Progress
The Maharashtra Energy Department seeks a supplier for a water purification system using UV (Ultra-Violet) or UV+UF (Ultra-Filtration) technology. The scope references a single procurement with related terms including optional quantity adjustments up to 25% at contract, and delivery timing linked to the original delivery window. A service center in Nagpur, Maharashtra is required, along with OEM authorization. The tender emphasizes turnover compliance for bidders and OEMs, validated by audited statements or CA certificates over the last three financial years. The opportunity is positioned within the state’s water treatment initiatives, with emphasis on compliance and contingency delivery planning while maintaining contracted rates.
Product/service: Water purification system with UV or UV+UF processing
Location requirement: Service center in Nagpur, Maharashtra
OEM authorization: Bid-specific OEM authorization required
Turnover: Minimum average annual turnover over last three years (as per bid document)
Delivery: Option clause allows up to 25% quantity variation with calculated extended delivery duration
Option clause permits up to 25% quantity increase during contract
Nagpur service center required; OEM authorization mandatory
Three-year turnover evidence required for bidder and OEM
Not specified in data; bidders should expect standard government bid terms per department policies
Delivery period begins after original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not specified in data; typical procurement penalties may apply per state norms
bidders must meet three-year turnover criteria with verifiable statements
OEM must have adequate turnover and supply capability for UV/UV+UF systems
Service center must be operational in Nagpur, Maharashtra
Quantity
2
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+1%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
OEM Avg. Turnover
1
Past Performance
30 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Filtration Process) (V2) (Q2)
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Nagpur
Delivery Pincodes
440013
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Sagar Prabhakar Ingle | 440013,O/o. Dy. Chief Engineer (TIC), Vidyut Bhavan, Katol Road | Nagpur | Maharashtra | 440013 | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) Card
Audited financial statements for the last three financial years
CA/Cost Accountant turnover certificate for relevant period
OEM authorization letter from the original equipment manufacturer
Proof of service center presence in Nagpur, Maharashtra
Bid security / EMD as per tender norms (amount not disclosed in data)
Technical compliance documents for UV/UV+UF water purification systems
Key insights about MAHARASHTRA tender market
To bid, ensure your organization meets the three-year turnover criteria with audited statements, obtain OEM authorization, and establish a Nagpur service center. Prepare GST, PAN, EMD, and technical compliance documents for the bid submission according to the T&C. The tender allows up to 25% quantity variation.
Submit GST certificate, PAN card, three-year turnover proof via audited statements or CA certificate, OEM authorization letter, service center proof in Nagpur, EMD, and technical compliance for UV/UV+UF systems. Include any required financials and experience certificates as specified by the buyer.
Delivery starts from the original delivery order date. If quantity increases by up to 25%, the extended delivery period uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days extension.
Yes. The bid requires an OEM authorization specific to the offered UV/UV+UF system, ensuring the supplier can warranty and service the equipment through an authorized OEM network, with a Nagpur service center as stipulated.
Bidders must show minimum average annual turnover over the last three financial years ending March 31 of the previous year, verified by audited balance sheets or CA certificates. If incorporated less than three years ago, turnover is calculated on completed years after incorporation.
The purchaser may increase contracted quantity by up to 25% during contract, with corresponding delivery time adjustments. Delivery time extension is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
A service center must be available in Nagpur, Maharashtra, to support installation, commissioning, and after-sales services for the UV/UV+UF water purification system.
The tender specifies UV or UV+UF water purification systems (V2) but does not list BOQ items or explicit performance metrics. Bidders should rely on OEM-certified system specifications and compliance with applicable standards in their technical bid.