Bid Publish Date
30-Jul-2026, 11:00 am
Bid End Date
10-Aug-2026, 11:00 am
Location
Progress
Quantity
12
Bid Type
Two Packet Bid
The Indian Army under the Department Of Military Affairs invites bids for a Plate Carrier Kit. The tender contemplates a quantity adjustment clause allowing up to 25% increase in bid quantity at contract award and during the currency at contracted rates. The successful bidder must obtain Detailed Design Drawings approval within 5 days of award, with a 7-day window for buyer modification feedback. The supplier must ensure supply as per approved drawings without LD for drawing delays. The procurement requires bidders with proven experience supplying to central/state governments or PSUs for at least 3 years. The data sheet must align with product specifications, and a robust financial standing is essential.
Product: Plate Carrier Kit
Experience: 3 years govt/PSU supply history
Design: Detailed Design Drawings within 5 days of award; 7 days for buyer feedback
Delivery: Option to increase quantity up to 25%; delivery period adjusts accordingly with minimum 30 days
Documentation: Data Sheet alignment with offered product; EFT Mandate
Vendor prerequisites: PAN, GSTIN, Cancelled Cheque, bank-certified EFT mandate
Quantity adjustment up to 25% during contract
Approval of Detailed Design Drawings within 5 days of award
3 years govt/PSU supply experience required
Not explicitly defined in the tender; ensure alignment with approved drawings and delivery milestones per contract.
Delivery period may extend with option quantity; additional time = (Increased quantity / Original quantity) × Original delivery period, min 30 days.
LD not specified; delivery delays tied to approval timing; LD terms to be clarified during contract finalization.
3+ years regular govt/PSU supply experience for Plate Carrier or similar protective gear
No liquidation, bankruptcy, or court receivership status
Ability to submit Data Sheet and OEM authorizations; GSTIN and PAN validation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Plate Carrier Kit
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Chamba
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Chamba | Chamba | - | - | 12 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate certified by Bank
Data Sheet of offered product
Evidence of 3+ years govt/PSU supply experience (contracts and performance proofs)
OEM authorization (if applicable) and vendor code creation documents
Financial statements or undertakings proving non-liquidation status
Key insights about HIMACHAL PRADESH tender market
Bidders must submit PAN, GSTIN, Cancelled Cheque, EFT Mandate, and Data Sheet matching the offered Plate Carrier Kit. Ensure 3+ years govt/PSU supply experience and OEM authorization if required. Prepare Detailed Design Drawings within 5 days of award and address buyer feedback within 7 days to avoid delivery delays.
Required documents include PAN, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, Data Sheet of the offered Plate Carrier Kit, evidence of 3+ years govt/PSU experience, and OEM authorizations if applicable. Data Sheet must align with product specs to prevent rejection.
The purchaser reserves right to increase or decrease quantity up to 25% of bid quantity at contract placement and during the currency at contracted rates. Additional time shall be calculated proportionally with a minimum of 30 days.
Successful Bidder must submit Detailed Design Drawings within 5 days of award; Buyer will approve or provide a modification list within 7 days. Supply must follow approved drawings; delay in approval extends delivery period without LD.
Eligibility requires regular manufacture and supply of the same/similar category products to Central/State Govt Organisations or PSUs for at least 3 years prior to bid opening. Copies of contracts should be provided for each year.
Yes, bidders may supply directly or through resellers; OEM authorization is required when applicable. Ensure Data Sheet matches offered product and obtain vendor code creation documents as per terms.
Delivery depends on the original delivery period; if the option quantity is exercised, the extended period is (Increased quantity / Original quantity) × Original delivery period, with a minimum 30 days added, and no LD applies for buyer drawing approval delays.
The Data Sheet must accurately reflect offered Plate Carrier Kit specifications; any mismatch triggers bid rejection. Align all technical parameters with the tender’s expected standards and provide product-level details for buyer verification.
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS