TenderDekho Logo
Closed GEM

Indian Army Pin Locking Left/Right, Spring, Washer Set Tender Delhi NCR 2026

Bid Publish Date

04-Sep-2026, 7:16 pm

Bid End Date

14-Sep-2026, 8:00 pm

Value

₹95,000

Location

Progress

Issue04-Sep-2026, 7:16 pm
Technical09-Oct-2026, 2:42 pm
Financial
AwardCompleted

Key Highlights

  • • Brand/OEM requirements: Not explicitly specified; be prepared to supply generic mechanical components with batch-level traceability.
  • • Technical certifications: No specific standards listed; propose ISO 9001 or equivalent quality controls where feasible for bulk supply.
  • • Special clauses: Option clause allows ±25% quantity changes; delivery timelines adjust proportionally with minimum 30 days.
  • • Eligibility criteria: Prior experience in supplying mechanical fasteners and related hardware; strong sample-based approval process.

Tender Overview

The Indian Army (Department Of Military Affairs) seeks procurement of a broad range of mechanical hardware components including Pin Locking Left, Pin Locking Right, Spring Torsion, Washer Leather Set, Pin Shouldered, Shim, Screw Locking, Plug Over Flow H, Bellow Rubber, Grip Handle, Nut Plain Wing Steel, Screw Socket Head, Screw Slotted Cheese Head, Spring Helical Compression, Knob, Plunger detent, Screw Grub Slotted, Wedge Pin Axis Shell Retainer, Spacer Plate, Spring Helical Extension, Bearing Tapered Roller, Seal Plain Encased, Screw Grub, Bushing Sleeve. Estimated value is ₹95,000.00 with 26 listed BOQ items but no itemwise specifications provided. Location unspecified; tender emphasizes option quantities up to 25% and advance sample approvals prior to bulk manufacturing. This procurement targets standard mechanical fasteners and fittings for military hardware and requires alignment with the buyer’s sample-based acceptance framework.

Technical Specifications & Requirements

  • Product categories include a wide range of locking, fastening, sealing and bearing components (pin locks, springs, washers, handles, nuts, screws, bushings, seals, and spirals).
  • No explicit technical specs in the data; bidders should prepare to demonstrate compatibility with standard mechanical assembly practices and ensure bulk supply readiness once reference samples are approved.
  • Key process requirements include advance sample submission within 5 days of contract award; approval or modification list provided within 5 days; bulk supply must conform to approved sample; if delays occur, delivery period may be refixed with no LD for sample-related delays.
  • Option clause permits +/- 25% quantity adjustments during and after contract, with delivery period adjustments calculated as (additional quantity / original quantity) × original delivery period, minimum 30 days.
  • The bid framework allows testing samples at contractor’s cost unless otherwise prescribed and places responsibility on supplier for any major deviations.

Terms, Conditions & Eligibility

  • EMD: Not specified in the provided data; bidders should verify collateral requirements in the tender portal.
  • Delivery: Extended delivery time policies apply with 30-day minimum extension as per option clause; actual delivery dates will align to original plus calculated extension.
  • Payment terms: Not specified; bidders should seek clarification on payment schedule, milestones and any advance against samples.
  • Documents: Prepare standard bidder documents (GST, PAN, experience certificates, financials) and OEM authorizations if applicable; ensure readiness for advance sample submission and conformity testing.
  • Warranty/after-sales: Not detailed; bidders should confirm warranty expectations and support commitments during contract discussions.
  • Quality/standards: No explicit standards listed; propose to meet general mechanical hardware quality controls and any army-inspection criteria post-sample approval.

Key Specifications

  • Product names: Pin Locking Left, Pin Locking Right, Spring Torsion, Washer Leather Set, Pin Shouldered, Shim, Screw Locking

  • Quantities/values: Estimated value ₹95,000.00; 26 BOQ items listed, exact quantities not disclosed

  • EMD/Value: EMD not specified in data; verify during bid submission

  • Experience: Demonstrated capability to supply mechanical hardware components with sample approval workflow

  • Quality/standards: No explicit standards listed; propose generic QC and traceability

Terms & Conditions

  • Option clause permits ±25% quantity changes with proportional delivery extension

  • Advance sample submission within 5 days of award; modifications provided within 5 days

  • Bulk supply must follow approved sample; non-conforming samples may lead to contract termination

Important Clauses

Payment Terms

Payment details not specified; bidders should confirm milestone-based payments and any advance for samples during bid submission.

Delivery Schedule

Delivery period can extend with option clause; extended time computed as (additional quantity/original quantity) × original delivery period, minimum 30 days.

Penalties/Liquidated Damages

No explicit LD figure; bidders should seek clarity on penalties for late delivery or non-conformance post-sample approval.

Bidder Eligibility

  • Experience in supplying mechanical hardware components and fasteners

  • Ability to provide advance sample within 5 days of award

  • Capability to scale production to meet 25% quantity increase during contract

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
A One Enterprises   Under PMA
-10-09-2026 20:12:09
2
Allied Business Corporation   Under PMA
-07-09-2026 15:35:33
3
HERCULES CORPORATION   Under PMA
-08-09-2026 20:47:57

Financial Results

Rank Seller Price Item
L1
Allied Business Corporation(MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : Pin Locking Left,Pin Locking Right,Spring Torsion,Washer Leather Set,Pin Shouldered,Shim,Screw Lock
L2
HERCULES CORPORATION (MII)   Under PMA
Item Categories : Pin Locking Left,Pin Locking Right,Spring Torsion,Washer Leather Set,Pin Shouldered,Shim,Screw Lock
L3
A One Enterprises (MII)   Under PMA
Item Categories : Pin Locking Left,Pin Locking Right,Spring Torsion,Washer Leather Set,Pin Shouldered,Shim,Screw Lock

Tender Data

Bid Details

Quantity

97

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

Pin Locking Left , Pin Locking Right , Spring Torsion , Washer Leather Set , Pin Shouldered , Shim , Screw Locking , Plug Over Flow H , Bellow Rubber , Grip Handle , Nut Plain Wing Steel , Screw Socket Head , Screw Slotted Cheese Head , Spring Helical Compression , Knob , Plunger detent , Screw Grub Slotted , Wedge Pin Axis Shell Retainer , Spacer Pate , Spring Helical Extension , Bearing Tapered Roller , Seal Plain Encased , Screw Grub , Bushing Sleeve

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Kamrup

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KamrupKamrup--230-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9849114.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 26 Items Sign in for GEM prices

#1

Pin Locking Left

5315 005049

2 pieces Delivery: 30 days
#2

Pin Locking Right

5315 005048

2 pieces Delivery: 30 days
#3

Spring Torsion

1015 000371

1 pieces Delivery: 30 days
#4

Washer Leather Set

5310 012276

2 pieces Delivery: 30 days
#5

Pin Shouldered

5315 006159

4 pieces Delivery: 30 days
#6

Shim

5365 005213

4 pieces Delivery: 30 days
#7

Screw Locking

IFL 8211

3 pieces Delivery: 30 days
#8

Plug Over Flow H

5365 005213

3 pieces Delivery: 30 days
#9

Bellow Rubber

1015 004012

4 pieces Delivery: 30 days
#10

Grip Handle

5340 175282

8 pieces Delivery: 30 days
#11

Nut Plain Wing Steel

5310 001662

2 pieces Delivery: 30 days
#12

Screw Socket Head

5305 015022

4 pieces Delivery: 30 days
#13

Screw Slotted Cheese Head

IFL 8520

2 pieces Delivery: 30 days
#14

Spring Helical Compression

5360 004376

8 pieces Delivery: 30 days
#15

Knob

5355 001494

2 pieces Delivery: 30 days
#16

Plunger detent

5340 014709

2 pieces Delivery: 30 days
#17

Screw Grub Slotted

5305 015018

2 pieces Delivery: 30 days
#18

Wedge Pin Axis Shell Retainer

5305 091013

4 pieces Delivery: 30 days
#19

Spacer Pate

5365 005921

4 pieces Delivery: 30 days
#20

Plunger detent

5340 014712

8 pieces Delivery: 30 days
#21

Spring Helical Extension

5360 003799

2 pieces Delivery: 30 days
#22

Bearing Tapered Roller

3110 004305

8 pieces Delivery: 30 days
#23

Seal Plain Encased

5330 382984

8 pieces Delivery: 30 days
#24

Screw Locking

1015 003219

2 pieces Delivery: 30 days
#25

Screw Grub

5305 015020

4 pieces Delivery: 30 days
#26

Bushing Sleeve

3120 104728

2 pieces Delivery: 30 days

Categories 14

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar mechanical hardware supply

4

Financial statements (audited if available)

5

EMD documentation (if required by buyer terms)

6

Technical bid documents and product specifications

7

OEM authorization or dealer/Distributor certificates (if applicable)

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid for mechanical hardware tender in India Army 2026?

Bidders should register on the government portal, upload GST and PAN, provide experience certificates for similar hardware supply, submit technical bid with product specs, and ensure readiness for advance sample submission within 5 days of contract award; comply with option clause for quantity changes.

What documents are required for Indian Army hardware tender in 2026?

Required documents include GST certificate, PAN card, experience certificates for similar projects, financial statements, EMD documentation if applicable, technical bid and OEM authorizations or dealer certificates; prepare advanced samples if requested by buyer within 5 days.

What are the delivery terms for option-based quantity changes?

The buyer may increase or decrease quantity by up to 25% at contract placement and during currency; delivery period extends proportionally: (additional/original) × original period, minimum 30 days; extension aligns with last delivery schedule.

Which standards or certifications are required for these hardware items?

Explicit standards are not listed; bidders should ensure ISO 9001-like quality controls and traceability for mechanical components; confirm any army-specific inspection or reference sample criteria during contract finalization.

How is advance sample approval processed for the Indian Army tender?

Within 5 days of award, submit advance samples; buyer approves or provides a modification list within 5 days; bulk supply must conform to approved sample; delays may shift delivery without LD.

What is the estimated value and item scope for this tender?

Estimated value is ₹95,000.00 with 26 BOQ items listed; however, item-wise quantities are not disclosed; bidders should plan scalable production to accommodate 25% quantity variation.

What happens if the sample fails to meet contract specifications?

If samples show major deviations, the buyer may require new samples or terminate the contract; bulk supply depends on supplier addressing deviations and obtaining approval for the revised sample.

What payment terms should bidders expect for this procurement?

Payment terms are not specified in the data; bidders should seek clarity on milestone payments, any advance for samples, and timelines for post-delivery settlement during contract negotiations.

Advertisement