s Nut & Bolt
Fixing of 11 KV Pin Insulator With Pin
Fixing of 11 KV Pin Insulator With Pin
Fixing of 11 KV Disc Insulator With Fitting
Fixing of 11 KV Disc Insulator With Fitting
Fixing of Fuse Set
Fixing of Fuse Set
Fixing of 11 KV TPMO with Polymer Insualator
Fixing of 11 KV TPMO with Polymer Insualator
Fixing of Suspension Clamp
Fixing of Suspension Clamp
Errection of Dead End Clamp
Errection of Dead End Clamp
Fixing of I Hook J Hook
Fixing of I Hook J Hook
Installation of 25 KVA 11 0 4 KV T F on newly constructed double pole in proper alignment
Installation of 25 KVA 11 0 4 KV T F on newly constructed double pole in proper alignment direction & making HT LT connection
Installation of 250 KVA T F on newly Old constructed Plinth in proper alignment
Installation of 250 KVA T F on newly Old constructed Plinth in proper alignment direction & making HT LT connection all Cost of labour and T&P which required for completion of work
Dismenteling of 10 16 KVA T F
Dismenteling of 10 16 KVA T F from Double Pole with opening of all HT LT Jumpers all works which required for dismentling of T F
Dismenteling of 100 KVA T F
Dismenteling of 100 KVA T F from Double Pole with opening of all HT LT Jumpers all works which required for dismentling of T F
Errection and grouting of stays
Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer Grouting material i e cement sand brick ballast stone ballast etc shall be arranged by the contractor at his own cost
Fixing of earthing rod
Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer
Laying LT XLPE PVC Cable 3 5x70 Sqmm
Laying LT XLPE PVC Cable 3 5x70 Sqmm
Laying LT XLPE PVC Cable 1x400 Sqmm
Laying LT XLPE PVC Cable 1x400 Sqmm
Laying LT XLPE PVC Cable 1x240 Sqmm
Laying LT XLPE PVC Cable 1x240 Sqmm
Laying LT ABC Cable 3x120 plus 1x95 plus 1x16 sqmm
Laying LT ABC Cable 3x120 plus 1x95 plus 1x16 sqmm
Laying Insulated Weasel Conductor
Laying Insulated Weasel Conductor
Construction of plinth of size 2x2x1 point 5 M
Construction of plinth of size 2x2x1 5 M above ground level one ft below the ground level of 9 inch After Exavation of 4 inch earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9 inchwidth by fist class brick in ratio 1 ratio 4 of cement & sand shall be made The earth shall be filled up to one ft below the top of the plinth After this brick ballast shall be provided upto 6 inch from the earth level and proper rammering shall be done one No jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth The 12 mm thick plastering shall be done all round the plinth in 1 4 ratio of cement and sand
Pipe and Water Level earthing of 250 KVA medium Power Transformers
Pipe & Water Level earthing of 250 KVA medium Power Transformers
Net Fencing Shall be 1150x1200 mm made of 35x35 mm MS Angle
Net Fencing Shall be 1150x1200 mm made of 35x35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt and nut
Back Cartage of 10 16 KVA T F
Back Cartage of 10 16 KVA T F and carriage it up to Store Hathras J E Store all cost of labour and T and P which required for completion of work
Back Cartage of 100 KVA T F
Back Cartage of 100 KVA T F and carriage it up to Store Hathras J E Store all cost of labour and T&P which required for completion of work
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Supply of Stone Pad | Supply of Stone Pad as per relevent ISS | 24 | no | con1edchathras | 180 | |
| 2 | Supply of AL LUG Long Barrel Off Size | Supply of AL LUG Long Barrel Off Size as per relevent ISS | 792 | no | con1edchathras | 180 | |
| 3 | Supply of Holding Clamp | Supply of Holding Clamp as per relevent ISS | 143 | no | con1edchathras | 180 | |
