TenderDekho Logo
GEM

Indian Army Department of Military Affairs Timing Belt, Vacuum Hose for EGR, Cam Oil Seal, Condenser Assembly Tender 2025

Bid Publish Date

01-Nov-2025, 10:43 am

Bid End Date

14-Nov-2025, 11:00 am

Latest Corrigendum Available

Progress

Issue01-Nov-2025, 10:43 am
Technical14-11-2025 10:27:44
Financial
AwardCompleted
Explore all 3 tabs to view complete tender details

Quantity

7

Key Highlights

  • Organization requires automotive spare parts including timing belt and EGR vacuum hose for Indian Army procurement
  • Option clause allows +/-25% quantity variation during and within currency, with calculated delivery extensions
  • Delivery extension calculation formula: (additional quantity ÷ original quantity) × original delivery period, minimum 30 days
  • ATC terms are provided by the buyer; no explicit technical specs or quantities in BOQ surfaced
  • No explicit EMD amount, payment terms, or warranty details in the provided data
  • 7 BOQ items listed with N/A quantities/usages; indicates data incompleteness requiring ATC verification
  • Specific brand/OEM requirements or IS/ISO standards are not listed in the tender data

Categories 13

Tender Overview

Organization: Indian Army, Department Of Military Affairs. Product/Service: procurement of automotive spares including timing belt, vacuum hose for EGR, cam oil seal, condenser assembly, electric fan assembly, rear suspension bush, and repair kit brake chamber. Location: not specified; indicative national-level defense procurement. Quantity/Estimated Value: not disclosed; BOQ lists 7 items with no quantities or units. Timeline: delivery terms exist in the ATC, but no start/end dates are provided. A key differentiator is the option clause permitting ±25% quantity adjustments during and after the contract, with delivery extensions computed as (additional quantity ÷ original quantity) × original delivery period, minimum 30 days. This clause provides flexibility for demand fluctuations within contract rates. Unique aspect: governing ATC document referenced; no technical specs published in tender data.

Technical Specifications & Requirements

  • BoQ items: 7 entries; all items show as N/A for quantity and unit, implying no explicit technical specs in the provided data.
  • Item scope: automotive spares across multiple sub-assemblies (timing belt, vacuum hose, seals, condenser, fan, suspension bush, brake kit).
  • EMD/price band: not specified in the accessible data.
  • Delivery/Installation: governed by option clause; calculated extension formula with minimum 30 days; original delivery period not disclosed.
  • Standards/Certifications: no standards listed in tender data.
  • Quality/Testing: not specified.
  • Special terms: ATC/Dummy terms uploaded; bidders must comply with option-based delivery adjustments.

Terms, Conditions & Eligibility

  • EMD: amount not disclosed in the provided data.
  • Experience/Turnover: not specified.
  • Delivery timeline: not fixed; delivery period may be extended per option clause with a minimum 30 days if quantities change.
  • Payment terms: not disclosed.
  • Documents required: not clearly enumerated in the accessible data; ATC document referenced.
  • Warranty/Penalties: not specified.
  • Other conditions: bidders must adhere to the 25% quantity variation and extension policy; the delivery period is linked to the last date of the original delivery order.

Key Specifications

  • Product/service names: timing belt, vacuum hose for EGR, cam oil seal, condenser assembly, electric fan assembly, rear suspension bush, brake chamber repair kit

  • Quantities/volume: not disclosed in BOQ (N/A for all items)

  • EMD/Estimated value: not disclosed in tender data

  • Experience requirements: not disclosed; refer to ATC for specifics

  • Quality/standards: none listed; verify IS/ISO requirements in ATC

  • Delivery: governed by option clause; 25% quantity variation with calculated extension >=30 days

Terms & Conditions

  • Option to increase/decrease quantity up to 25% during contract and currency

  • Delivery period calculations tied to original delivery order date with minimum 30 days

  • ATC document governs all terms; bidders must comply with option clause and submit required documents

Important Clauses

Payment Terms

Not specified in available data; verify in ATC document

Delivery Schedule

Delivery period linked to original order date; extended period depends on quantity variation under option clause

Penalties/Liquidated Damages

Not specified in provided data; check ATC for LD/penalty provisions

Bidder Eligibility

  • Submit GST and PAN

  • Prove experience in supplying automotive spare parts for defense entities

  • Demonstrate financial viability with recent statements and turnover

Documents 5

GeM-Bidding-8537117.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Indian Army Automotive Spares Tender Speedometer Assembly to Hose Pipe 2025

Indian Army

ALLAHABAD, UTTAR PRADESH

Posted: 24 December 2025
Closed: 3 January 2026
GEM

ASSY RADIATOR PIPE WITH HOSE,BRAKE SHOE ASSY REAR,AIR COMPRESSOR REPAIR KIT,CE BUSH,OIL SEAL,ARMATU

Indian Army

Rangareddi, TELANGANA

Posted: 8 May 2025
Closed: 29 May 2025
GEM

Timing Belt,Rear Bush Kit,Brake Shoe Rear,Accelerator Cable,Oil Seal

Indian Army

KUPWARA, JAMMU & KASHMIR

Posted: 11 January 2025
Closed: 1 February 2025
GEM

belt timing,suspension bush,bulb turn signal 12v21w,air filter element,air dryer repair kit,wiper g

Indian Army

JALPAIGURI, WEST BENGAL

Posted: 12 February 2026
Closed: 23 February 2026
GEM

Armed Forces Tribunal Defence Procurement Tender for Belts, Hoses, Filters 2026

Armed Forces Tribunal

BARAMULLA, JAMMU & KASHMIR

Posted: 14 February 2026
Closed: 24 February 2026
GEM

Bill of Quantities (BOQ) 7 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Timing Belt SAFARI 1 nos qmclk@847 15
2 Vacuum Hose for EGR SAFARI 1 nos qmclk@847 15
3 Cam Oil Seal SAFARI 1 nos qmclk@847 15
4 Condenser Assy SAFARI 1 nos qmclk@847 15
5 Elect Fan Assy SAFARI 1 nos qmclk@847 15
6 Rear Suspension Bush SAFARI 1 nos qmclk@847 15
7 Repair Kit Brake Chamber ALS 1 nos qmclk@847 15

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar automotive spare part supply

4

Financial statements / turnover documentation

5

EMD submission proof (amount not disclosed in data)

6

Technical bid documents demonstrating compliance with referenced ATC terms

7

OEM authorisation letters (if bidding as an authorized distributor)

8

Any mandatory compliance certificates referenced in the ATC document

Corrigendum Updates

1 Update
#1

Update

11-Nov-2025

Extended Deadline

14-Nov-2025, 11:00 am

Opening Date

14-Nov-2025, 11:30 am

Technical Results

S.No Seller Item Date Status
1DIPIKA ENTERPRISES   Under PMA-14-11-2025 10:27:44Qualified
2GOVIND MOTORS   Under PMA-12-11-2025 19:27:16Qualified
3Shree Jee Enterprises   Under PMA-14-11-2025 10:33:08Qualified

Financial Results

Rank Seller Price Item
L1DIPIKA ENTERPRISES(MSE)( MSE Social Category:General )    Under PMA₹39,670Item Categories : Timing Belt,Vacuum Hose for EGR,Cam Oil Seal,Condenser Assy,Elect Fan Assy,Rear Suspension Bush,Rep
L2GOVIND MOTORS (MSE)( MSE Social Category:General )    Under PMA₹45,250Item Categories : Timing Belt,Vacuum Hose for EGR,Cam Oil Seal,Condenser Assy,Elect Fan Assy,Rear Suspension Bush,Rep
L3Shree Jee Enterprises (MSE)( MSE Social Category:General )    Under PMA₹54,480Item Categories : Timing Belt,Vacuum Hose for EGR,Cam Oil Seal,Condenser Assy,Elect Fan Assy,Rear Suspension Bush,Rep

Frequently Asked Questions

Key insights about ARUNACHAL PRADESH tender market

How to bid on the Indian Army timing belt tender 2025?

Bidders should prepare GST registration, PAN, experience certificates for automotive spares, and financial statements. The ATC outlines a 25% quantity variation right and a delivery extension rule. Ensure submission of OEM authorisations and technical bids aligned with the referenced ATC. Verify EMD amount in the bid documents.

What documents are required for the Indian Army automotive spares bid 2025?

Required documents include GST certificate, PAN, experience certificates for similar supply, financial statements, EMD submission proof, technical bid documents, OEM authorisations, and any compliance certificates specified in the ATC. Ensure all documents are current and digitally verifiable for bid submission.

What are the delivery terms for the defense spare parts tender 2025?

Delivery terms follow the option clause: quantity may vary up to 25% during or after contract, with delivery extension calculated as (additional quantity ÷ original quantity) × original delivery period, minimum 30 days. No fixed delivery schedule is published; confirm through ATC and order placement.

Which automotive items are covered in this Indian Army tender 2025?

Items include timing belt, vacuum hose for EGR, cam oil seal, condenser assembly, electric fan assembly, rear suspension bush, and brake chamber repair kit. Specific quantities and units are not disclosed in the BOQ and require ATC clarification before bidding.

What standards or certifications are required for Indian Army automotive spares?

The tender data does not list explicit standards. Verify in the ATC for any IS/ISO compliance, OEM requirements, or certification mandates. Align product specifications and tests to any referenced standards before submission.

How is the EMD amount determined for this procurement?

The accessible data does not reveal the EMD amount. Bidders should consult the ATC document to obtain the exact EMD value, payment method, and validity period, and prepare to submit proof with the bid.

What is the eligibility for defense sector suppliers to participate in 2025 bids?

Eligibility requires relevant experience in automotive spares supply, financial solvency, and compliance with procurement terms in the ATC. OEM authorisation and prior defense sector experience can strengthen bid viability; ensure all required documents are included.

When will the Indian Army bid be opened and evaluated?

Bid opening and evaluation dates are not provided in the data. Refer to the ATC and tender portal notifications for exact timelines, as these are typically published alongside bid submission windows and addenda.