Bid Publish Date
08-Oct-2026, 11:31 pm
Bid End Date
30-Oct-2026, 4:00 pm
Value
₹5,39,837
Location
Progress
Indo Tibetan Border Police (itbp) announces a tender for Providing and Replacement of glycol motor seal and bearing per direction of engineer incharge, including deduction of cost of old unserviceable motor seal, Servicing and rewinding of 7. 50 HP monoblock motor including Providing, Providing and Replacement of fan coil unit Connection pipe nipple Size 1inch as per direction of engineer incharge, Rewinding of fan coil unit motor with neccessory repair whichever will required during the servicing, labour charges and proper testing of functioning of motor, Providing and Servicing of F. CU Air filter as per direction of engineer incharge, Servicing of Burner including required deep cleaning up to satisfactory mark as per direction of engineer incharge, Providing and Replacement of Burner Nozzle as per direction of engineer incharge, , Providing and Replacement of Burner on off switch as per direction of engineer incharge, , Supplying of filling of glycol as per direction of engineer incharge, Providing and Replacement pressure gauge as per direction of engineer incharge, including deduction of cost of old unserviceable pressure gauge, Providing and Replacement photo cell as per direction of engineer incharge, including deduction of cost of old burnt photo cell, Providing and Replacement brass gate valve 25mm as per direction of engineer incharge, including deduction of cost of old unserviceable brass gate valve 25mm, Providing and Replacement sequence controller as per direction of engineer incharge, including deduction of cost of old unserviceable sequence controller, Providing and Replacement burner ignition transformer as per direction of engineer incharge, including deduction of cost of old unserviceable burner ignition transformer, Providing and Replacement burner fuel pump as per direction of engineer incharge, including deduction of cost of old unserviceable burner fuel pump, Servicing and Repair of motor starter as per direction of engineer incharge, including deduction of cost of old unserviceable materials, Providing and Replacement of F. C. U with Radiator panel as per direction of engineer incharge, including deduction of cost of old unserviceable heating blower unit, Rejointing the CHP heat liquid carrying pipe by repairing pipe jointing with appropriate material etc as per direction of engineer incharge. , Servicing and rewinding of 0. 5 HP monoblock motor pump including Providing and Fixing copper wire, Providign insulation of nitrile rubber insulation tube of wall thickness 06-10 mm for 80-110 mm dia pipes, Providign insulation of nitrile rubber insulation tube of wall thickness 06-10 mm for 15-25 mm dia pipes in LEH, JAMMU & KASHMIR. Quantity: 647. Submission Deadline: 30-10-2026 16: 00: 00. Last date to apply is approaching fast!
Quantity
647
Category
Supplying of filling of glycol as per direction of engineer incharge
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
2
Past Performance
50 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Providing and Replacement of glycol motor seal and bearing per direction of engineer incharge, including deduction of cost of old unserviceable motor seal , Servicing and rewinding of 7.50 HP monoblock motor including Providing , Providing and Replacement of fan coil unit Connection pipe nipple Size 1inch as per direction of engineer incharge , Rewinding of fan coil unit motor with neccessory repair whichever will required during the servicing, labour charges and proper testing of functioning of motor , Providing and Servicing of F.CU Air filter as per direction of engineer incharge , Servicing of Burner including required deep cleaning up to satisfactory mark as per direction of engineer incharge , Providing and Replacement of Burner Nozzle as per direction of engineer incharge, , Providing and Replacement of Burner on off switch as per direction of engineer incharge, , Supplying of filling of glycol as per direction of engineer incharge , Providing and Replacement pressure gauge as per direction of engineer incharge, including deduction of cost of old unserviceable pressure gauge , Providing and Replacement photo cell as per direction of engineer incharge, including deduction of cost of old burnt photo cell , Providing and Replacement brass gate valve 25mm as per direction of engineer incharge, including deduction of cost of old unserviceable brass gate valve 25mm , Providing and Replacement sequence controller as per direction of engineer incharge, including deduction of cost of old unserviceable sequence controller , Providing and Replacement burner ignition transformer as per direction of engineer incharge, including deduction of cost of old unserviceable burner ignition transformer , Providing and Replacement burner fuel pump as per direction of engineer incharge, including deduction of cost of old unserviceable burner fuel pump , Servicing and Repair of motor starter as per direction of engineer incharge, including deduction of cost of old unserviceable materials , Providing and Replacement of F.C.U with Radiator panel as per direction of engineer incharge, including deduction of cost of old unserviceable heating blower unit , Rejointing the CHP heat liquid carrying pipe by repairing pipe jointing with appropriate material etc as per direction of engineer incharge. , Servicing and rewinding of 0.5 HP monoblock motor pump including Providing and Fixing copper wire , Providign insulation of nitrile rubber insulation tube of wall thickness 06-10 mm for 80-110 mm dia pipes , Providign insulation of nitrile rubber insulation tube of wall thickness 06-10 mm for 15-25 mm dia pipes
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
6
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Leh Ladakh
Delivery Pincodes
194101
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Rakesh Singh Bhandari | 194101,COMMANDANT 16TH BN ITBP, CHOGLAMSAR, C/O 56 APO | Leh Ladakh | Ladakh | 194101 | 3 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Providing and Replacement of glycol motor seal and bearing per direction of engineer incharge, including deduction of cost of old unserviceable motor seal
Providing and Replacement of glycol motor seal and bearing per direction of engineer incharge, including deduction of cost of old unserviceable motor seal ( Note- Old scrap material held with vender after replacement ).
Servicing and rewinding of 7.50 HP monoblock motor including Providing
Servicing and rewinding of 7.50 HP monoblock motor including Providing and Fixing of 7 Kg, copper wire, warnish 01 ltr, slive mix 20 pcs, paper P class 01 set, paper P sheet 01 set, solding wire 01 set, brearing 02 nos, cotton tape 01 nos, dr tape 01 nos, thimbles 01 set, with neccessory repair whichever will required during the servicing/ labour charges and proper testing of functioning of motor after servicing on load as per direction of engineer incharge, including deduction of cost of old burnt copper wire ( Note- Old scrap material held with vender after replacement ).
Providing and Replacement of fan coil unit Connection pipe nipple Size 1inch as per direction of engineer incharge
Providing and Replacement of fan coil unit Connection pipe nipple (Size 1inch) as per direction of engineer incharge, including deduction of cost of old unserviceable coil unit Connection pipe nipple (Size 1inch) ( Note- Old scrap material held with vender after replacement ).
Rewinding of fan coil unit motor with neccessory repair whichever will required during the servicing, labour charges and proper testing of functioning of motor
Rewinding of fan coil unit motor with neccessory repair whichever will required during the servicing/ labour charges and proper testing of functioning of motor after servicing on load as per direction of engineer incharge, including deduction of cost of old burnt copper wire ( Note- Old scrap material held with vender after replacement ).
Providing and Servicing of F.CU Air filter as per direction of engineer incharge
Providing and Servicing of F.CU Air filter as per direction of engineer incharge
Servicing of Burner including required deep cleaning up to satisfactory mark as per direction of engineer incharge
Servicing of Burner including required deep cleaning up to satisfactory mark as per direction of engineer incharge
Providing and Replacement of Burner Nozzle as per direction of engineer incharge,
Providing and Replacement of Burner Nozzle as per direction of engineer incharge, including deduction of cost of old unserviceable Burner Nozzle ( Note- Old scrap material held with vender after replacement ).
Providing and Replacement of Burner on off switch as per direction of engineer incharge,
Providing and Replacement of Burner on/off switch as per direction of engineer incharge, including deduction of cost of old unserviceable Burner on/off switch ( Note- Old scrap material held with vender after replacement ).
Supplying of filling of glycol as per direction of engineer incharge
Supplying of filling of glycol as per direction of engineer incharge
Providing and Replacement pressure gauge as per direction of engineer incharge, including deduction of cost of old unserviceable pressure gauge
Providing and Replacement pressure gauge as per direction of engineer incharge, including deduction of cost of old unserviceable pressure gauge ( Note- Old scrap material held with vender after replacement ).
Providing and Replacement photo cell as per direction of engineer incharge, including deduction of cost of old burnt photo cell
Providing and Replacement photo cell as per direction of engineer incharge, including deduction of cost of old burnt photo cell ( Note- Old scrap material held with vender after replacement ).
Providing and Replacement brass gate valve 25mm as per direction of engineer incharge, including deduction of cost of old unserviceable brass gate valve 25mm
Providing and Replacement brass gate valve 25mm as per direction of engineer incharge, including deduction of cost of old unserviceable brass gate valve 25mm ( Note- Old scrap material held with vender after replacement ).
Providing and Replacement sequence controller as per direction of engineer incharge, including deduction of cost of old unserviceable sequence controller
Providing and Replacement sequence controller as per direction of engineer incharge, including deduction of cost of old unserviceable sequence controller ( Note- Old scrap material held with vender after replacement ).
Providing and Replacement burner ignition transformer as per direction of engineer incharge, including deduction of cost of old unserviceable burner ignition transformer
Providing and Replacement burner ignition transformer as per direction of engineer incharge, including deduction of cost of old unserviceable burner ignition transformer ( Note- Old scrap material held with vender after replacement ).
Providing and Replacement burner fuel pump as per direction of engineer incharge, including deduction of cost of old unserviceable burner fuel pump
Providing and Replacement burner fuel pump as per direction of engineer incharge, including deduction of cost of old unserviceable burner fuel pump ( Note- Old scrap material held with vender after replacement ).
Servicing and Repair of motor starter as per direction of engineer incharge, including deduction of cost of old unserviceable materials
Servicing and Repair of motor starter as per direction of engineer incharge, including deduction of cost of old unserviceable materials ( Note- Old scrap material held with vender after replacement ).
Providing and Replacement of F.C.U with Radiator panel as per direction of engineer incharge, including deduction of cost of old unserviceable heating blower unit
Providing and Replacement of F.C.U with Radiator panel as per direction of engineer incharge, including deduction of cost of old unserviceable heating blower unit ( Note- Old scrap material held with vender after replacement ).
Rejointing the CHP heat liquid carrying pipe by repairing pipe jointing with appropriate material etc as per direction of engineer incharge.
Rejointing the CHP heat liquid carrying pipe by repairing pipe/jointing with appropriate material etc as per direction of engineer incharge.
Servicing and rewinding of 0.5 HP monoblock motor pump including Providing and Fixing copper wire
Servicing and rewinding of 0.5 HP monoblock motor pump including Providing and Fixing copper wire, and bearing set with neccessory repair whichever will required during the servicing/ labour charges and proper testing of functioning of motor after servicing on load as per direction of engineer incharge, including deduction of cost of old burnt copper wire ( Note- Old scrap material held with vender after replacement ).
Providign insulation of nitrile rubber insulation tube of wall thickness 06-10 mm for 80-110 mm dia pipes
Providign insulation of nitrile rubber insulation tube of wall thickness 06-10 mm for 80-110 mm dia pipes including removing damaged insulation and applying new nytril insulation and with jointing SS sheet scering as per direction of Engineer in charge.
Providign insulation of nitrile rubber insulation tube of wall thickness 06-10 mm for 15-25 mm dia pipes
Providign insulation of nitrile rubber insulation tube of wall thickness 06-10 mm for 15-25 mm dia pipes including removing damaged insulation and applying new nytril insulation and with jointing SS sheet scering as per direction of Engineer in charge.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Providing and Replacement of glycol motor seal and bearing per direction of engineer incharge, including deduction of cost of old unserviceable motor seal | Providing and Replacement of glycol motor seal and bearing per direction of engineer incharge, including deduction of cost of old unserviceable motor seal ( Note- Old scrap material held with vender after replacement ). | 3 | nos | acengr16thbn | 120 | |
| 2 | Servicing and rewinding of 7.50 HP monoblock motor including Providing | Servicing and rewinding of 7.50 HP monoblock motor including Providing and Fixing of 7 Kg, copper wire, warnish 01 ltr, slive mix 20 pcs, paper P class 01 set, paper P sheet 01 set, solding wire 01 set, brearing 02 nos, cotton tape 01 nos, dr tape 01 nos, thimbles 01 set, with neccessory repair whichever will required during the servicing/ labour charges and proper testing of functioning of motor after servicing on load as per direction of engineer incharge, including deduction of cost of old burnt copper wire ( Note- Old scrap material held with vender after replacement ). | 1 | job | acengr16thbn | 120 | |
| 3 | Providing and Replacement of fan coil unit Connection pipe nipple Size 1inch as per direction of engineer incharge | Providing and Replacement of fan coil unit Connection pipe nipple (Size 1inch) as per direction of engineer incharge, including deduction of cost of old unserviceable coil unit Connection pipe nipple (Size 1inch) ( Note- Old scrap material held with vender after replacement ). | 30 | nos | acengr16thbn | 120 | |
| 4 | Rewinding of fan coil unit motor with neccessory repair whichever will required during the servicing, labour charges and proper testing of functioning of motor | Rewinding of fan coil unit motor with neccessory repair whichever will required during the servicing/ labour charges and proper testing of functioning of motor after servicing on load as per direction of engineer incharge, including deduction of cost of old burnt copper wire ( Note- Old scrap material held with vender after replacement ). | 15 | nos | acengr16thbn | 120 | |
| 5 | Providing and Servicing of F.CU Air filter as per direction of engineer incharge | Providing and Servicing of F.CU Air filter as per direction of engineer incharge | 66 | nos | acengr16thbn | 120 | |
| 6 | Servicing of Burner including required deep cleaning up to satisfactory mark as per direction of engineer incharge | Servicing of Burner including required deep cleaning up to satisfactory mark as per direction of engineer incharge | 6 | nos | acengr16thbn | 120 | |
| 7 | Providing and Replacement of Burner Nozzle as per direction of engineer incharge, | Providing and Replacement of Burner Nozzle as per direction of engineer incharge, including deduction of cost of old unserviceable Burner Nozzle ( Note- Old scrap material held with vender after replacement ). | 6 | nos | acengr16thbn | 120 | |
| 8 | Providing and Replacement of Burner on off switch as per direction of engineer incharge, | Providing and Replacement of Burner on/off switch as per direction of engineer incharge, including deduction of cost of old unserviceable Burner on/off switch ( Note- Old scrap material held with vender after replacement ). | 3 | nos | acengr16thbn | 120 | |
| 9 | Supplying of filling of glycol as per direction of engineer incharge | Supplying of filling of glycol as per direction of engineer incharge | 460 | ltr | acengr16thbn | 120 | |
| 10 | Providing and Replacement pressure gauge as per direction of engineer incharge, including deduction of cost of old unserviceable pressure gauge | Providing and Replacement pressure gauge as per direction of engineer incharge, including deduction of cost of old unserviceable pressure gauge ( Note- Old scrap material held with vender after replacement ). | 8 | nos | acengr16thbn | 120 | |
| 11 | Providing and Replacement photo cell as per direction of engineer incharge, including deduction of cost of old burnt photo cell | Providing and Replacement photo cell as per direction of engineer incharge, including deduction of cost of old burnt photo cell ( Note- Old scrap material held with vender after replacement ). | 2 | nos | acengr16thbn | 120 | |
| 12 | Providing and Replacement brass gate valve 25mm as per direction of engineer incharge, including deduction of cost of old unserviceable brass gate valve 25mm | Providing and Replacement brass gate valve 25mm as per direction of engineer incharge, including deduction of cost of old unserviceable brass gate valve 25mm ( Note- Old scrap material held with vender after replacement ). | 10 | nos | acengr16thbn | 120 | |
| 13 | Providing and Replacement sequence controller as per direction of engineer incharge, including deduction of cost of old unserviceable sequence controller | Providing and Replacement sequence controller as per direction of engineer incharge, including deduction of cost of old unserviceable sequence controller ( Note- Old scrap material held with vender after replacement ). | 2 | nos | acengr16thbn | 120 | |
| 14 | Providing and Replacement burner ignition transformer as per direction of engineer incharge, including deduction of cost of old unserviceable burner ignition transformer | Providing and Replacement burner ignition transformer as per direction of engineer incharge, including deduction of cost of old unserviceable burner ignition transformer ( Note- Old scrap material held with vender after replacement ). | 1 | nos | acengr16thbn | 120 | |
| 15 | Providing and Replacement burner fuel pump as per direction of engineer incharge, including deduction of cost of old unserviceable burner fuel pump | Providing and Replacement burner fuel pump as per direction of engineer incharge, including deduction of cost of old unserviceable burner fuel pump ( Note- Old scrap material held with vender after replacement ). | 1 | nos | acengr16thbn | 120 | |
| 16 | Servicing and Repair of motor starter as per direction of engineer incharge, including deduction of cost of old unserviceable materials | Servicing and Repair of motor starter as per direction of engineer incharge, including deduction of cost of old unserviceable materials ( Note- Old scrap material held with vender after replacement ). | 1 | nos | acengr16thbn | 120 | |
| 17 | Providing and Replacement of F.C.U with Radiator panel as per direction of engineer incharge, including deduction of cost of old unserviceable heating blower unit | Providing and Replacement of F.C.U with Radiator panel as per direction of engineer incharge, including deduction of cost of old unserviceable heating blower unit ( Note- Old scrap material held with vender after replacement ). | 4 | nos | acengr16thbn | 120 | |
| 18 | Rejointing the CHP heat liquid carrying pipe by repairing pipe jointing with appropriate material etc as per direction of engineer incharge. | Rejointing the CHP heat liquid carrying pipe by repairing pipe/jointing with appropriate material etc as per direction of engineer incharge. | 6 | nos | acengr16thbn | 120 | |
| 19 | Servicing and rewinding of 0.5 HP monoblock motor pump including Providing and Fixing copper wire | Servicing and rewinding of 0.5 HP monoblock motor pump including Providing and Fixing copper wire, and bearing set with neccessory repair whichever will required during the servicing/ labour charges and proper testing of functioning of motor after servicing on load as per direction of engineer incharge, including deduction of cost of old burnt copper wire ( Note- Old scrap material held with vender after replacement ). | 2 | nos | acengr16thbn | 120 | |
| 20 | Providign insulation of nitrile rubber insulation tube of wall thickness 06-10 mm for 80-110 mm dia pipes | Providign insulation of nitrile rubber insulation tube of wall thickness 06-10 mm for 80-110 mm dia pipes including removing damaged insulation and applying new nytril insulation and with jointing SS sheet scering as per direction of Engineer in charge. | 5 | mtr | acengr16thbn | 120 | |
| 21 | Providign insulation of nitrile rubber insulation tube of wall thickness 06-10 mm for 15-25 mm dia pipes | Providign insulation of nitrile rubber insulation tube of wall thickness 06-10 mm for 15-25 mm dia pipes including removing damaged insulation and applying new nytril insulation and with jointing SS sheet scering as per direction of Engineer in charge. | 15 | mtr | acengr16thbn | 120 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer