Progress
The Bihar State Police – Home Department Bihar invites bids for a gym equipment package comprising a Squat Rack (Version 2), a Multi Adjustable Bench (Version 2), and a 45 degree Leg Press or Hack Squat Machine (Version 3) within the Q3 category. The listed items are intended for a police training facility in Bihar, with quantities to be confirmed at contract award. The procurement focuses on standardized gym hardware suitable for high-usage environments and is structured to allow quantity adjustments up to 25% at the purchaser’s discretion, at contracted rates. The absence of BOQ items suggests a flexible, equipment-based purchase with bidder-provided configurations meeting specified standards. Unique terms center on optioned quantity expansion and extended delivery windows, ensuring supply continuity during contract execution. This tender emphasizes robust, safe, and durable strength-training machines aligned with police fitness programs. Vendors should prepare for equipment delivery and installation at the specified Bihar location once issued, with compliance to delivery-time calculations under the option clause. Specific brand or model details are to be determined by the final order, while the core scope remains clearly defined by the three accommodation-ready machines. All participating suppliers should consider the potential for quantity variation and plan logistics accordingly.
Squat Rack (Version 2) – load rating and safety bar features to be clarified in ATC
Multi Adjustable Bench (Version 2) – adjustable incline/decline ranges and weight capacity
45 degree Leg Press or Hack Squat Machine (Version 3) – knee-ankle joint mechanics and user weight limits
25% quantity variation rights with contracted rates
Delivery period adjustments per option clause with minimum 30 days
EMD and payment terms to be confirmed in ATC
Payment terms to be clarified in ATC; expect standard government conduit arrangements
Delivery window adjustable via option clause; minimum extension baseline 30 days
Penalties to be defined in ATC; ensure compliance with delivery deadlines and quality acceptance
Experience in supplying gym equipment for government or police facilities
Financial capacity to support upfront cost and delivery logistics
Manufacturer authorization or OEM access for specified equipment (if required)
Quantity
3
Category
Squats Rack (Version 2)
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
25
OEM Avg. Turnover
20
Past Performance
10 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Squats Rack (Version 2) (Q3) , Multi Adjustable Bench (V2) (Q3) , 45 degree Leg Press or Hack Squat Machine (Q3)
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Bhagalpur
Delivery Pincodes
812001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Anup Kumar | 812001,Director, RFSL, Bhagalpur. | Bhagalpur | Bihar | 812001 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar gym equipment supply
Financial statements for last 2-3 years
EMD submission document (exact amount per ATC)
Technical bid documents showing equipment specifications
OEM authorization or dealership certificates (if applicable)
Any safety/quality certifications relevant to gym equipment
Key insights about BIHAR tender market
Bidders should review the ATC for exact EMD, delivery terms, and required documents. Prepare GST, PAN, experience certificates, financial statements, OEM authorizations, and technical bids showing squat rack, adjustable bench, and leg press specs. Ensure 25% quantity flexibility is planned in contract risk assessment.
Submit GST registration, PAN card, last 3 years financial statements, experience certificates for similar police gym equipment, EMD submission details, technical compliance certificates, and OEM authorization if applicable. Include installation/service capability statements and any safety certifications with the bid.
Specifications cover Version 2 squat rack and Version 2 adjustable bench with safety features and robust steel construction. Leg press/hack squat machine Version 3 emphasizes knee-ankle mechanics and user weight limits. Exact load ratings and safety standards will be confirmed in the ATC and final contract.
Delivery is governed by the option clause; extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend this period during contract execution, ensuring supply continuity.
The tender data does not disclose the exact EMD amount; bidders must consult the ATC document to determine the required EMD and submission method, including whether online or demand draft is accepted.
The current data does not specify standards; bidders should verify if ISI, ISO, or national gym equipment standards are required in the ATC. Include relevant safety certifications and warranty terms in the bid to ensure acceptance.
With no BOQ items, bids must demonstrate compliance with equipment-level specifications and provide detailed technical datasheets for each machine. Include installation plans, delivery timelines, and risk mitigation for quantity adjustments up to 25%.
Bidders should align with the ATC terms on delivery windows, option-based quantity changes, and payment terms once disclosed. Prepare a milestone-based delivery plan, confirm acceptance testing procedures, and provide interim delivery schedules consistent with potential 30-day minimum extensions.