Progress
RAIndian Army invites bids for an LT UG Cable project in Ranchi, Jharkhand for 50 sqmm 4-core aluminium conductor XLPE insulated cable rated 1100 volts. Estimated value is ₹297,800. Scope includes trenching in soft soil up to 2 m depth/width, removal and disposal of surplus material within 50 m, backfilling in layers of 25 cm, density and watering, and installation of SF heat shrinkable straight jointing kit suitable for XLPE insulated conductors. The contract provides an option to increase quantity by up to 25% at contracted rates and extended delivery time as per the option clause. Unique elements include installation, testing, crimping, and directed placement as specified by the buyer. This procurement targets reliable supply and field installation under military standards in a controlled environment.
LT UG Cable with aluminium conductor, 1100V grade, 50 sqmm, 4-core
XLPE insulation for aluminium conductors
SF heat shrinkable straight jointing kit compatible with 50 sqmm 4-core XLPE cable
Site works: excavation in soft soil up to 2 m depth/2 m width
Removal and deposition of surplus material within 50 m
Backfill in layers not exceeding 25 cm, levelled and watered
Crimping and testing as directed by buyer
Option Clause allows ±25% quantity variation at contracted rates
Delivery period starts after last date of original order; extended time calculated with minimum 30 days
EMD amount not specified; bidders to verify during bid submission
Payment terms are not explicitly defined in data; bidders should verify terms at bid submission and align with government procurement norms
Delivery period commences from the last date of the original delivery order; option-based quantity changes affect delivery time per formula
No LD details specified in provided data; bidders should seek clarified LD provisions during bid clarifications
Experience in supplying or executing LT UG cable installations with XLPE insulated aluminium conductors
Ability to perform excavation, backfilling, and jointing work as described
Compliance with Indian Army procurement norms and on-site safety requirements
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | UNITED BUILDERS(MSE) Under PMA Winner | ₹2,92,385 | Item Categories : LT UG Cable with aluminium conductor 1100 volts grade cross sectional area 50 sqmm three point five |
| L2 | EXCEL ENTERPRISES (MSE) Under PMA | ₹2,95,545 | Item Categories : LT UG Cable with aluminium conductor 1100 volts grade cross sectional area 50 sqmm three point five |
🎉 L1 Winner
UNITED BUILDERS(MSE) Under PMA
Final Price: ₹2,92,385
Start
12-Sep-2026, 4:00 pm
End
14-Sep-2026, 4:00 pm
Duration: 48 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
371
Category
LT UG Cable with aluminium conductor 1100 volts grade cross sectional area 50 sqmm three point five core connecrted with aluminium lugs
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Past Performance
50 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
LT UG Cable with aluminium conductor 1100 volts grade cross sectional area 50 sqmm three point five core connecrted with aluminium lugs , Excavation trenches soft loose soil n exc 2mtr wide n exc 2 mtr depth getting out taking out laying cable as specified directed , Removing surplus excavated material not exc 50 mtrs depositing directed at level not exc 2 mtr above starting point as specified directed , Returning filling in including spreading levelling watering well ramming in layers not exc 25 cm thick as specified directed , S F Heat shrinkable straight Jointing Kit suitable grade XLPE insulated aluminium conductor cable of 50 sqmm 4 core proper crimping testing as specified directed
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Ranchi
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Ranchi | Ranchi | - | - | 279 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
LT UG Cable with aluminium conductor 1100 volts grade cross sectional area 50 sqmm three point five core connecrted with aluminium lugs
LT UG Cable with aluminium conductor 1100 volts grade cross sectional area 50 sqmm three point five core connecrted with aluminium lugs
Excavation trenches soft loose soil n exc 2mtr wide n exc 2 mtr depth getting out taking out laying cable as specified directed
Excavation trenches soft loose soil n exc 2mtr wide n exc 2 mtr depth getting out taking out laying cable as specified directed
Removing surplus excavated material not exc 50 mtrs depositing directed at level not exc 2 mtr above starting point as specified directed
Removing surplus excavated material not exc 50 mtrs depositing directed at level not exc 2 mtr above starting point as specified directed
Returning filling in including spreading levelling watering well ramming in layers not exc 25 cm thick as specified directed
Returning filling in including spreading levelling watering well ramming in layers not exc 25 cm thick as specified directed
S F Heat shrinkable straight Jointing Kit suitable grade XLPE insulated aluminium conductor cable of 50 sqmm 4 core proper crimping testing as specified directed
S F Heat shrinkable straight Jointing Kit suitable grade XLPE insulated aluminium conductor cable of 50 sqmm 4 core proper crimping testing as specified directed
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | LT UG Cable with aluminium conductor 1100 volts grade cross sectional area 50 sqmm three point five core connecrted with aluminium lugs | LT UG Cable with aluminium conductor 1100 volts grade cross sectional area 50 sqmm three point five core connecrted with aluminium lugs | 279 | rm | bsodipatoli123@mes | 15 | |
| 2 | Excavation trenches soft loose soil n exc 2mtr wide n exc 2 mtr depth getting out taking out laying cable as specified directed | Excavation trenches soft loose soil n exc 2mtr wide n exc 2 mtr depth getting out taking out laying cable as specified directed | 45 | cum | bsodipatoli123@mes | 15 | |
| 3 | Removing surplus excavated material not exc 50 mtrs depositing directed at level not exc 2 mtr above starting point as specified directed | Removing surplus excavated material not exc 50 mtrs depositing directed at level not exc 2 mtr above starting point as specified directed | 1 | cum | bsodipatoli123@mes | 15 | |
| 4 | Returning filling in including spreading levelling watering well ramming in layers not exc 25 cm thick as specified directed | Returning filling in including spreading levelling watering well ramming in layers not exc 25 cm thick as specified directed | 45 | cum | bsodipatoli123@mes | 15 | |
| 5 | S F Heat shrinkable straight Jointing Kit suitable grade XLPE insulated aluminium conductor cable of 50 sqmm 4 core proper crimping testing as specified directed | S F Heat shrinkable straight Jointing Kit suitable grade XLPE insulated aluminium conductor cable of 50 sqmm 4 core proper crimping testing as specified directed | 1 | each | bsodipatoli123@mes | 15 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar LT UG cable projects
Financial statements or turnover evidence
EMD/Security deposit documents (if applicable)
Technical bid submission documents
OEM authorizations (if required for connectors/joint kits)
Any site-specific compliance certificates
Key insights about JHARKHAND tender market
Bidders must meet eligibility criteria for military procurement, submit GST, PAN, experience certificates, financials, EMD (if applicable), OEM authorizations, and technical bid documents. Ensure compliance with XLPE 50 sqmm 4-core aluminium conductor specs and heat shrink jointing kit requirements. Follow option clause for quantity adjustments and confirm delivery terms.
Required documents include GST certificate, PAN card, experience certificates for similar LT UG cable work, financial statements, EMD/Security deposit (if applicable), technical bid, OEM authorizations, and any site-specific safety or quality certificates. Ensure documents reflect experience with 50 sqmm XLPE aluminium conductors.
Specifications specify aluminium conductor with XLPE insulation, rated 1100V, cross-section 50 sqmm, and 4-core configuration. Include compatible SF heat shrinkable straight jointing kit and ensure crimping/testing as directed. Site works cover trenching up to 2 m depth/width and 50 m material deposition radius.
Delivery period begins after the last date of the original delivery order. If the buyer exercises the option clause, the extended time is calculated by (additional quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. Ensure compliant project scheduling and contingency planning.
EMD amount is not disclosed in the provided data. Bidders should verify the exact EMD requirements during bid submission and prepare payment methods in line with government procurement norms, ensuring readiness for online or DD-based submissions if specified.
Scope includes excavation in soft soil to 2 m depth and 2 m width, removal and deposition of surplus material within 50 m, backfilling with layers up to 25 cm, leveling, and watering. Final seamless cable laying with testing and crimping on XLPE aluminium conductors is required.
No explicit standards are listed in data. Bidders should align with military procurement norms, ensure supplier and material traceability for aluminium 50 sqmm XLPE conductors, and obtain OEM authorizations and quality certifications as applicable to XLPE and heat shrink joint kits.
If the purchaser increases or decreases quantity by up to 25%, the quantities will be adjusted at the contracted rates. Delivery time will scale according to the formula provided, ensuring minimum 30 days for extended periods and maintaining schedule integrity for subsequent deliveries.