Progress
Quantity
1
Bid Type
Two Packet Bid
Indian Army announces a tender for Electric Two Wheeler - Motorcycle, Scooter and Moped (Q2) in KAMRUP, ASSAM. Quantity: 1. Submission Deadline: 26-02-2026 18: 00: 00. Last date to apply is approaching fast!
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Electric Two Wheeler - Motorcycle, Scooter and Moped (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| Generic Parameters | Type of Two Wheeler | Scooter |
| Generic Parameters | Category of Vehicle | L1 |
| Generic Parameters | Vehicle Colour Type | Solid, Matt Finish, Metallic Or higher |
| Generic Parameters | Driving Range with Full Charge Battery (Km) | 120.0 Or higher |
| Generic Parameters | Payload | 150.0 Or higher |
| Generic Parameters | Vehicle Max Speed in unladen condition (Kmph) | 45.0 Or higher |
| Motor | Motor Type | BLDC, PMSM Or higher |
| Motor | Motor Power (watts) | Above 2000 |
| Motor | Energy Consumption (kWh/100Km) [As per procedure mentioned in CMVR rules] | Any applicable numeric value |
| Battery | Type of Battery | Advance Chemistry Cell Battery (ACCB) Or higher |
| Battery | Battery Capacity (kWh) | Any applicable numeric value |
| Constructional Parameters | Type of Wheel | Alloy Wheels |
| Constructional Parameters | Type of Tyre | Tubeless |
| Constructional Parameters | Front Brake | Drum Brake, Disc Brake |
| Constructional Parameters | Rear Brake | Drum Brake |
| Constructional Parameters | Power Regeneration Facility | Yes, No |
| Performance Parameters | Vehicle Warranty (Years) | 3, 4, 5 Or higher |
| Performance Parameters | Electrical Parts Warranty (Years) | 3, 4, 5 Or higher |
| Performance Parameters | Battery Warranty (Years) | 3, 4, 5 Or higher |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
26-Feb-2026, 6:00 pm
Opening Date
26-Feb-2026, 6:30 pm
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS