TenderDekho Logo
Active GEM

Open Tender for SS ERW PIPE 323.9 X 4.57VTHK,SS ERW PIPE 406.4 X 4.06 TO AISI 304,SS ERW PIPE 114.3 X 3.0 TO AISI 3 in SOUTH GOA, GOA

Bid Publish Date

22-Oct-2026, 5:43 pm

Bid End Date

02-Nov-2026, 6:00 pm

Location

SOUTH GOA , GOA

Progress

Issue22-Oct-2026, 5:43 pm
AwardPending

Goa Shipyard Limited invites bids for SS ERW PIPE 323. 9 X 4. 57VTHK, SS ERW PIPE 406. 4 X 4. 06 TO AISI 304, SS ERW PIPE 114. 3 X 3. 0 TO AISI 304, DRAIN PIPE FOR MAIN DG SILENCER, DRAIN PIPE FOR EMER DG SILENCER, COPPER PIPE, JW PIPE FOR ME, Service 1, Service 2, Service 3, Service 4, Service 5, Service 6, Service 7 in SOUTH GOA, GOA. Quantity: 14. Submission Deadline: 02-11-2026 18: 00: 00. Submit your proposal before the deadline.

Advertisement

Tender Data

Bid Details

Quantity

14

Category

SS ERW PIPE 323.9 X 4.57VTHK

Bid Type

Single Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SS ERW PIPE 323.9 X 4.57VTHK , SS ERW PIPE 406.4 X 4.06 TO AISI 304 , SS ERW PIPE 114.3 X 3.0 TO AISI 304 , DRAIN PIPE FOR MAIN DG SILENCER , DRAIN PIPE FOR EMER DG SILENCER , COPPER PIPE , JW PIPE FOR ME , Service 1 , Service 2 , Service 3 , Service 4 , Service 5 , Service 6 , Service 7

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

SOUTH GOA

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-SOUTH GOASOUTH GOA--115-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10068851.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Goa Shipyard Limited

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 14 Items Sign in for GEM prices

#1

SS ERW PIPE 323.9 X 4.57VTHK

Thermal Insulation for Exhaust Pipes & Fittings (Main Engine Exhaust system)

1 nos Delivery: 15 days
#2

SS ERW PIPE 406.4 X 4.06 TO AISI 304

Thermal Insulation for Exhaust Pipes & Fittings (Main Engine Exhaust system)

1 nos Delivery: 15 days
#3

SS ERW PIPE 114.3 X 3.0 TO AISI 304

Thermal Insulation for Exhaust Pipes & Fittings (Main DG Exhaust system)

1 nos Delivery: 15 days
#4

DRAIN PIPE FOR MAIN DG SILENCER

Thermal Insulation for Exhaust Pipes & Fittings (Main DG Exhaust system)

1 nos Delivery: 15 days
#5

DRAIN PIPE FOR EMER DG SILENCER

Thermal Insulation for Exhaust Pipes & Fittings (Emergency DG Exhaust system)

1 nos Delivery: 15 days
#6

COPPER PIPE

Thermal Insulation for Exhaust Pipes & Fittings (HOT WATER PIPING & FITTINGS)

1 nos Delivery: 15 days
#7

JW PIPE FOR ME

Thermal Insulation for Exhaust Pipes & Fittings (HOT WATER PIPING & FITTINGS)

1 nos Delivery: 15 days
#8

Service 1

Service Engineer Charges for carrying out Thermal Insulation for Exhaust Pipes & Fittings (Main Engine Exhaust system)

1 set Delivery: 15 days
#9

Service 2

Service Engineer Charges for carrying out Thermal Insulation for Exhaust Pipes & Fittings (Main Engine Exhaust system)

1 set Delivery: 15 days
#10

Service 3

Service Engineer Charges for carrying out Thermal Insulation for Exhaust Pipes & Fittings (Main DG Exhaust system)

1 set Delivery: 15 days
#11

Service 4

Service Engineer Charges for carrying out Thermal Insulation for Exhaust Pipes & Fittings (Main DG Exhaust system)

1 set Delivery: 15 days
#12

Service 5

Service Engineer Charges for carrying out Thermal Insulation for Exhaust Pipes & Fittings (Main DG Exhaust system)

1 set Delivery: 15 days
#13

Service 6

Service Engineer Charges for carrying out Thermal Insulation for Exhaust Pipes & Fittings (HOT WATER PIPING & FITTINGS)

1 set Delivery: 15 days
#14

Service 7

Service Engineer Charges for carrying out Thermal Insulation for Exhaust Pipes & Fittings (HOT WATER PIPING & FITTINGS)

1 set Delivery: 15 days

Categories 45

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC)

4

Additional Doc 3 (Requested in ATC)

5

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement