BUSH,RECTIFIER ASSY,BRUSH GEAR ASSY,SOLONOID SWITCH,SOLONOID SWITCH,FIELD COIL ASSY,MIRROR ASSY L B
Indian Army
WEST DELHI, DELHI
Bid Publish Date
17-Nov-2025, 1:29 pm
Bid End Date
27-Nov-2025, 2:00 pm
Location
Progress
Quantity
91
Category
Knuckle Assy LH
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, seeks OEM-only spares for a broad range of mechanical assemblies, including Knuckle Assembly LH, Gear Lever Kit and Gear Lever components, belts, pumps, injectors, fuel rails, gaskets, clutch repair kits, air dryer assemblies, tie rods, relays, and related electronic/mechanical subsystems. The scope covers Supply, Installation, Testing, Commissioning, and operator training, with delivery to the East Patel Nagar unit in New Delhi. The contract allows quantity variation up to 25% at contracted rates and emphasizes original OEM specifications for all items. The BoQ lists 32 items across diverse automotive and defense subsystems, highlighting the breadth of required spares and the emphasis on genuine OEM parts.
OEM-spares only for: Knuckle Assembly LH, Gear Lever Kit, Air Dryer Assembly/Kit, Fuel Rail Sensor, 24V Washer Motor, Wiper Blade, 4 Pin Relay (24V, 30A/40A), Spring Loaded Switch, Self Starter, Isolator Switch
Delivery location: East Patel Nagar, New Delhi
Variation clause: up to 25% additional quantity during contract at contracted rates
Installation, Testing, Commissioning, and operator training included
Return/coordination responsibility for duplicate items lies with seller
OEM-only spare parts requirement with specific 32-item scope
Delivery to East Patel Nagar unit in New Delhi; duplicates return charges borne by seller
Option clause permits up to 25% quantity variation with adjusted delivery timelines
Delivery to East Patel Nagar, New Delhi, with clocking from last delivery order date; minimum 30 days for extended delivery period when calculating added time
Only original OEM specifications spares to be delivered; OEM authorization to be provided
Any duplicate items delivered are the seller's responsibility for return coordination and charges
Proven experience in supplying OEM-spares for defense or heavy-vehicle components
Authorization from OEM for distribution or direct supply of listed parts
Capability to deliver to a defense unit location in New Delhi with installation/commissioning support
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
WEST DELHI, DELHI
Indian Army
SOUTH DELHI, DELHI
Armed Forces Tribunal
LOHIT, ARUNACHAL PRADESH
Indian Army
SOUTH DELHI, DELHI
Armed Forces Tribunal
LOHIT, ARUNACHAL PRADESH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Knuckle Assy LH | Knuckle Assy LH | 1 | nos | adjt@22maratha | 15 |
| 2 | Belt Tensioner | Belt Tensioner | 1 | nos | adjt@22maratha | 15 |
| 3 | Water Pump | Water Pump | 1 | nos | adjt@22maratha | 15 |
| 4 | Compressor Belt | Compressor Belt | 1 | nos | adjt@22maratha | 15 |
| 5 | Alternator Belt | Alternator Belt | 1 | nos | adjt@22maratha | 15 |
| 6 | Injector Assy | Injector Assy | 2 | nos | adjt@22maratha | 15 |
| 7 | Fuel Rail Sensor | Fuel Rail Sensor | 1 | nos | adjt@22maratha | 15 |
| 8 | Head Gasket | Head Gasket | 2 | nos | adjt@22maratha | 15 |
| 9 | Clutch Master Cylinder rep kit 265129100148 | Clutch Master Cylinder rep kit 265129100148 | 10 | nos | adjt@22maratha | 15 |
| 10 | Gear Lever Kit | Gear Lever Kit | 2 | nos | adjt@22maratha | 15 |
| 11 | Gear Lever Knob | Gear Lever Knob | 1 | nos | adjt@22maratha | 15 |
| 12 | Gear Lever | Gear Lever | 1 | nos | adjt@22maratha | 15 |
| 13 | DDU Repair Kit Major | DDU Repair Kit Major | 1 | nos | adjt@22maratha | 15 |
| 14 | Air Dryer Assy | Air Dryer Assy | 1 | nos | adjt@22maratha | 15 |
| 15 | Fan Belt 1363 | Fan Belt 1363 | 3 | nos | adjt@22maratha | 15 |
| 16 | Air Dryer Kit Minor | Air Dryer Kit Minor | 1 | nos | adjt@22maratha | 15 |
| 17 | Tie Rod End LH | Tie Rod End LH | 1 | nos | adjt@22maratha | 15 |
| 18 | Tie Rod End RH | Tie Rod End RH | 1 | nos | adjt@22maratha | 15 |
| 19 | System Protection Valve Assy | System Protection Valve Assy | 1 | nos | adjt@22maratha | 15 |
| 20 | Brush Carrier Assy | Brush Carrier Assy | 2 | nos | adjt@22maratha | 15 |
| 21 | Bush Set | Bush Set | 2 | nos | adjt@22maratha | 15 |
| 22 | Flasher Unit 24V | Flasher Unit 24V | 8 | nos | adjt@22maratha | 15 |
| 23 | Rectifier Plate | Rectifier Plate | 2 | nos | adjt@22maratha | 15 |
| 24 | Washer Motor 24V | Washer Motor 24V | 5 | nos | adjt@22maratha | 15 |
| 25 | Wiper Blade | Wiper Blade | 16 | nos | adjt@22maratha | 15 |
| 26 | Sprinkler Mechanism | Sprinkler Mechanism | 4 | nos | adjt@22maratha | 15 |
| 27 | Piono Type Swtich 15 Amp | Piono Type Swtich 15 Amp | 5 | nos | adjt@22maratha | 15 |
| 28 | 4 Pin Relay 24V 30 and 40 Amp | 4 Pin Relay 24V 30 and 40 Amp | 4 | nos | adjt@22maratha | 15 |
| 29 | Spring Loaded Switch 15 Amp | Spring Loaded Switch 15 Amp | 4 | nos | adjt@22maratha | 15 |
| 30 | Spider Bearing 715 TC | Spider Bearing 715 TC | 4 | nos | adjt@22maratha | 15 |
| 31 | Self Starter | Self Starter | 1 | nos | adjt@22maratha | 15 |
| 32 | Isolator Switch | Isolator Switch | 1 | nos | adjt@22maratha | 15 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar OEM-spares supply
Financial statements (latest available)
EMD/Security deposit documentation as per tender norms
Technical bid documents confirming OEM authorization
OEM authorization letters from the original equipment manufacturer
Delivery capability and installation/commissioning plan
Any statutory clearances relevant to defense procurement
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | Associated Industrial Enterprises Under PMA | - | 20-11-2025 15:04:23 | Qualified |
| 2 | FAIR DEAL ELECTRONICS Under PMA | - | 21-11-2025 17:31:03 | Qualified |
| 3 | PEEKAY SUPPLY Under PMA | - | 22-11-2025 15:45:28 | Qualified |
| 4 | SOLDIER ENTERPRISES Under PMA | - | 25-11-2025 09:24:48 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | PEEKAY SUPPLY(MSE,MII)( MSE Social Category:General ) Under PMA | ₹1,42,155 | Item Categories : Knuckle Assy LH,Belt Tensioner,Water Pump,Compressor Belt,Alternator Belt,Injector Assy,Fuel Rail S |
| L2 | Associated Industrial Enterprises (MSE,MII)( MSE Social Category:General ) Under PMA | ₹1,46,976 | Item Categories : Knuckle Assy LH,Belt Tensioner,Water Pump,Compressor Belt,Alternator Belt,Injector Assy,Fuel Rail S |
| L3 | FAIR DEAL ELECTRONICS (MSE,MII)( MSE Social Category:General ) Under PMA | ₹1,49,853 | Item Categories : Knuckle Assy LH,Belt Tensioner,Water Pump,Compressor Belt,Alternator Belt,Injector Assy,Fuel Rail S |
| L4 | SOLDIER ENTERPRISES (MII) Under PMA | ₹1,52,848 | Item Categories : Knuckle Assy LH,Belt Tensioner,Water Pump,Compressor Belt,Alternator Belt,Injector Assy,Fuel Rail S |
Key insights about DELHI tender market
Bidders must meet OEM authorization requirements, submit GST, PAN, experience certificates, and financials, plus EMD as per tender norms. Provide OEM catalogs, installation/commissioning plan, and a commitment to supply OEM-only spares for all 32 listed items. Ensure delivery to East Patel Nagar unit, Delhi, with training included.
Submit GST certificate, PAN, experience certificates for defense spares, latest financial statements, EMD receipt, OEM authorization letters, technical bid indicating OEM compliance, installation/commissioning plan, and proof of delivery capability to East Patel Nagar, New Delhi.
Spares include Knuckle Assembly LH, Gear Lever Kit, Air Dryer Assembly/Kit, Fuel Rail Sensor, 24V Washer Motor, Wiper Blade, 24V Relays (30A/40A), and other listed items; all must be OEM-spec compliant and traceable to official catalogs or authorized distributors.
Delivery periods are linked to the option clause: initial period starts from the last delivery order date; extended time is calculated as (Increased quantity ÷ Original quantity) × Original period, with a minimum of 30 days.
Scope includes Supply, Installation, Testing, Commissioning of goods, and Training of operators; statutory clearances if required, with OEM spares used for all items listed in the BoQ.
Penalties are driven by contract terms for non-OEM items, delivery delays, and failure to provide training or commissioning support; duplicates must be returned at seller’s expense, and adherence to OEM specifications is mandatory.
The purchaser may increase/decrease quantity up to 25% at contracted rates; additional time is calculated per the formula, ensuring at least 30 days minimum if the original period is shorter.
Bidders should provide OEM certifications and catalogs; while specific IS/ISO standards are not listed, OEM-authorized documentation and OEM-spec conformance are mandatory for all 32 items.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS