TenderDekho Logo
Closed GEM

Hindustan Petroleum Corporation Ltd 3/4/6 Inch Valve & Pipeline Hardware Tender India 2026

Bid Publish Date

02-Feb-2026, 8:50 am

Bid End Date

12-Feb-2026, 9:00 am

Progress

Issue02-Feb-2026, 8:50 am
Technical02-Nov-2026, 1:10 pm
Financial
Award20-Mar-2026, 2:05 pm
Explore all 4 tabs to view complete tender details

Quantity

12349

Category

3 inch ELBOW

Bid Type

Two Packet Bid

Categories 139

AGITATORS BP INSTRUMENT SCRAP WIND MILL ENERGY PROJECT FLOATING ROOF WATER DISTRIBUTION APPARELS HOT AIR GUN PLATFORM SCALE BRIDGE CONSTRUCTION DECIBEL METER MISCELLANEOUS VALVE PAINTING PARAMETER TEST ANGLE GLOBE VALVES STRUCTURE FABRICATION TESTING INSTRUMENT BUTTERFLY VALVES CONSTRUCTION MATERIALS TUBE AND FITTING PLATE SUPPLY IRON ALMIRAH STRUCTURAL STEEL FURNITURE ARC VALVE RADIO FREQUENCY ANALYSER HARDWARE AND FASTENERS WELL TESTING EQUIPMENTS DISTEMPER AGRICULTURAL PUMP PVC FLOORING RUBBER GASKET STEEL TUBE PIPING SEALS WATTMETERS ELBOW WEARING PIECE CLOTHING FLANGE AMC OF ELECTRONIC ARTICULATING LAZY ARMS COATING SERVICES WATER PROOFING WORK MUSICAL INSTRUMENT PARTS AND ACCESSORIES THICKNESS GAUGE ART METALS WATER PIPE LINE MILITARY VEHICLE WATER SUPPLY STOMACHERS MAINTENANCE CONTRACT OF ELECTRONIC ANTI CORROSIVE TREATMENT PUMPS NOZZLE ELASTROMERIC PIPE TILES AND FLAGSTONES ALUMINIUM ALLOY BUS TERMINAL SEALING RING WATER TANK BRUSH SEATER COUPLER BUTORPHANOL TARTRATE PNEUMATIC POSITIONER GI PIPE BLASTING MACHINE FLOW REGULATOR GYMNASTIC ROPE AND CLIMBING ACCESSORIES WATER STORAGE AND SUPPLY AUDIOMETERS FLUID MECHANICS EQUIPMENT VOLTMETER PIPING PROJECT GLUCOMETER FALL PROTECTION LANYARD PUMP VALVES TILE FLOORING BOLTS PRESSURE GAUGE VALVES GASKETS AND SEALS WEIGH BRIDGE WHEEL BEARING THERMOWELLS WATER SUPPLY PROJECT STEEL TANK BUFFS RODS VALVE TANK CLEANER WATER LEVEL RECORDER FLOW SWITCHES SANITARY FITTING WATER SUPPLY MATERIAL FILTER RETAINERS FLOW DETECTOR PENDA FUEL PUMP BODYWEIGHT MEASURING SCALE ERECTION OF STRUCTURAL EMULSION PAINT TURBINE PUMPS MISCELLANEOUS FINISHES ROUTINE MAINTENANCE EXHAUST SYSTEM SMART POSITIONER ADHESIVE OVER HEAD TANK SLIDER VALVES PAINTS AND PRIMERS FIRE RESISTANT COATINGS GAS BURNERS MESH BOILER MOUNTING VALVE PYROMETERS FIRE BREATHING APPARATUS FABRICATOR WATER TRANSMISSION STEEL WATER TANK LIFT IRRIGATION BUTTERFLY LUG PATTERN VALVES VALVE PARTS AND ACCESSORIES SOLID ROCKET MOTORS SPRAYING SERVICES ESCRAP STRUCTURE LIQUID PENETRANT EXAMINATION EQUIPMENT BOILER VALVE METAL FABRICATION PEB APPLICATORS PAINTS METAL PRODUCTS STEEL SUPPLY MEDICAL DIAGNOSTIC GAMMA CAMERAS WEIGHTS MANUFACTURING SERVICES GALVANIZED IRON PIPE

Tender Overview

Hindustan Petroleum Corporation Ltd invites bids for a broad range of mechanical and piping components, including 3 inch ELBOW, 3 inch GI PIPE, 6 inch BUTTERFLY VALVE, 4 inch BUTTERFLY VALVE, 3 inch BALL VALVE, along with installation, painting, welding, and structural fabrication work. The scope encompasses 46 BOQ items with a diverse mix of fittings, gaskets, fasteners, safety equipment, tank repairs, and related services. Estimated value and EMD are not disclosed in the available data, while the vendor list implies a substantial material and service requirement across multiple disciplines. Unique aspects include a wide catalog—spanning valves, flanges, gaskets, pumps, and structural components—potentially requiring multi-supplier coordination and cross-disciplinary capability. The tender emphasizes delivery terms and quantity variation under the option clause, signaling flexible procurement dynamics and long-form project support. This opportunity targets suppliers capable of meeting industrial-grade material specifications and timely delivery within HPCL’s project framework in India.

Technical Specifications & Requirements

  • Total BOQ items: 46; broad assortment of mechanical, piping, and structural items
  • Key product categories include: 3 inch ELBOW, 3 inch GI PIPE, 6 inch BUTTERFLY VALVE, 4 inch BUTTERFLY VALVE, 3 inch BUTTERFLY VALVE, 3 inch BALL VALVE, 4 inch Flange Blind, Gaskets, Stud-Bolts with Washer, Safety Harnesses by KARAM, Pipes, Nipples, and Welded MS Pipelines, Pumps (UG Tank Pump) and related components
  • Supporting works: welding, painting of tank sections, dismantling, fabrication, tank platform repair, hydro-jet nozzle kit, tank manhole mesh cover, and supply of rubber seals, spider gaskets, and accessories
  • Delivery terms hinge on an option clause: up to ±25% quantity changes; delivery duration calculated as (additional quantity ÷ original quantity) × original period, minimum 30 days; extension allowed up to original period
  • ATC/DOC requirements exist per bidder, with an uploaded ATC file governing terms
  • No explicit technical standards or certifications are listed in the publicly visible data; OEM authorizations and typical EPC/industrial procurement controls would apply

Terms, Conditions & Eligibility

  • EMD and exact estimated value are not disclosed in the provided data; bidders should verify the latest tender documents for amount and payment terms
  • Option Clause: Purchaser may increase/decrease quantity up to 25% at contract time and during currency at contracted rates
  • Delivery Timelines: Calculated delivery extension mechanism based on original and extended quantities; minimum extension baseline of 30 days; extensions may apply up to the original delivery period
  • Public ATC document exists; bidders must review and comply with bidder-specific terms
  • Standard procurement prerequisites (GST, PAN, experience certificates, financials) apply per organizational norms; OEM authorizations may be required for certain items

Key Specifications

  • 46-item BOQ spanning: 3 inch ELBOW, 3 inch GI PIPE, 6 inch BUTTERFLY VALVE, 4 inch BUTTERFLY VALVE, 3 inch BUTTERFLY VALVE, 3 inch BALL VALVE, 4 inch Flange Blind, 3mm Champion Gasket, Stud-Bolts with Washer, Safety Harness by KARAM, Bitumin filling supplies, Rubber seals, UG Tank Pumps & motors, SS/ MS pipe welding, tank painting components

  • Materials & components include: GI pipes, MS pipes, various NIPPLE/ELBOW fittings, flanges, gaskets, and bolts with washers; safety equipment and hardware for tank maintenance

  • Auxiliary works cover repair, dismantling, supply and installation of structural elements, tank platform repair, and painting/cleanup of tank surfaces

  • Delivery term construct relies on option clause allowing ±25% quantity changes and formula-based time extensions, with a minimum 30-day extension rule

  • No explicit technical standards listed in the data; expect typical HPCL vendor compliance and OEM authorizations for critical items

Terms & Conditions

  • Option Clause allows quantity variation up to 25% at contract and during currency

  • Delivery extensions calculated by (additional/original quantity) × original delivery period with minimum 30 days

  • EMD/estimated value not disclosed in the provided information; verify tender documents and ATC

Important Clauses

Payment Terms

No explicit payment terms published; bidders should refer to ATC and standard HPCL guidelines in the tender documents

Delivery Schedule

Delivery period starts after the original delivery order date; extension rules apply per option clause with minimum 30 days

Penalties/Liquidated Damages

Not specified in the provided data; bidders must review the ATC and contract terms for LDs or penalties

Bidder Eligibility

  • GST registration and PAN

  • Experience in supplying mechanical/piping components or tank fabrication/maintenance

  • Ability to supply 46-item BOM and fulfill installation/repair scope per HPCL requirements

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

3 inch ELBOW , 3 inch GI PIPE , 6 inch BUTTERFLY VALVE , 4 inch BUTTERFLY VALVE , 3 inch BUTTERFLY VALVE , FLP PUMP GLAND REPAIRING , REFIXING OF VENTURI , TANK MANHOLE MESH COVER , 3 inch BALL VALVE , INSTALLATION OF 3 inch BALL VALVE , PAINTING 3 inch PIPELINE , WELDING OF MS PIPELINE , HYDRO-JET PUMP NOZZLE KIT , CUTTING OF OLD FLANGE , TANK PLATFORM REPAIRING , OLD STRUCTURE DISMATL and FAB , SUP OF STRUCTURE , FAB OF STRUCTURE , Cleaning painting of tank bottom plate , Cleaning painting first shell inside tan , Cleaning painting of tank roof , Supply of 4inch Flange Blind , Supply of 3mm Champion Gasket , Supply of Stud-Bolts with Washer , Safety Harness Block-KARAM , Safety Harness Belt-KARAM , Bitumin Filling in Tank Pad Gaps , Bitumin Filling in Tank Dyke Cracks , Dismantling worn out Sec. Rubber Seal , Supply, Inst. Sec. Rubber Seals of Tanks , Supply of Nut-Bolts with Washer , Rubber Spider UG Tank Pumps , UG Tank Pump Motor Coupler , Metallic Gasket for Tank TSV 1INCH , Water flowmeter 3INCH , Plaster 18MM , ELBOW 6inch , ELBOW 1inch , ELBOW 2inch , ELBOW 0.75 inch , REDUCER 0.75inch , THREAD NIPPLE 1inch , THREAD NIPPLE 2inch , REPAIR OF SWING LADDER , SUPPLY OF NUMBERING PUNCH , SS PIPELINE WELDING

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8912613.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 46 Items Sign in for GEM prices

#1

3 inch ELBOW

SUPPLY OF 3inch MS ELBOW

21 ea Delivery: 365 days
#2

3 inch GI PIPE

SUPPLY OF 3inch GI PIPE

6 m Delivery: 365 days
#3

6 inch BUTTERFLY VALVE

SUPPLY AND INSTALLATION OF 6 INCH Butterfly Valves of the HPCL approved make valves L&T VALVES, FLOWSERVE, ROTORK, EMERSON, PENTAIR, ADVANCE VALVES, AUDCO

5 ea Delivery: 365 days
#4

4 inch BUTTERFLY VALVE

SUPPLY AND INSTALLATION OF 4 INCH Butterfly Valves of the HPCL approved make valves L&T VALVES, FLOWSERVE, ROTORK, EMERSON, PENTAIR, ADVANCE VALVES, AUDCO

5 ea Delivery: 365 days
#5

3 inch BUTTERFLY VALVE

SUPPLY AND INSTALLATION OF 3 INCH Butterfly Valves of the HPCL approved make valves L&T VALVES, FLOWSERVE, ROTORK, EMERSON, PENTAIR, ADVANCE VALVES, AUDCO

3 ea Delivery: 365 days
#6

FLP PUMP GLAND REPAIRING

REPAIRING OF FLP PUMP

1 ea Delivery: 365 days
#7

REFIXING OF VENTURI

DISMANTLING AND REFIXING OF VENTURI MS TANKS FOAM POURER

15 ea Delivery: 365 days
#8

TANK MANHOLE MESH COVER

MS MESH COVER FOR TANK MANHOLES

10 ea Delivery: 365 days
#9

3 inch BALL VALVE

SUPPLY OF 3inch BALL VALVE of Approved make L&T VALVES, FLOWSERVE, ROTORK, EMERSON, PENTAIR, ADVANCE VALVES, AUDCO

5 ea Delivery: 365 days
#10

INSTALLATION OF 3 inch BALL VALVE

INSTALLATION OF 3inch BALL VALVE

15 ea Delivery: 365 days
#11

PAINTING 3 inch PIPELINE

PAINTING 3inch PIPELINE INCLUDING SUPPLY OF PAINT APPROVED MAKES- Asian Paint, Berger, Nerolac

70 mr Delivery: 365 days
#12

WELDING OF MS PIPELINE

WELDING AND FABRICATION OF MS PIPELINE ON INCH DIA BASIS at multiple places inside terminal as per site requirement and site incharge instructions.

670 id Delivery: 365 days
#13

HYDRO-JET PUMP NOZZLE KIT

Supply of rotating nozzle which is part of Hydrojet pump avilable at terminal and being used for the tank cleaning acitivity.

7 ea Delivery: 365 days
#14

CUTTING OF OLD FLANGE

HOT CUTTING OF OLD FLANGE

400 id Delivery: 365 days
#15

TANK PLATFORM REPAIRING

REPAIRING OF TANKS WALKWAY, WIND GIRDERS HOLES, STAIRS WELDING ETC

100 m2 Delivery: 365 days
#16

OLD STRUCTURE DISMATL and FAB

DISMANTLING AND FABRICATION OF OLD MS STRUCTURES at multiple places inside terminal as per site requirement and site incharge instructions.

2,000 kg Delivery: 365 days
#17

SUP OF STRUCTURE

SUPPLY OF STRUCTURAL STEEL at multiple places inside terminal as per site requirement and site incharge instructions.

1,000 kg Delivery: 365 days
#18

FAB OF STRUCTURE

FABRICATION OF STRUCTURAL STEEL, at multiple places inside terminal as per site requirement and site incharge instructions.

2,000 kg Delivery: 365 days
#19

Cleaning painting of tank bottom plate

Supply of HPCL approved protectmastic PU primer 1 coat as per specification. APPROVED MAKES- Asian Paint/ Berger / Nerolac

1,500 m2 Delivery: 365 days
#20

Cleaning painting first shell inside tan

Supply of HPCL approved protectmastic PU primer 1 coat as per specification. APPROVED MAKES- Asian Paint/ Berger / Nerolac

450 m2 Delivery: 365 days
#21

Cleaning painting of tank roof

Supply of Paint, Chipping, Buffing, Cleaning Painting of Tank Roof Supply of HPCL approved protectmastic PU primer 2 coat as per specification.

500 m2 Delivery: 365 days
#22

Supply of 4inch Flange Blind

Supply of 4inch Flange Blind 150 class

16 ea Delivery: 365 days
#23

Supply of 3mm Champion Gasket

Supply of 3mm Champion Gasket SIZE 1500X1200MM2

6 ea Delivery: 365 days
#24

Supply of Stud-Bolts with Washer

Supply of Stud Bolts with Washer of size 18X80MM, 16X80MM as per the site incharge instruction.

40 kg Delivery: 365 days
#25

Safety Harness Block-KARAM

Safety Harness Block KARAM

10 ea Delivery: 365 days
#26

Safety Harness Belt-KARAM

Safety Harness Belt KARAM

10 ea Delivery: 365 days
#27

Bitumin Filling in Tank Pad Gaps

Bitumin Filling in Tank Pad Gaps after cleaning of the dyke crack surface and necessary surface preparation as per site incharge.

1,200 mr Delivery: 365 days
#28

Bitumin Filling in Tank Dyke Cracks

Bitumin Filling in Tank Dyke Cracks after cleaning of the dyke crack surface and necessary surface preparation as per site incharge.

1,500 mr Delivery: 365 days
#29

Dismantling worn out Sec. Rubber Seal

Dismantling worn out Sec. Rubber Seal of Tank. Secondary rubber seal (Whether seal) of the tank to be dismantled and shifted to scrap yard. Using non sparking tools on the tank roof.

300 mr Delivery: 365 days
#30

Supply, Inst. Sec. Rubber Seals of Tanks

Supply, Inst. Sec. Rubber Seals of Tanks. Supply and Installation of the secondary rubber seal to be done on the tank roof using non sparking tools. Tank Seal requirement should meet IS and API standards.

300 mr Delivery: 365 days
#31

Supply of Nut-Bolts with Washer

Supply of Nut Bolts with Washer 6X40MM

10 kg Delivery: 365 days
#32

Rubber Spider UG Tank Pumps

Rubber spider to be supplied for using in the underground tank vertical pumps. It should meet site pump requirement and specification

6 ea Delivery: 365 days
#33

UG Tank Pump Motor Coupler

UG Tank Pump Motor Coupler. Coupler for the vertical pumps as per site requirement

2 ea Delivery: 365 days
#34

Metallic Gasket for Tank TSV 1INCH

Metallic Gasket for Tank TSV 1INCH

20 ea Delivery: 365 days
#35

Water flowmeter 3INCH

Water flowmeter 3INCH. Mechanical water flow meter required to be supplied.

1 ea Delivery: 365 days
#36

Plaster 18MM

Plaster 18MM at multiple places inside terminal as per site requirement and site incharge instructions.

100 m2 Delivery: 365 days
#37

ELBOW 6inch

SUPPLY OF 6inch MS ELBOW

1 ea Delivery: 365 days
#38

ELBOW 1inch

SUPPLY OF 1inch MS ELBOW

7 ea Delivery: 365 days
#39

ELBOW 2inch

SUPPLY OF 2inch MS ELBOW

2 ea Delivery: 365 days
#40

ELBOW 0.75 inch

SUPPLY OF 0.75 inch MS ELBOW

4 ea Delivery: 365 days
#41

REDUCER 0.75inch

SUPPLY OF 0.75 inch MS REDUCER

4 ea Delivery: 365 days
#42

THREAD NIPPLE 1inch

SUPPLY OF 1inch MS THREAD NIPPLE

2 ea Delivery: 365 days
#43

THREAD NIPPLE 2inch

SUPPLY OF 2inch MS THREAD NIPPLE

2 ea Delivery: 365 days
#44

REPAIR OF SWING LADDER

REPAIRING OF SWING LADDER AT GANTRY AND CALIBRATION TOWER

2 ea Delivery: 365 days
#45

SUPPLY OF NUMBERING PUNCH

SUPPLY OF NUMBERING PUNCH FOR TT DIP RODS FOR CALIBRATION

1 set Delivery: 365 days
#46

SS PIPELINE WELDING

WELDING OF SS PIPELINES ON INCH DIA BASIS at multiple places inside terminal as per site requirement and site incharge instructions.

20 id Delivery: 365 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Annual Turnover

6

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
AMBANI DESIGN   Under PMA
-11-02-2026 13:10:52
2
BHARAT CONSTRUCTION COMPANY   Under PMA
-11-02-2026 12:34:14
3
HARDIK CONSTRUCTION   Under PMA
-11-02-2026 18:17:17
4
SAMOTA CONSTRUCTION CO.   Under PMA
-08-02-2026 10:44:51

Financial Results

Rank Seller Price Item
L1
BHARAT CONSTRUCTION COMPANY(MSE,MII)( MSE Social Category:OBC )    Under PMA
Item Categories : 3 inch ELBOW,3 inch GI PIPE,6 inch BUTTERFLY VALVE,4 inch BUTTERFLY VALVE,3 inch BUTTERFLY VALVE,FL
L2
SAMOTA CONSTRUCTION CO. (MSE,MII)( MSE Social Category:OBC )    Under PMA
Item Categories : 3 inch ELBOW,3 inch GI PIPE,6 inch BUTTERFLY VALVE,4 inch BUTTERFLY VALVE,3 inch BUTTERFLY VALVE,FL
L3
HARDIK CONSTRUCTION (MII)( MSE Social Category:General )    Under PMA
Item Categories : 3 inch ELBOW,3 inch GI PIPE,6 inch BUTTERFLY VALVE,4 inch BUTTERFLY VALVE,3 inch BUTTERFLY VALVE,FL
L4
AMBANI DESIGN (MII)   Under PMA
Item Categories : 3 inch ELBOW,3 inch GI PIPE,6 inch BUTTERFLY VALVE,4 inch BUTTERFLY VALVE,3 inch BUTTERFLY VALVE,FL

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about GUJARAT tender market

How to bid for HPCL piping and valve tender in India 2026

Bidders should first obtain the ATC document and review the 46-item BOQ. Prepare GST, PAN, experience certificates, financials, and OEM authorizations. Ensure compliance with the option clause allowing ±25% quantity changes and understand the delivery-extension formula. Submit technical and commercial bids as required.

What documents are required for HPCL tender submission 2026

Submit GST certificate, PAN card, experience certificates, financial statements, EMD documentation, technical bid, OEM authorizations, and any factory QA/certifications. Ensure all documents align with the Bid Submission Checklist in the ATC and relevant terms and conditions.

What are the technical scope items in HPCL 46-item BOM tender

The BOM includes 3 inch ELBOW, 3 inch GI PIPE, 6 inch BUTTERFLY VALVE, 4 inch BUTTERFLY VALVE, 3 inch BALL VALVE, 4 inch Flange Blind, gaskets, studs, safety gear, pumps, welding supplies, and tank-related components, plus painting and foundation works.

When is the delivery extension applicable in HPCL procurement

Delivery extensions apply when quantity changes occur under the option clause. Extension time is (additional quantity ÷ original quantity) × original delivery period, with a minimum extension of 30 days; extensions may not exceed the original delivery period.

What standards or certifications are expected for HPCL tank components

While explicit standards are not listed, suppliers should provide OEM authorizations and comply with HPCL procurement norms for mechanical and piping equipment, including gasket and valve assemblies, and safety equipment from recognized brands.

What is the scope of installation and fabrication work in this tender

Scope covers installation of valves, piping, and structural components, plus tank platform repair, painting of tank interiors/exteriors, and related welding and dismantling activities as per listed items in the 46-item BOM.

What is required for OEM authorization in HPCL bids 2026

Bidders must present OEM authorization letters for brand-specific items, ensuring that critical components like valves, gaskets, and pumps are sourced from approved manufacturers and meet HPCL’s technical and quality expectations.

How to verify EMD and estimated value for HPCL tender 2026

EMD and estimated value are not disclosed in the publicly available data; bidders must consult the official tender documents and ATC for exact amounts, payment terms, and submission deadlines before bid submission.