Indian Army Vest Cotton White S/2 Tender 2025 - EMD ₹33850, Board of Officer Inspection, Advance Sample & Drawings Approval
Indian Army
KANPUR NAGAR, UTTAR PRADESH
Progress
Quantity
18431
Category
7220 000010 COIR
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for safety equipment and related garments (coir/coir alternatives, jackets) in Hisar, Haryana. The tender involves processing Detailed Design Drawings within 5 days of award, with formal Buyer approval or modification lists within another 5 days. An advance sample submission of 8/11 units is required for initial clearance, followed by bulk supply per approved specifications. EMD is ₹27,000 and an option clause allows ±50% quantity changes at contract rates, influencing delivery time. The BOQ lists 5 items across safety apparel and related categories, with an emphasis on adherence to Buyer-approved designs and modification timelines.
Detailed Design Drawings submission within 5 days of award
Advance sample requirement: 8/11 samples within 5 days
Delivery extension formula for option quantity: (additional/original) × Original delivery period with minimum 30 days
Post Receipt Inspection by BOO at consignee site
Advance approval mechanism: buyer approvals or modification list within 5 days
EMD amount: ₹27,000 and submission method per terms
Detailed Design Drawings must be approved by buyer within 5 days
Quantity may vary up to 50% during contract at contracted rates
EMD ₹27,000; payment terms unspecified beyond bid requirements
Delivery period tied to drawing/sample approval; delays due to buyer approvals extend delivery without LD
LD not specified; extensions allowed per approvals and option clause
Experience in supplying safety apparel or related garments
Financial capacity to handle 50% quantity fluctuation
Ability to submit design drawings and advance samples within specified windows
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
KANPUR NAGAR, UTTAR PRADESH
Indian Army
KANPUR NAGAR, UTTAR PRADESH
Indian Army
KANPUR NAGAR, UTTAR PRADESH
Indian Army
KANPUR NAGAR, UTTAR PRADESH
Indian Army
KANPUR NAGAR, UTTAR PRADESH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | 7220 000010 COIR | 7220 000010 COIR | 305 | mtr | lpo312@33adou | 15 |
| 2 | NIV BK COIR | NIV BK COIR | 61 | nos | lpo312@33adou | 15 |
| 3 | 8530 000003 SAFETY | 8530 000003 SAFETY | 17,627 | pkt | lpo312@33adou | 15 |
| 4 | 8405 001579 JACKET COTTON | 8405 001579 JACKET COTTON | 356 | nos | lpo312@33adou | 15 |
| 5 | 8405 000053 DRILL WHITE | 8405 000053 DRILL WHITE | 82 | prs | lpo312@33adou | 15 |
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) Card
Experience Certificates for similar supply of safety equipment or apparel
Financial Statements (last 2-3 years)
EMD submission receipt (₹27,000) via online payment or DD as per tender terms
Technical Bid/Compliance Certificates referencing advanced design drawing capability
OEM Authorization or Manufacturer credentials (if applicable)
Product samples and drawings submission records
Any prior approval documents for design modifications
Key insights about HARYANA tender market
Bidders must submit Detailed Design Drawings within 5 days of award and obtain buyer approval (or modification list) within 5 days. An advance sample (8/11) must be supplied within 5 days for approval. EMD of ₹27,000 is required, and quantity may vary up to 50% at contracted rates.
Submit GST certificate, PAN, experience certificates for similar work, financial statements, EMD receipt, OEM authorizations if applicable, and technical compliance materials. Include design drawings and sample submission records to demonstrate capability for advance approvals.
Submit Detailed Design Drawings within 5 days; buyer will approve or list required modifications within 5 days. Supply must follow the approved drawings, with any modification incorporated before bulk production. Delays in drawings approval extend the delivery period without LD.
8/11 samples must be submitted within 5 days of award. The buyer will approve or specify modifications within 5 days. Non-conformance can lead to rejection; delays in sample approval extend the project timeline without LD.
The purchaser may increase or decrease quantity up to 50% at contract rates. Extended delivery time is computed as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days. If original is under 30 days, extension equals the original period.
Post Receipt Inspection is conducted at the consignee site by BOO; pre-dispatch inspection is not specified. Inspection ensures compliance with contract specifications before acceptance and release of payment.
Indian Army
📍 BARDHAMAN, WEST BENGAL
Indian Army
📍 BARDHAMAN, WEST BENGAL
Indian Army
📍 HISAR, HARYANA
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS