TenderDekho Logo
Active GEM

Procurement Opportunity: Inflatable Tent in RI BHOI, MEGHALAYA

Bid Publish Date

30-Jul-2026, 4:33 pm

Bid End Date

03-Aug-2026, 5:00 pm

Location

RI BHOI , MEGHALAYA

Progress

Issue30-Jul-2026, 4:33 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

2

Bid Type

Two Packet Bid

Categories 1

Public procurement opportunity for Indian Army Inflatable Tent (Q3) in RI BHOI, MEGHALAYA. Quantity: 2 issued by. Submission Deadline: 03-08-2026 17: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Inflatable Tent (Q3)

Delivery Details

Max Delivery Days

50

Delivery Locations

1

Delivery Cities

Ri Bhoi

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-Ri BhoiRi Bhoi--250-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9685815.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
GENERIC Tent size (outer side dimension of the tent) (Length X Width X Height at ridge X Minimum Diameter of the inflatable arc) 14 Feet X 10 Feet X 7 feet X 28 Cm
GENERIC Tent structure Two doors and four windows – doors and windows can be rolled up (if required) and are equipped with a mosquito net – the door and window closing mechanism will be fitted with heavy duty nylon zips and Velcro taps (for tent 24 feet length)
GENERIC Design/drawing of inflatable tent As per drawing – uploaded at GeM drawing (for 24 feet length)
GENERIC Maximum time required for complete erection of tent 10 to 12 minutes with the help of two persons (for 24 feet length)
GENERIC Each tent supplied with 10 numbers MS pegs –12 numbers Polyester rope (3.5 mtr each) – 8 numbers. Aluminium pipes – electric air blower – foot pump – hammer – repair kit for the stability of the inflated tent during torrential rain and thunderstorm (for 14 feet length)
GENERIC Structure design (tent frame and tent skin) NOTE : ARCHES WILL BE PERMANENTLY ATTACHED TO THE TENT COVER AND FLOOR Three numbers of individual inflatable air chambers (arch) made out of one side hypalon coated polyester fabric and inside neoprene coated having minimum 1000 GSM ± 50 GSM and the canopy will be one sided PU coated polyester fabric and the floor fabric will be both sides PVC coated polyester fabric (for 14 feet length)
MATERIAL Tent frame material One side hypalon coated polyester fabric and inside neoprene coated having minimum 1000 GSM ± 50 GSM (for 14 feet length)
ACCESSORIES MATERIAL Aluminium pipes 12 numbers Pipe having length of 1.7 mtr to 1.8 mtr – Outer dia 31 mm minimum with 2 mm Wall thickness(for 24 feet length)
ACCESSORIES MATERIAL MS peg 12 numbers having 300 mm length with 18 mm dia conforming to IS 1875 – latest (for 24 feet length)
ACCESSORIES MATERIAL Foot pump 2 numbers (for 24 feet length)
PACKING Total weight of product (including packing accessories) 90 Kgs (for 24 feet length)
WARRANTY AND GUARANTY Guaranty certificate will be provided along with each tent Yes
CERTIFICATION Tensile strength of the arch fabric in warp direction 395 Kgs minimum (for 24 feet length)
CERTIFICATION Tensile strength of the arch fabric in weft direction 395 Kgs minimum (for 24 feet length)

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Explore More Opportunities

Quick Access