PR 100254826 00010 M5529111082 ILMS ASSEMBLY, 4230156PVMB26301
Ntpc Limited
BHAGALPUR, BIHAR
Progress
RAQuantity
11
Category
MAJ204P531H1000007T01U01
Bid Type
Two Packet Bid
Public procurement opportunity for Hindustan Aeronautics Limited (hal) MAJ204P531H1000007T01U01, Modification of the existion jig as per iss H3 MAIN ASSEMBLY JIG COCKPIT MAJ204P531H1000007T01U01 JTO 6630-3 - ISS H3, MAJ204P535H1100003T03U01, Modification of the existion jig as per ISS H5 COUPLING JIGSTRUCTURE ASSY LCH CJ204P530H1000007T01U01 JTO 7529-5 ISS H5, SAJ204P531H1480007T01U01, MAJ204P711H0000007T01U01, LCHSKH 0027, LCHSKH 0021, LCHSKH 0022, LCHSKH 0023 in BANGALORE, KARNATAKA. Quantity: 11 issued by. Submission Deadline: 25-02-2025 13: 00: 00. View full details and respond.
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Ntpc Limited
BHAGALPUR, BIHAR
Ntpc Limited
BEGUSARAI, BIHAR
Office Of Dg (ace)
PUNE, MAHARASHTRA
Ntpc Limited
SONBHADRA, UTTAR PRADESH
Bharat Heavy Electricals Limited (bhel)
VARANASI, UTTAR PRADESH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | MAJ204P531H1000007T01U01 | MAIN ASSEMBLY JIG- COCKPIT | 1 | pieces | halhelicopterconsignee04 | 30 |
| 2 | Modification of the existion jig as per iss H3 MAIN ASSEMBLY JIG COCKPIT MAJ204P531H1000007T01U01 JTO 6630-3 - ISS H3 | Modification of the existion jig as per iss H3 MAIN ASSEMBLY JIG COCKPIT MAJ204P531H1000007T01U01 JTO 6630-3 - ISS H3 | 1 | pieces | halhelicopterconsignee04 | 30 |
| 3 | MAJ204P535H1100003T03U01 | MAIN ASSEMBLY JIG - TAIL BOOM | 2 | pieces | halhelicopterconsignee04 | 30 |
| 4 | Modification of the existion jig as per ISS H5 COUPLING JIGSTRUCTURE ASSY LCH CJ204P530H1000007T01U01 JTO 7529-5 ISS H5 | Modification of the existion jig as per ISS H5 - COUPLING JIG STRUCTURE ASSY- LCH - CJ204P530H1000007T01U01 JTO 7529-5 - ISS H5 | 1 | pieces | halhelicopterconsignee04 | 30 |
| 5 | SAJ204P531H1480007T01U01 | SUB ASSY JIG TOP FRAME ASSY | 1 | pieces | halhelicopterconsignee04 | 30 |
| 6 | MAJ204P711H0000007T01U01 | MAIN ASSEMBLY JIG COWLING | 1 | pieces | halhelicopterconsignee04 | 30 |
| 7 | LCHSKH 0027 | WORKING PLATFORM MAIN JIG 1 | 1 | pieces | halhelicopterconsignee04 | 30 |
| 8 | LCHSKH 0021 | WORKING PLATFROM COWLING ASSY | 1 | pieces | halhelicopterconsignee04 | 30 |
| 9 | LCHSKH 0022 | WORKING PLATFORM COWLING JIG | 1 | pieces | halhelicopterconsignee04 | 30 |
| 10 | LCHSKH 0023 | WORKING PLATFORM COWLING JIG | 1 | pieces | halhelicopterconsignee04 | 30 |
Discover companies most likely to bid on this tender
Certificate (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
25-Feb-2025, 1:00 pm
Opening Date
25-Feb-2025, 1:30 pm
Extended Deadline
27-Jan-2025, 1:00 pm
Opening Date
27-Jan-2025, 1:30 pm
Start
17-Apr-2025, 4:00 pm
End
25-Apr-2025, 2:00 pm
Duration: 190 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Key insights about KARNATAKA tender market
The eligibility requirements include being a registered entity, meeting minimum experience levels, and turnover criteria as specified in the tender. In case a bidder seeks exemption from these criteria, they must include supporting documents during submission.
Bidders must submit relevant certificates as requested in the Additional Terms and Conditions (ATC), demonstrating compliance with the BoQ specifications. Supporting documents related to turnover and experience may also be necessary if exemptions are claimed.
Interested parties can begin by registering on the GeM portal. Complete the necessary registration processes as outlined in the portal to receive updates and bidding opportunities related to this tender.
Accepted document formats typically include PDF, DOCX, and other formats as specified in the tender documentation. It is essential to adhere to these formats for a successful submission.
Yes, bidders must comply with specific technical specifications outlined in the BoQ document, ensuring all modifications align with the iss H3 standards for the MAIN ASSEMBLY JIG COCKPIT.
Bidders are required to adhere to the Quality Assurance protocols established in the defense sector. This includes compliance with the relevant IS standards and engineering guidelines governing the modifications.
Compliance requirements necessitate that all bidders meet the specifications laid out in the tender document, ensuring that all technical, financial, and legal criteria are fulfilled prior to submission.
Yes, bidders are required to submit a performance security as per defined guidelines in the tender document to ensure commitment and successful completion of the project.
Payment terms and conditions are detailed in the tender specifications, highlighting the schedule and conditions under which payments will be made post-delivery and after inspection.
Price evaluation will consider the total bid amount along with adherence to the quality standards and specifications required by the buyer. The evaluation process employs an H1-Highest Priced Bid Elimination approach.
Bids must be submitted electronically through the designated GeM portal by following the submission guidelines set out in the tender. Ensure that all documents are uploaded correctly to prevent disqualification.
Yes, the tender includes provisions that favor Micro, Small, and Medium Enterprises (MSEs), ensuring they have equal opportunities to compete for contracts and benefit from potential exemptions under certain criteria.
The tender is aligned with the 'Make in India' initiative, emphasizing local manufacturing capabilities and encouraging bidders to utilize locally sourced materials wherever feasible.
Detailed information on the evaluation and selection process can be found within the main tender document, which specifies the criteria and process for assessing bidders’ proposals.
Yes, all bidders will receive notifications regarding the evaluation results through the GeM portal, ensuring transparency in the selection process.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS