TenderDekho Logo
Closed GEM

Indian Army 3X Gang Mowers Tender Alwar Rajasthan 301001 3X GANG MOWERS 2026

Bid Publish Date

14-Sep-2026, 7:19 pm

Bid End Date

24-Sep-2026, 8:00 pm

Progress

Issue14-Sep-2026, 7:19 pm
Technical19-09-2026 12:26:09
Financial
AwardCompleted

Key Highlights

  • • Advanced delivery flexibility: option to increase quantity by up to 25% mid-contract
  • • Delivery period calculation requires minimum 30 days extension when extended
  • • ATC terms govern delivery timelines and quantity adjustments during currency
  • • Product category: 3X GANG MOWERS implies multi-head mower equipment for rugged terrain

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for 3X GANG MOWERS in ALWAR, RAJASTHAN 301001. The tender references a single product category without listed BOQ items and lacks explicit quantity or estimated value details. The procurement emphasizes vendor capability to meet the option clause allowing up to 25% quantity variation, with contract delivery times anchored to the original delivery window. The ATC term highlights flexibility in order quantity and schedule changes, requiring bidders to comply with these delivery provisions while maintaining contract rates. This opportunity targets suppliers with capable machining and agricultural equipment portfolios aligned to rugged military operations, with emphasis on reliable supply under extended periods if required.

Technical Specifications & Requirements

No formal specifications are published in the tender data. The product is categorized as 3X GANG MOWERS, suggesting multi-head mowing equipment suitable for rugged terrain. Bidder parameters to infer from ATC include: ability to absorb 25% quantity variations, alignment to original delivery period, and calculated extension time formula. Absence of explicit technical standards means bidders should prepare standard commercial versions with robust field service support. Key implied expectations include durable construction, ease of maintenance, and compatibility with military logistical channels. Consider presenting option-ready, field-tested mower models with proven reliability for Alwar’s terrain.

Terms, Conditions & Eligibility

  • Option Clause permits ±25% quantity variation at contract award and during currency; delivery timelines adjusted from the last date of the original delivery order.
  • Calculated extended delivery time = (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • Purchaser may extend delivery duration up to the original delivery period while exercising the option clause.
  • Bidders must comply with ATC terms and demonstrate ability to deliver within the extended/modified schedule as applicable.
  • No BOQ or explicit EMD/turnover requirements published; bidders should anticipate standard government procurement compliance and ATC adherence.

Key Specifications

  • Product/service names: 3X GANG MOWERS

  • Estimated value: Not disclosed

  • Quantity: Not disclosed; option clause allows ±25% variation

  • Delivery terms: Extended delivery time formula; minimum 30 days

  • Standards/certifications: Not specified in tender data

  • Warranty/AMC: Not specified

Terms & Conditions

  • Quantity fluctuation up to 25% during contract with adjusted delivery timelines

  • Delivery period extensions calculated by (increased quantity/original quantity) × original period

  • Compliance with ATC terms; no explicit EMD or turnover details published

Important Clauses

Payment Terms

Not specified in tender data; bidders should anticipate standard government terms and ATC-compliant payments

Delivery Schedule

Delivery period begins from the last date of original delivery order; extensions follow the option clause with minimum 30 days

Penalties/Liquidated Damages

Not specified in tender data; bidders should monitor ATC terms for potential LDs or penalties

Bidder Eligibility

  • Proven ability to supply rugged agricultural/machinery equipment

  • Comply with option quantity variations up to 25%

  • Demonstrate logistics capacity to deliver within modified schedules

  • Adhere to standard government procurement documentation (GST, PAN, EMD)

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
AGRICARE CORPORATION   Under PMA
Make : GREEN PARK Model : GPWM03 Title : 3X GANG MOWERS19-09-2026 12:26:09
2
ASSAM STORES   Under PMA
Make : NA Model : 3X GANG MOWERS Title : 3X GANG MOWERS22-09-2026 19:10:17
3
KB Stella Technologies   Under PMA
Make : NA Model : 3X GANG MOWERS Title : 3X GANG MOWERS23-09-2026 15:34:33
4
M & M CONSULTANTS   Under PMA
Make : TURFCARE Model : Turfcare M&M Consultants Title : 3X GANG MOWERS23-09-2026 11:35:55
5
NIKHIL FOOD SERVICES   Under PMA
Make : OEM Model : 3X GANG MOWERS Title : 3X GANG MOWERS24-09-2026 08:48:03
6
RUDRANSH CORPORATION   Under PMA
Make : NA Model : 3X GANG MOWERS Title : 3X GANG MOWERS21-09-2026 18:57:04
7
TurfCraft Enterprises   Under PMA
Make : OEM Model : 3X Gang Mowers Title : 3X GANG MOWERS23-09-2026 15:55:05

Financial Results

Rank Seller Price Item
L1
RUDRANSH CORPORATION(MII)   Under PMA
Item Categories : 3X GANG MOWERS
L2
ASSAM STORES (MII)   Under PMA
Item Categories : 3X GANG MOWERS
L3
KB Stella Technologies (MII)   Under PMA
Item Categories : 3X GANG MOWERS

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

3X GANG MOWERS

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Alwar

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-AlwarAlwar--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9881483.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Categories 1

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply (if available)

4

Financial statements or balance sheets (last 2-3 years)

5

Earnest Money Deposit (EMD) documentation as per standard government norms

6

Technical bid documents showing product specifications and compliance

7

OEM authorization or dealership certificates (if applicable)

8

Any added ATC-compliant certificates or compliance statements

Frequently Asked Questions

Key insights about RAJASTHAN tender market

How to bid for 3X GANG MOWERS tender in Alwar Rajasthan 2026

Bidders should align with ATC terms, prepare standard bid documents, and submit GST, PAN, EMD, and technical compliance. The tender supports a quantity variation up to 25% with delivery extensions; ensure readiness to adjust delivery timelines per the original contract period.

What documents are required for Indian Army equipment tender in Rajasthan

Submit GST registration, PAN, experience certificates, financial statements, EMD documents, and OEM authorization if applicable. Technical bid must demonstrate mower specifications and maintenance support to meet field conditions in Alwar.

What are the delivery terms for quantity variation under ATC

Delivery terms allow up to 25% increased quantity during contract, with extension time calculated as (increased/original) × original delivery period, minimum 30 days; original period governs extended timelines when options are exercised.

What specifications are required for 3X GANG MOWERS tender in India

No explicit technical specs published; bidders should present rugged, field-tested 3-head mower models with robust maintenance support, suitable for military terrain, and confirm compatibility with standard Indian Army logistics.

What is the required eligibility for Indian Army equipment procurement

Eligibility includes ability to supply similar machinery, comply with ATC clauses, possess GST and PAN, and provide financial credibility; OEM authorization strengthens eligibility for equipment like 3X gang mowers.

When is the delivery timeline applicable for extended orders

Delivery begins from the last date of the original delivery order; if extended, the additional time follows the option clause calculation, ensuring at least 30 days extension where needed.

Advertisement