TenderDekho Logo
GEM

Indian Army Detailed Design Drawings Approval Tender for Safety Jackets Coir Apparel in Haryana 2026

Bid Publish Date

25-Feb-2026, 7:51 pm

Bid End Date

07-Mar-2026, 8:00 pm

EMD

₹27,000

Progress

Issue25-Feb-2026, 7:51 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

18431

Category

7220 000010 COIR

Bid Type

Two Packet Bid

Categories 1

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for safety equipment and related garments (coir/coir alternatives, jackets) in Hisar, Haryana. The tender involves processing Detailed Design Drawings within 5 days of award, with formal Buyer approval or modification lists within another 5 days. An advance sample submission of 8/11 units is required for initial clearance, followed by bulk supply per approved specifications. EMD is ₹27,000 and an option clause allows ±50% quantity changes at contract rates, influencing delivery time. The BOQ lists 5 items across safety apparel and related categories, with an emphasis on adherence to Buyer-approved designs and modification timelines.

Technical Specifications & Requirements

  • Detailed Design Drawings: submit for Buyer approval within 5 days of award; approval or modification list provided within 5 days; supply must conform to approved drawings.
  • Advance Sample: submit 8/11 samples within 5 days of award; Buyer to approve or specify modifications within 5 days; supply per approved sample; delays in sample approval extend delivery period without LD.
  • Option Clause: quantity may be increased/decreased up to 50% at contract rates; additional time calculated as (additional/original) × original delivery period, with minimum of 30 days; extension allowed up to original delivery period.
  • Inspection: Post Receipt Inspection at consignee site; BOO designated as inspecting agency; pre-dispatch not specified.
  • Sampling/Deviation: major deviations may lead to buyer rejection; supply must align with contract specifications.
  • Delivery Schedule: delivery timelines shift with drawing/sample approval delays; no LD for Buyer delays in approvals.
  • Product categories: safety equipment and jackets under specified category codes; exact itemization not disclosed.

Terms, Conditions & Eligibility

  • EMD: ₹27,000; payable per tender terms.
  • Drawings approval: 5-day window for submission, 5-day for approval or modification list; supply aligned to approved drawings.
  • Sample approval: 8/11 samples required; 5-day approval window; delays extend delivery period; non-conformance may lead to rejection.
  • Option clause: quantity variation up to 50%; extended delivery period calculation with minimum 30 days.
  • Inspection: Post Receipt Inspection at consignee site; BOO as inspecting agency; pre-dispatch inspection not specified.
  • Delivery: extension rules tied to buyer approvals; LD penalties not specified when delays are buyer-caused.
  • Documentation: standard tender submissions including GST, PAN, and relevant certifications as implied by T&C; exact list not enumerated.

Key Specifications

  • Detailed Design Drawings submission within 5 days of award

  • Advance sample requirement: 8/11 samples within 5 days

  • Delivery extension formula for option quantity: (additional/original) × Original delivery period with minimum 30 days

  • Post Receipt Inspection by BOO at consignee site

  • Advance approval mechanism: buyer approvals or modification list within 5 days

Terms & Conditions

  • EMD amount: ₹27,000 and submission method per terms

  • Detailed Design Drawings must be approved by buyer within 5 days

  • Quantity may vary up to 50% during contract at contracted rates

Important Clauses

Payment Terms

EMD ₹27,000; payment terms unspecified beyond bid requirements

Delivery Schedule

Delivery period tied to drawing/sample approval; delays due to buyer approvals extend delivery without LD

Penalties/Liquidated Damages

LD not specified; extensions allowed per approvals and option clause

Bidder Eligibility

  • Experience in supplying safety apparel or related garments

  • Financial capacity to handle 50% quantity fluctuation

  • Ability to submit design drawings and advance samples within specified windows

Documents 5

GeM-Bidding-9046838.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Indian Army Vest Cotton White S/2 Tender 2025 - EMD ₹33850, Board of Officer Inspection, Advance Sample & Drawings Approval

Indian Army

KANPUR NAGAR, UTTAR PRADESH

Posted: 21 December 2025
Closed: 31 December 2025
GEM

CC2-10310207, 8440-000005, Vest Cotton White S/3

Indian Army

KANPUR NAGAR, UTTAR PRADESH

Posted: 17 October 2025
Closed: 27 October 2025
GEM

Indian Army Vest Cotton White S/3 Tender 2026 Department of Military Affairs Rajasthan - ISI/AAA/TRTL Standards 2026

Indian Army

KANPUR NAGAR, UTTAR PRADESH

Posted: 18 January 2026
Closed: 28 January 2026
GEM

CC2, 10310119, 8420-000004, Drawer Cotton Short White S/4

Indian Army

KANPUR NAGAR, UTTAR PRADESH

Posted: 16 September 2025
Closed: 26 September 2025
GEM

CC2-10310119, 8420-000004, Drawer Cotton Short White S/4

Indian Army

KANPUR NAGAR, UTTAR PRADESH

Posted: 3 February 2025
Closed: 25 February 2025
GEM

Bill of Quantities (BOQ) 5 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 7220 000010 COIR 7220 000010 COIR 305 mtr lpo312@33adou 15
2 NIV BK COIR NIV BK COIR 61 nos lpo312@33adou 15
3 8530 000003 SAFETY 8530 000003 SAFETY 17,627 pkt lpo312@33adou 15
4 8405 001579 JACKET COTTON 8405 001579 JACKET COTTON 356 nos lpo312@33adou 15
5 8405 000053 DRILL WHITE 8405 000053 DRILL WHITE 82 prs lpo312@33adou 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN) Card

3

Experience Certificates for similar supply of safety equipment or apparel

4

Financial Statements (last 2-3 years)

5

EMD submission receipt (₹27,000) via online payment or DD as per tender terms

6

Technical Bid/Compliance Certificates referencing advanced design drawing capability

7

OEM Authorization or Manufacturer credentials (if applicable)

8

Product samples and drawings submission records

9

Any prior approval documents for design modifications

Frequently Asked Questions

Key insights about HARYANA tender market

How to bid in Indian Army safety equipment tender in Hisar?

Bidders must submit Detailed Design Drawings within 5 days of award and obtain buyer approval (or modification list) within 5 days. An advance sample (8/11) must be supplied within 5 days for approval. EMD of ₹27,000 is required, and quantity may vary up to 50% at contracted rates.

What documents are required for Army safety jacket tender in Haryana?

Submit GST certificate, PAN, experience certificates for similar work, financial statements, EMD receipt, OEM authorizations if applicable, and technical compliance materials. Include design drawings and sample submission records to demonstrate capability for advance approvals.

What are the key technical requirements for Army draws approval?

Submit Detailed Design Drawings within 5 days; buyer will approve or list required modifications within 5 days. Supply must follow the approved drawings, with any modification incorporated before bulk production. Delays in drawings approval extend the delivery period without LD.

When is the advance sample required for Army tender in Hisar?

8/11 samples must be submitted within 5 days of award. The buyer will approve or specify modifications within 5 days. Non-conformance can lead to rejection; delays in sample approval extend the project timeline without LD.

How does the 50% quantity option affect delivery timelines?

The purchaser may increase or decrease quantity up to 50% at contract rates. Extended delivery time is computed as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days. If original is under 30 days, extension equals the original period.

What is the inspection process for Army stores in this tender?

Post Receipt Inspection is conducted at the consignee site by BOO; pre-dispatch inspection is not specified. Inspection ensures compliance with contract specifications before acceptance and release of payment.

Similar Tenders

3 found
Urgent

7220-000082 Matting Rubber,8010-000129 Thinner,3439-000007 Elect Welding Rod,8040-000008 Fevicol SR

Indian Army

📍 BARDHAMAN, WEST BENGAL

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

9520-000001 Steel Angle,NK000161 MS Pipe,NK000162 MS Pipe,30631 Sheet Cellular,8010-000248 Paint RF

Indian Army

📍 BARDHAMAN, WEST BENGAL

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

3510 000045 LAUNDRY TAILOR,7210 000069 BEDDING PROOF,KND NIV CL PV DD,7210 000007 BARRACK,8305 0003

Indian Army

📍 HISAR, HARYANA

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM