TenderDekho Logo
Closed GEM

Procurement Opportunity: 0.75 Inch Half coupling,0.75 Inch Pipes,1 InchElbow 90,1 InchElbow 45,3 Inch Endcaps,8 Inch Endcaps in VISAKHAPATNAM, ANDHRA PRADESH

Bid Publish Date

18-Nov-2025, 12:51 pm

Bid End Date

28-Nov-2025, 3:00 pm

Progress

RA
Issue18-Nov-2025, 12:51 pm
Reverse Auction16-Dec-2025, 10:00 am
Award30-Jan-2026, 1:22 am
Explore all 4 tabs to view complete tender details

Quantity

2008

Category

0.75 Inch Half coupling

Bid Type

Two Packet Bid

Categories 12

Hindustan Petroleum Corporation Ltd announces a tender for 0. 75 Inch Half coupling, 0. 75 Inch Pipes, 1 InchElbow 90, 1 InchElbow 45, 3 Inch Endcaps, 8 Inch Endcaps, 10 Inch Equal Tee, 2 Inch Flanges, 3 Inch Flanges, 8 Inch Flanges, 1 Inch Flanges, 0. 5 Inch Flanges WNRF, 0. 75 Inch Flanges WNRF, 1 Inch Flanges WNRF, 1 InchHalf coupling, 10 Inch pipe, 2 Inch pipe, 0. 5 Inch Flange, 1 Inch Flange SORF, 1 Inch PIPE, 1 Inch Flange, 0. 5 Inch Pipe, 0. 5 Inch ELBOW 45, 0. 5 Inch ELBOW 90, 1 ELBOW 90, 4 ELBOW 90, 0. 5 Inch EQUAL TEE, 1 Inch HALF COUPLING, 1 Inch FULL COUPLING, 0. 5 Inchx0. 75 Inch REDUCER, 1 InchX 0. 5 Inch REDUCER, 0. 5 Inch WNRF FLANGES, 0. 75 Inch WNRF FLANGES, 1 Inch WNRF FLANGES, 1 Inchx0. 75 Inch REDUCER TEE, 0. 5 Inch PIPE, 0. 75 InchPIPE, 0. 75 Inch SORF, 0. 5 Inch SORF, 1 Inch Elbow 45deg, 1. 5 Inch Elbow 45deg, 1. 5 Inch Full coupling, 0. 5 Inch Half Coupling, 20 Inch SOFF Flange, 6 Inch Equal Tee, 6 Inch 90deg Elbow, 6 Inch 150LB SOFF, 3 Inch 90deg Elbow, 3 Inch 150LB SOFF, 3 Inch GI Pipe in VISAKHAPATNAM, ANDHRA PRADESH. Quantity: 2008. Submission Deadline: 28-11-2025 15: 00: 00. Last date to apply is approaching fast!

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

0.75 Inch Half coupling , 0.75 Inch Pipes , 1 InchElbow 90 , 1 InchElbow 45 , 3 Inch Endcaps , 8 Inch Endcaps , 10 Inch Equal Tee , 2 Inch Flanges , 3 Inch Flanges , 8 Inch Flanges , 1 Inch Flanges , 0.5 Inch Flanges WNRF , 0.75 Inch Flanges WNRF , 1 Inch Flanges WNRF , 1 InchHalf coupling , 10 Inch pipe , 2 Inch pipe , 0.5 Inch Flange , 1 Inch Flange SORF , 1 Inch PIPE , 1 Inch Flange , 0.5 Inch Pipe , 0.5 Inch ELBOW 45 , 0.5 Inch ELBOW 90 , 1 ELBOW 90 , 4 ELBOW 90 , 0.5 Inch EQUAL TEE , 1 Inch HALF COUPLING , 1 Inch FULL COUPLING , 0.5 Inchx0.75 Inch REDUCER , 1 InchX 0.5 Inch REDUCER , 0.5 Inch WNRF FLANGES , 0.75 Inch WNRF FLANGES , 1 Inch WNRF FLANGES , 1 Inchx0.75 Inch REDUCER TEE , 0.5 Inch PIPE , 0.75 InchPIPE , 0.75 Inch SORF , 0.5 Inch SORF , 1 Inch Elbow 45deg , 1.5 Inch Elbow 45deg , 1.5 Inch Full coupling , 0.5 Inch Half Coupling , 20 Inch SOFF Flange , 6 Inch Equal Tee , 6 Inch 90deg Elbow , 6 Inch 150LB SOFF , 3 Inch 90deg Elbow , 3 Inch 150LB SOFF , 3 Inch GI Pipe

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASHINDUSTAN PETROLEUM CORPORATION LTD

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-8602674.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 55 Items Sign in for GEM prices

#1

0.75 Inch Half coupling

As per Specification Document

40 each Delivery: 28 days
#2

0.75 Inch Pipes

As per Specification Document

20 meter Delivery: 28 days
#3

1 InchElbow 90

As per Specification Document

250 each Delivery: 28 days
#4

1 InchElbow 45

As per Specification Document

40 each Delivery: 28 days
#5

3 Inch Endcaps

As per Specification Document

40 each Delivery: 28 days
#6

8 Inch Endcaps

As per Specification Document

7 each Delivery: 28 days
#7

10 Inch Equal Tee

As per Specification Document

5 each Delivery: 28 days
#8

2 Inch Flanges

As per Specification Document

13 each Delivery: 28 days
#9

3 Inch Flanges

As per Specification Document

13 each Delivery: 28 days
#10

8 Inch Flanges

As per Specification Document

23 each Delivery: 28 days
#11

8 Inch Flanges

As per Specification Document

16 each Delivery: 28 days
#12

1 Inch Flanges

As per Specification Document

45 each Delivery: 28 days
#13

0.5 Inch Flanges WNRF

As per Specification Document

25 each Delivery: 28 days
#14

0.75 Inch Flanges WNRF

As per Specification Document

130 each Delivery: 28 days
#15

0.75 Inch Flanges WNRF

As per Specification Document

25 each Delivery: 28 days
#16

1 Inch Flanges WNRF

As per Specification Document

50 each Delivery: 28 days
#17

1 InchHalf coupling

As per Specification Document

40 each Delivery: 28 days
#18

1 Inch Flanges WNRF

As per Specification Document

45 each Delivery: 28 days
#19

10 Inch pipe

As per Specification Document

20 meter Delivery: 28 days
#20

2 Inch pipe

As per Specification Document

6 meter Delivery: 28 days
#21

0.5 Inch Flange

As per Specification Document

6 each Delivery: 28 days
#22

1 Inch Flange SORF

As per Specification Document

95 each Delivery: 28 days
#23

1 Inch PIPE

As per Specification Document

50 meter Delivery: 28 days
#24

1 Inch Flange

As per Specification Document

35 each Delivery: 28 days
#25

0.5 Inch Pipe

As per Specification Document

24 meter Delivery: 28 days
#26

1 Inch Flange

As per Specification Document

20 each Delivery: 28 days
#27

0.5 Inch ELBOW 45

As per Specification Document

25 each Delivery: 28 days
#28

0.5 Inch ELBOW 90

As per Specification Document

80 each Delivery: 28 days
#29

1 ELBOW 90

As per Specification Document

55 each Delivery: 28 days
#30

4 ELBOW 90

As per Specification Document

12 each Delivery: 28 days
#31

0.5 Inch EQUAL TEE

As per Specification Document

20 each Delivery: 28 days
#32

1 Inch HALF COUPLING

As per Specification Document

20 each Delivery: 28 days
#33

1 Inch FULL COUPLING

As per Specification Document

35 each Delivery: 28 days
#34

0.5 Inchx0.75 Inch REDUCER

As per Specification Document

24 each Delivery: 28 days
#35

1 InchX 0.5 Inch REDUCER

As per Specification Document

6 each Delivery: 28 days
#36

0.5 Inch WNRF FLANGES

As per Specification Document

6 each Delivery: 28 days
#37

0.75 Inch WNRF FLANGES

As per Specification Document

20 each Delivery: 28 days
#38

1 Inch WNRF FLANGES

As per Specification Document

50 each Delivery: 28 days
#39

1 Inchx0.75 Inch REDUCER TEE

As per Specification Document

5 each Delivery: 28 days
#40

1 Inch PIPE

As per Specification Document

150 meter Delivery: 28 days
#41

0.5 Inch PIPE

As per Specification Document

150 meter Delivery: 28 days
#42

0.75 InchPIPE

As per Specification Document

12 meter Delivery: 28 days
#43

0.75 Inch SORF

As per Specification Document

20 each Delivery: 28 days
#44

0.5 Inch SORF

As per Specification Document

20 each Delivery: 28 days
#45

1 Inch Elbow 45deg

As per Specification Document

25 each Delivery: 28 days
#46

1.5 Inch Elbow 45deg

As per Specification Document

30 each Delivery: 28 days
#47

1.5 Inch Full coupling

As per Specification Document

15 each Delivery: 28 days
#48

0.5 Inch Half Coupling

As per Specification Document

20 each Delivery: 28 days
#49

20 Inch SOFF Flange

As per Specification Document

2 each Delivery: 28 days
#50

6 Inch Equal Tee

As per Specification Document

10 each Delivery: 28 days
#51

6 Inch 90deg Elbow

As per Specification Document

8 each Delivery: 28 days
#52

6 Inch 150LB SOFF

As per Specification Document

12 each Delivery: 28 days
#53

3 Inch 90deg Elbow

As per Specification Document

10 each Delivery: 28 days
#54

3 Inch 150LB SOFF

As per Specification Document

13 each Delivery: 28 days
#55

3 Inch GI Pipe

As per Specification Document

70 meter Delivery: 28 days

Required Documents

1

Experience Criteria

2

Certificate (Requested in ATC)

3

Additional Doc 1 (Requested in ATC)

4

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Reverse Auction Schedule

Completed

Start

16-Dec-2025, 10:00 am

End

17-Dec-2025, 10:00 am

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
**********   Under PMA
-26-11-2025 12:39:56
2
**********   Under PMA
-28-11-2025 12:59:39
3
**********   Under PMA
-25-11-2025 15:12:29
4
**********   Under PMA
-27-11-2025 23:48:28
5
**********   Under PMA
-27-11-2025 15:57:37
6
**********   Under PMA
-28-11-2025 13:29:47
7
**********   Under PMA
-25-11-2025 13:46:10
8
**********   Under PMA
-28-11-2025 13:19:07
9
**********   Under PMA
-27-11-2025 16:55:40
10
**********   Under PMA
-28-11-2025 14:29:09

Contract / Result Documents 2

Please sign in or create an account to view contract details and download result documents.