| 4 | Supply of M s Top Channel 125x65x2240 mm | Supply of M s Top Channel 125x65x2240 mm as per relevent ISS | 14 | no | con1edchathras | 180 | |
| 5 | Supply of MS Dropper Channel 100x50x2028 mm | Supply of MS Dropper Channel 100x50x2028 mm as per relevent ISS | 30 | no | con1edchathras | 180 | |
| 6 | Supply of Number Plate | Supply of Number Plate as per relevent ISS | 1 | no | con1edchathras | 180 | |
| 7 | Supply of MS Angle T F base With Clamp and nut bolt | Supply of MS Angle T F base With Clamp and nut bolt as per relevent ISS | 26 | no | con1edchathras | 180 | |
| 8 | Supply of Barbed Wire | Supply of Barbed Wire as per relevent ISS | 56 | kg | con1edchathras | 180 | |
| 9 | Supply of Danger Board | Supply of Danger Board as per relevent ISS | 14 | no | con1edchathras | 180 | |
| 10 | Supply of Copper L Piece | Supply of Copper L Piece as per relevent ISS | 216 | no | con1edchathras | 180 | |
| 11 | Supply of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V | Supply of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V as per relevent ISS | 44 | no | con1edchathras | 180 | |
| 12 | Supply of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box | Supply of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box | 13 | no | con1edchathras | 180 | |
| 13 | Supply of Insulated Weasel Conductor | Supply of Insulated Weasel Conductor as per relevent ISS | 420 | mtr | con1edchathras | 180 | |
| 14 | Supply of M s Nut and Bolt | Supply of M s Nut and Bolt as per relevent ISS | 56 | kg | con1edchathras | 180 | |
| 15 | Supply of Suspension Clamp | Supply of Suspension Clamp as per relevent ISS | 6 | no | con1edchathras | 180 | |
| 16 | Supply of Dead End Clamp | Supply of Dead End Clamp as per relevent ISS | 2 | no | con1edchathras | 180 | |
| 17 | Supply of I Hook J Hook | Supply of I Hook J Hook as per relevent ISS | 8 | no | con1edchathras | 180 | |
| 18 | Carriage of Pcc Pole 8 5 Mtr Long | Carriage of Pcc Pole 8 5 Mtr Long from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms ) | 16 | no | con1edchathras | 180 | |
| 19 | Carriage of Pcc Pole 11 Mtr Long | Carriage of Pcc Pole 11 Mtr Long from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms ) | 12 | no | con1edchathras | 180 | |
| 20 | Carriage of 11 KV Pin Insulator With Pin | Carriage of 11 KV Pin Insulator With Pin | 42 | no | con1edchathras | 180 | |
| 21 | Carriage of 11 KV Disc Insulator With Fitting | Carriage of 11 KV Disc Insulator With Fitting | 21 | no | con1edchathras | 180 | |
| 22 | Carriage of Fuse Set | Carriage of Fuse Set | 14 | no | con1edchathras | 180 | |
| 23 | Carriage of Earthing Complete | Carriage of Earthing Complete | 28 | no | con1edchathras | 180 | |
| 24 | Carriage of Stay set Complete | Carriage of Stay set Complete | 28 | no | con1edchathras | 180 | |
| 25 | Carriage of 25 KVA 11 0 4 KV T F | Carriage of 25 KVA 11 0 4 KV T F from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms ) | 13 | no | con1edchathras | 180 | |
| 26 | Carriage of 250 KVA 11 0 4 KV T F | Carriage of 250 KVA 11 0 4 KV T F from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms ) | 44 | no | con1edchathras | 180 | |
| 27 | Carriage of LT XLPE PVC Cable 3 5x70 Sqmm | Carriage of LT XLPE PVC Cable 3 5x70 Sqmm from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms ) | 260 | mtr | con1edchathras | 180 | |
| 28 | Carriage of LT XLPE PVC Cable 1x400 Sqmm | Carriage of LT XLPE PVC Cable 1x400 Sqmm from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms ) | 2,240 | mtr | con1edchathras | 180 | |
| 29 | Carriage of LT XLPE PVC Cable 1x240 Sqmm | Carriage of LT XLPE PVC Cable 1x240 Sqmm from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms ) | 500 | mtr | con1edchathras | 180 | |
| 30 | Carriage of LT ABC Cable 3x120plus1x95plus1x16 sqmm | Carriage of LT ABC Cable 3x120+1x95+1x16 sqmm from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour T&P etc which required for proper completion of work (Distance 00 50 Kms ) | 60 | mtr | con1edchathras | 180 | |
| 31 | Carriage of 11 KV TPMO with Polymer Insualator | Carriage of 11 KV TPMO with Polymer Insualator | 14 | no | con1edchathras | 180 | |
| 32 | Errection of Pcc Pole 8 5 Mtr Long | Errection of Pcc Pole 8 5 Mtr Long with grouting including Cutting of kharanja mettalic road concrete portion while digging pit & complete H T L T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour T&P and carrier etc required for proper completion of work | 16 | no | con1edchathras | 180 | |
| 33 | Errection of Pcc Pole 11 Mtr Long | Errection of Pcc Pole 11 Mtr Long with grouting including Cutting of kharanja mettalic road concrete portion while digging pit & complete H T L T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour T&P and carrier etc required for proper completion of work | 12 | no | con1edchathras | 180 | |
| 34 | Fixing of Stone Pad | Fixing of Stone Pad | 24 | no | con1edchathras | 180 | |
| 35 | Fixing of AL LUG Long Barrel Off Size | Fixing of AL LUG Long Barrel Off Size | 792 | no | con1edchathras | 180 | |
| 36 | Fixing of Holding Clamp | Fixing of Holding Clamp | 143 | no | con1edchathras | 180 | |
| 37 | Fixing of M s Top Channel 125x65x2240 mm | Fixing of M s Top Channel 125x65x2240 mm | 14 | no | con1edchathras | 180 | |
| 38 | Fixing of MS Dropper Channel 100x50x2028 mm | Fixing of MS Dropper Channel 100x50x2028 mm | 30 | no | con1edchathras | 180 | |
| 39 | Fixingof Number Plate | Fixingof Number Plate | 1 | no | con1edchathras | 180 | |
| 40 | Fixing of MS Angle T F base With Clamp and nut bolt | Fixing of MS Angle T F base With Clamp and nut bolt | 26 | no | con1edchathras | 180 | |
| 41 | Fixing of Barbed Wire | Fixing of Barbed Wire | 56 | kg | con1edchathras | 180 | |
| 42 | Fixing of Danger Board | Fixing of Danger Board | 14 | no | con1edchathras | 180 | |
| 43 | Fixing of Copper L Piece | Fixing of Copper L Piece | 216 | no | con1edchathras | 180 | |
| 44 | Fixing of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V | Fixing of Henley Type Tailless Unit Protection Cubicle Panel 500A 650V | 44 | no | con1edchathras | 180 | |
| 45 | Fixing of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box | Fixing of LT Fuse Set Protection Unit for 25 KVA DT with SMC Box | 13 | no | con1edchathras | 180 | |
| 46 | Fixing of M s Nut and Bolt | Fixing of M s Nut & Bolt | 56 | kg | con1edchathras | 180 | |
| 47 | Fixing of 11 KV Pin Insulator With Pin | Fixing of 11 KV Pin Insulator With Pin | 42 | no | con1edchathras | 180 | |
| 48 | Fixing of 11 KV Disc Insulator With Fitting | Fixing of 11 KV Disc Insulator With Fitting | 21 | no | con1edchathras | 180 | |
| 49 | Fixing of Fuse Set | Fixing of Fuse Set | 14 | no | con1edchathras | 180 | |
| 50 | Fixing of 11 KV TPMO with Polymer Insualator | Fixing of 11 KV TPMO with Polymer Insualator | 14 | no | con1edchathras | 180 | |
| 51 | Fixing of Suspension Clamp | Fixing of Suspension Clamp | 6 | no | con1edchathras | 180 | |
| 52 | Errection of Dead End Clamp | Errection of Dead End Clamp | 2 | no | con1edchathras | 180 | |
| 53 | Fixing of I Hook J Hook | Fixing of I Hook J Hook | 8 | no | con1edchathras | 180 | |
| 54 | Installation of 25 KVA 11 0 4 KV T F on newly constructed double pole in proper alignment | Installation of 25 KVA 11 0 4 KV T F on newly constructed double pole in proper alignment direction & making HT LT connection | 13 | no | con1edchathras | 180 | |
| 55 | Installation of 250 KVA T F on newly Old constructed Plinth in proper alignment | Installation of 250 KVA T F on newly Old constructed Plinth in proper alignment direction & making HT LT connection all Cost of labour and T&P which required for completion of work | 44 | no | con1edchathras | 180 | |
| 56 | Dismenteling of 10 16 KVA T F | Dismenteling of 10 16 KVA T F from Double Pole with opening of all HT LT Jumpers all works which required for dismentling of T F | 13 | no | con1edchathras | 180 | |
| 57 | Dismenteling of 100 KVA T F | Dismenteling of 100 KVA T F from Double Pole with opening of all HT LT Jumpers all works which required for dismentling of T F | 43 | no | con1edchathras | 180 | |
| 58 | Errection and grouting of stays | Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer Grouting material i e cement sand brick ballast stone ballast etc shall be arranged by the contractor at his own cost | 28 | no | con1edchathras | 180 | |
| 59 | Fixing of earthing rod | Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer | 28 | no | con1edchathras | 180 | |
| 60 | Laying LT XLPE PVC Cable 3 5x70 Sqmm | Laying LT XLPE PVC Cable 3 5x70 Sqmm | 260 | mtr | con1edchathras | 180 | |
| 61 | Laying LT XLPE PVC Cable 1x400 Sqmm | Laying LT XLPE PVC Cable 1x400 Sqmm | 2,240 | mtr | con1edchathras | 180 | |
| 62 | Laying LT XLPE PVC Cable 1x240 Sqmm | Laying LT XLPE PVC Cable 1x240 Sqmm | 500 | mtr | con1edchathras | 180 | |
| 63 | Laying LT ABC Cable 3x120 plus 1x95 plus 1x16 sqmm | Laying LT ABC Cable 3x120 plus 1x95 plus 1x16 sqmm | 60 | mtr | con1edchathras | 180 | |
| 64 | Laying Insulated Weasel Conductor | Laying Insulated Weasel Conductor | 420 | mtr | con1edchathras | 180 | |
| 65 | Construction of plinth of size 2x2x1 point 5 M | Construction of plinth of size 2x2x1 5 M above ground level one ft below the ground level of 9 inch After Exavation of 4 inch earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9 inchwidth by fist class brick in ratio 1 ratio 4 of cement & sand shall be made The earth shall be filled up to one ft below the top of the plinth After this brick ballast shall be provided upto 6 inch from the earth level and proper rammering shall be done one No jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth The 12 mm thick plastering shall be done all round the plinth in 1 4 ratio of cement and sand | 44 | job | con1edchathras | 180 | |
| 66 | Pipe and Water Level earthing of 250 KVA medium Power Transformers | Pipe & Water Level earthing of 250 KVA medium Power Transformers | 88 | job | con1edchathras | 180 | |
| 67 | Net Fencing Shall be 1150x1200 mm made of 35x35 mm MS Angle | Net Fencing Shall be 1150x1200 mm made of 35x35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt and nut | 44 | job | con1edchathras | 180 | |
| 68 | Back Cartage of 10 16 KVA T F | Back Cartage of 10 16 KVA T F and carriage it up to Store Hathras J E Store all cost of labour and T and P which required for completion of work | 13 | no | con1edchathras | 180 | |
| 69 | Back Cartage of 100 KVA T F | Back Cartage of 100 KVA T F and carriage it up to Store Hathras J E Store all cost of labour and T&P which required for completion of work | 43 | no | con1edchathras | 180 |
Extended Deadline
27-Aug-2026, 8:30 am
Opening Date
27-Aug-2026, 9:00 am
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer