TenderDekho Logo
Active GEM

Open Tender for PLB PIPE,96 F OPTICAL FIBRE CABLE,DWC PIPES,RCC CHAMBERS,RCC ROUTE JOINT INDICATORS,PLB PUSH FIT CO in VISAKHAPATNAM, ANDHRA PRADESH

Bid Publish Date

03-Oct-2026, 2:39 pm

Bid End Date

26-Oct-2026, 2:00 pm

EMD

₹2,46,000

Progress

Issue03-Oct-2026, 2:39 pm
Corrigendum07-Oct-2026
AwardPending

A tender has been published for Indian Navy PLB PIPE, 96 F OPTICAL FIBRE CABLE, DWC PIPES, RCC CHAMBERS, RCC ROUTE JOINT INDICATORS, PLB PUSH FIT COUPLERS, UJC 96F, FTB 96F, FDMS SD TYPE, PIG TAILS- SC PIGTAIL, PATCH CHORDS 20 MTS SC TO SC PIG TAIL, INSULATION TAPES, 20 MM HOSE PIPE, CABLE TIES TAPES MISC, CAUSION TAPE, TRENCHING COST BASED ON THE SOIL, PIPE LAYING CHARGE, CEMENT CONCRETE, CABLE PULLING BLOWING, DWC LAYING CHARGES, LABOUR CHARGES FOR TESTING AND SPLICING, DISTRIBUTION OF STORES TO ROUTES, LOADING AND UNLOADING CHARGES, UNFORESEEN, CORAL MAKE IRIS IVDX CLOUD SERVER, CORAL MAKE 192 PORT MEDIA GATEWAY, IP PHONE MODEL NO GRP 2604, D LINK 10 100 1000 GIGA SWITCH 24 PORT NETWORK, D-LINK CAT 6 ETHERNET LAN CABLE, D-LINK SINGLE PLATE IO MODULES, D-LINK 3 MTRS LENGTH PATCH CARDS, 6-F OFC SM ARMORED CABLE FINOLEX MAKE, D- LINK 4 U RACK WITH ACCESSORIES, COST OF 40 MM PLB DUCT FOR FIBRE LAYING, LC-LC FIBRE PATCH CARDS 3 MTRS LENGTH, D-LINK 12 U RACK WITH ACCESSORIES, DIGGING OF THE CABLE TRENCHANING, OFC CABLE LAYING CHARGES BY USING PLB DUCT, ETHERNET LAN CABLE LAYING CHARGES, 100 PAIR FIBER JUNCTION BOXES WITH GE KRONE MODULES, 500- PAIR JUNCTION BOX WITH GE KRONE MODULES, JUMPER CABLE 500 MTRS EACH COIL, BEETEL M500 CLI WITH SPEAKER ANALOG TELEPHONE, SERVER AND GATEWAY INSTALLATION in VISAKHAPATNAM, ANDHRA PRADESH. Quantity: 12367 by. Submission Deadline: 26-10-2026 14: 00: 00. Check eligibility and apply.

Advertisement

Tender Data

Bid Details

Quantity

12367

Category

96 F OPTICAL FIBRE CABLE

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

25

OEM Avg. Turnover

25

Past Performance

30 %

Warranty Period

2 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

PLB PIPE , 96 F OPTICAL FIBRE CABLE , DWC PIPES , RCC CHAMBERS , RCC ROUTE JOINT INDICATORS , PLB PUSH FIT COUPLERS , UJC 96F , FTB 96F , FDMS SD TYPE , PIG TAILS- SC PIGTAIL , PATCH CHORDS 20 MTS SC TO SC PIG TAIL , INSULATION TAPES , 20 MM HOSE PIPE , CABLE TIES TAPES MISC , CAUSION TAPE , TRENCHING COST BASED ON THE SOIL , PIPE LAYING CHARGE , CEMENT CONCRETE , CABLE PULLING BLOWING , DWC LAYING CHARGES , LABOUR CHARGES FOR TESTING AND SPLICING , DISTRIBUTION OF STORES TO ROUTES , LOADING AND UNLOADING CHARGES , UNFORESEEN , CORAL MAKE IRIS IVDX CLOUD SERVER , CORAL MAKE 192 PORT MEDIA GATEWAY , IP PHONE MODEL NO GRP 2604 , D LINK 10 100 1000 GIGA SWITCH 24 PORT NETWORK , D-LINK CAT 6 ETHERNET LAN CABLE , D-LINK SINGLE PLATE IO MODULES , D-LINK 3 MTRS LENGTH PATCH CARDS , 6-F OFC SM ARMORED CABLE FINOLEX MAKE , D- LINK 4 U RACK WITH ACCESSORIES , COST OF 40 MM PLB DUCT FOR FIBRE LAYING , LC-LC FIBRE PATCH CARDS 3 MTRS LENGTH , D-LINK 12 U RACK WITH ACCESSORIES , DIGGING OF THE CABLE TRENCHANING , OFC CABLE LAYING CHARGES BY USING PLB DUCT , ETHERNET LAN CABLE LAYING CHARGES , 100 PAIR FIBER JUNCTION BOXES WITH GE KRONE MODULES , 500- PAIR JUNCTION BOX WITH GE KRONE MODULES , JUMPER CABLE 500 MTRS EACH COIL , BEETEL M500 CLI WITH SPEAKER ANALOG TELEPHONE , SERVER AND GATEWAY INSTALLATION

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

26

Pre-Bid & Qualification

Pre-Bid Date

14-10-2026 15:00:00

Pre-Bid Venue

NAVAL SELECTION BOARD VISAKHAPATNAM 530008

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Visakhapatnam

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-VisakhapatnamVisakhapatnam--730-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9979553.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Navy

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Corrigendum Updates

2 Updates
#1

Update

07-Oct-2026
#2

Update

05-Oct-2026
Advertisement

Bill of Quantities (BOQ) 44 Items Sign in for GEM prices

#1

PLB PIPE

PLB PIPE 40MM DIA

7 km Delivery: 30 days
#2

96 F OPTICAL FIBRE CABLE

96 F OPTICAL FIBRE CABLE

7 km Delivery: 30 days
#3

DWC PIPES

DWC PIPES

300 mtr Delivery: 30 days
#4

RCC CHAMBERS

RCC CHAMBERS

34 nos Delivery: 30 days
#5

RCC ROUTE JOINT INDICATORS

RCC ROUTE JOINT INDICATORS

37 nos Delivery: 30 days
#6

PLB PUSH FIT COUPLERS

PLB PUSH FIT COUPLERS

37 nos Delivery: 30 days
#7

UJC 96F

UJC 96F

6 nos Delivery: 30 days
#8

FTB 96F

FTB 96F

4 nos Delivery: 30 days
#9

FDMS SD TYPE

FDMS SD TYPE

4 nos Delivery: 30 days
#10

PIG TAILS- SC PIGTAIL

PIG TAILS SC PIGTAIL

384 nos Delivery: 30 days
#11

PATCH CHORDS 20 MTS SC TO SC PIG TAIL

PATCH CHORDS 20 MTS SC TO SC PIG TAIL

384 nos Delivery: 30 days
#12

INSULATION TAPES

INSULATION TAPES

10 nos Delivery: 30 days
#13

20 MM HOSE PIPE

20 MM HOSE PIPE

100 mtr Delivery: 30 days
#14

CABLE TIES TAPES MISC

CABLE TIES TAPES MISC

20 nos Delivery: 30 days
#15

CAUSION TAPE

CAUSION TAPE

700 mtr Delivery: 30 days
#16

TRENCHING COST BASED ON THE SOIL

TRENCHING COST BASED ON THE SOIL

1 job Delivery: 30 days
#17

PIPE LAYING CHARGE

PIPE LAYING CHARGE

1 job Delivery: 30 days
#18

CEMENT CONCRETE

CEMENT CONCRETE IN 1 IS TO 2 IS TO 4

1 job Delivery: 30 days
#19

CABLE PULLING BLOWING

CABLE PULLING BLOWING

1 job Delivery: 30 days
#20

DWC LAYING CHARGES

DWC LAYING CHARGES

1 job Delivery: 30 days
#21

LABOUR CHARGES FOR TESTING AND SPLICING

LABOUR CHARGES FOR TESTING AND SPLICING

1 job Delivery: 30 days
#22

DISTRIBUTION OF STORES TO ROUTES

DISTRIBUTION OF STORES TO ROUTES

1 job Delivery: 30 days
#23

LOADING AND UNLOADING CHARGES

LOADING AND UNLOADING CHARGES

1 job Delivery: 30 days
#24

UNFORESEEN

UNFORESEEN

1 job Delivery: 30 days
#25

CORAL MAKE IRIS IVDX CLOUD SERVER

CORAL MAKE IRIS IVDX CLOUD SERVER WITH 500 USER LICENSE

1 nos Delivery: 30 days
#26

CORAL MAKE 192 PORT MEDIA GATEWAY

CORAL MAKE 192 PORT MEDIA GATEWAY

1 nos Delivery: 30 days
#27

IP PHONE MODEL NO GRP 2604

IP PHONE MODEL NO GRP 2604

25 nos Delivery: 30 days
#28

D LINK 10 100 1000 GIGA SWITCH 24 PORT NETWORK

D-LINK 10 100 1000 GIGA SWITCH 24 PORT NETWORK

8 nos Delivery: 30 days
#29

D-LINK CAT 6 ETHERNET LAN CABLE

D-LINK CAT 6 ETHERNET LAN CABLE

12 coils Delivery: 30 days
#30

D-LINK SINGLE PLATE IO MODULES

D-LINK SINGLE PLATE IO MODULES

150 nos Delivery: 30 days
#31

D-LINK 3 MTRS LENGTH PATCH CARDS

D-LINK 3 MTRS LENGTH PATCH CARDS

25 nos Delivery: 30 days
#32

6-F OFC SM ARMORED CABLE FINOLEX MAKE

6-F OFC SM ARMORED CABLE FINOLEX MAKE

2,000 mtr Delivery: 30 days
#33

D-LINK 4 U RACK WITH ACCESSORIES

D-LINK 4 U RACK WITH ACCESSORIES

8 nos Delivery: 30 days
#34

COST OF 40 MM PLB DUCT FOR FIBRE LAYING

COST OF 40 MM PLB DUCT FOR FIBRE LAYING

2,000 mtr Delivery: 30 days
#35

LC-LC FIBRE PATCH CARDS 3 MTRS LENGTH

LC-LC FIBRE PATCH CARDS 3 MTRS LENGTH

16 nos Delivery: 30 days
#36

D-LINK 12 U RACK WITH ACCESSORIES

D-LINK 12 U RACK WITH ACCESSORIES

1 nos Delivery: 30 days
#37

DIGGING OF THE CABLE TRENCHANING

DIGGING OF THE CABLE TRENCHANING REFILLING THE SAME AFTER CABLE LAID

1,500 mtr Delivery: 30 days
#38

OFC CABLE LAYING CHARGES BY USING PLB DUCT

OFC CABLE LAYING CHARGES BY USING PLB DUCT

2,000 mtr Delivery: 30 days
#39

ETHERNET LAN CABLE LAYING CHARGES

ETHERNET LAN CABLE LAYING CHARGES IN USING OF PVC CABLE DUCT

2,440 mtr Delivery: 30 days
#40

100 PAIR FIBER JUNCTION BOXES WITH GE KRONE MODULES

100 PAIR FIBER JUNCTION BOXES WITH GE KRONE MODULES

8 nos Delivery: 30 days
#41

500- PAIR JUNCTION BOX WITH GE KRONE MODULES

500- PAIR JUNCTION BOX WITH GE KRONE MODULES

1 nos Delivery: 30 days
#42

JUMPER CABLE 500 MTRS EACH COIL

JUMPER CABLE 500 MTRS EACH COIL

2 coils Delivery: 30 days
#43

BEETEL M500 CLI WITH SPEAKER ANALOG TELEPHONE

BEETEL M500 CLI WITH SPEAKER ANALOG TELEPHONE

125 nos Delivery: 30 days
#44

SERVER AND GATEWAY INSTALLATION

SERVER AND GATEWAY INSTALLATION

1 job Delivery: 30 days

Categories 73

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement