Floor Tiles,Wall Tiles,Electrical Work,Windows,Doors Mesh Door,Renovation of kitchen,Renovation of
Central Board Of Direct Taxes (cbdt)
KANPUR NAGAR, UTTAR PRADESH
Bid Publish Date
29-Apr-2025, 12:11 pm
Bid End Date
20-May-2025, 1:00 pm
Value
₹9,00,000
Location
Progress
Quantity
3284
Bid Type
Two Packet Bid
A tender has been published for Central Board Of Excise And Customs (cbec) Renovation work, Renovation work of DG cabin, Renovation work of DG cabin 1 st floor New Custom House, Renovation, DG Cabin in MUMBAI, MAHARASHTRA. Quantity: 3284 by. Submission Deadline: 20-05-2025 13: 00: 00. Check eligibility and apply.
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Central Board Of Direct Taxes (cbdt)
KANPUR NAGAR, UTTAR PRADESH
Central Board Of Direct Taxes (cbdt)
KANPUR NAGAR, UTTAR PRADESH
Central Board Of Direct Taxes (cbdt)
KANPUR NAGAR, UTTAR PRADESH
Central Board Of Direct Taxes (cbdt)
KANPUR NAGAR, UTTAR PRADESH
Central Board Of Direct Taxes (cbdt)
KANPUR NAGAR, UTTAR PRADESH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Renovation work | Providing and fixing customised Wall cladding work with wooden decorative Panel- Wall paneling . 12 mm thick plywood to be applied with required frame structure,design along with proper lining & labelling.all complete in laminate finish. Panels made of laminate, strands, particles or fibers and bonded with a synthetic or other adhesive cured using heat and pressure. The properties of the panel product are a result of the character of the wood raw material, the adhesive, additives etc.Planks and panels in thickness, with sizes being 1/2 inch and 3/4 inch. panels are thinner at roughly 1/4 inch.Coating of paint Finish to be applied wherever required etc. | 192 | sqft | chsadmin | 20 |
| 2 | Renovation work of DG cabin | Providing and fixing of customised single layer partition work Wooden Partition of varying lengths shapes bends curves in hall cabin area constructed out of 1 no multiply 19 mm hardwood frame work grid at inner supports lesser spacing screwed firmly to the RCC slab beam floor wall other partition or furniture unit etc. with necessary slots for passage of electrical conduits cables and covered with 8mm thick Plywood MR grade finished with 0.8 mm thick Laminate with 12 mm toughened clear glass with acid wash film in part areas in place by half inch BTC lipping in melamine polish from inner side including fixing & sealing of wooden partition with all complete as per site requirement. | 203 | sqft | chsadmin | 20 |
| 3 | Renovation work of DG cabin 1 st floor New Custom House | Existing partition dismantling carefully demolishing the plywood panels frames false ceiling flooring taking the debris filling up in sacks and throwing out the debris out of site. | 1 | job | chsadmin | 20 |
| 4 | Renovation | Existing electrical Main panel covering with customised decortive storage type with openable louver door. Fixing the plywood frames for concealing the cables etc. fixing the louver doors with hardware material such as hinges, handles etc. Scraping the frame with help of sand paper for smoothing and Applying 1coat of paint. Filling the gaps, cracks & holes with wax. Again scraping with sand paper and preparing the surface and applying two to three coats of superior quality paint. | 1 | no | chsadmin | 20 |
| 5 | DG Cabin | Pdg and installation of customised decorative running cantilever suspended apex.They are very easy to install wood usually consist of wood panels which are then joined together with standard commercial apex systems T-15 and T-24 profiles. Marking out the desired height of your apex design from the floor along the walls and add wooden struts to support the structure. Then installing the wooden panels and using choice of paints and finishes to complete the look.as it provides protection the room from cold and overheating it is environmentally safe and durable. | 214 | sqft | chsadmin | 20 |
| 6 | Renovation work of DG cabin 1 st floor New Custom House | Luster Painting work Sand papering cleaning the surface to smooth texture filling the holes and cracks with putty and sanding them until they re smooth. applying primer and other sealers with lambipatti using necessary tools to full surface in layers thereafter applying coats of paint finished in approved shade and colour. Roller to be applied on all surface surface etc. | 1,246 | sqft | chsadmin | 20 |
| 7 | Renovation work of DG cabin 1 st floor New Custom House | Zinc painting Zinc rich paints contain a high level (85percentageto92percentage) of zinc metal pigments which function as an active anticorrosion component. This paint creates a metallic zinc film that acts as a physical barrier as well as providing cathodic protection for the underlying surfaces. appylying coats of paint to the surface surface. | 514 | sqft | chsadmin | 20 |
| 8 | Renovation work of DG cabin 1 st floor New Custom House | P/F of AC power point 5/15 amp with circuit breaker including modular switches, socket, internal box with face plate . 4 sqmmpolycab make wire with PVC conduit of precission make pipe. 1.5 sq mm green earthing wire in the PVC conduit.all complete as per requirement. | 2 | pts | chsadmin | 20 |
| 9 | Renovation work of DG cabin 1 st floor New Custom House | Providing and fixing of customised decorative wall niche with spot and strip lights. Niche a shallow recess or alcove in a wall, used for display or storage. Made out of plywood structure built to the wall as per sizes in standing position. Fixing spot lights to the top of the niche for elegant look. Fixing strip running light with required material etc. | 48 | sqft | chsadmin | 20 |
| 10 | Renovation work of DG cabin 1 st floor New Custom House | Pdg and Fixing of electrical power / light point 5/15 AMP circuit of 2x2.5sqmm including modular switches, socket, internal box with face plate 1.5 SQMM wire green earthing wire in the PVC conduit .all complete with electrical wiring work as per requirement . Existing worn out wiring laying properly and worn out wires covering with cassing patti. Testing , commissioning and using the earthing wires1.5 sq mm green earthing wire in the PVC conduit. Re-shifting the all worn out wires and aligning the same in proper way. all complete as per quirement.(Without lights and fans) | 1 | job | chsadmin | 20 |
| 11 | Renovation work of DG cabin 1 st floor New Custom House | Pdg and fixing customized strip running light with concealed LED light. The strip lights rolled on a spool. unrolling the length of lighting working with, remove the adhesive backing and sticking to the desired surface. Pressing down on each part of the strip so it is firmly adhered to the surface and has no air bubbles. Also providing and fixing drivers to strip light.Lights fixing with concealed wiring work with all eletrical cables, including modular switches and socket etc. | 246 | rft | chsadmin | 20 |
| 12 | Renovation work of DG cabin 1 st floor New Custom House | Customised Wooden Cornice Moulding - It is made wooden cut in proper shape and sizes carefully. Fixing with required tools and material . It thus is an excellent material for cornices as it can be shaped. All complete as per requirement. | 226 | rft | chsadmin | 20 |
| 13 | Renovation work of DG cabin 1 st floor New Custom House | Providing and fixing in position customised Wooden/ PVC frame to the wall. Cutting frames as per shape, design and sizes. Applying the wooden / PVC frames to the wall in rectangular sections with necessary equipments. | 280 | rft | chsadmin | 20 |
| 14 | Renovation work of DG cabin 1 st floor New Custom House | Existing grey colour running frame Scraping the frame with help of sand paper for smoothing and Applying 1coat of grey paint. Filling the gaps, cracks & holes with wax. Again scraping with sand paper and preparing the surface and applying two to three coats of superior quality paint. | 110 | rft | chsadmin | 20 |
Experience Criteria
Past Performance
Bidder Turnover
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | Ashoka Trading co. Under PMA | - | 09-05-2025 10:21:04 | Qualified |
| 2 | Nanak Enterprises Under PMA | - | 15-05-2025 18:21:52 | Qualified |
| 3 | SAMUNDRA ENTERPRISE Under PMA | - | 06-05-2025 13:43:56 | Disqualified |
| 4 | Super Furnitures And Interiors Under PMA | - | 15-05-2025 17:28:04 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | Super Furnitures And Interiors(MSE,MII)( MSE Social Category:General ) Under PMA | ₹9,97,226 | Item Categories : Renovation work,Renovation work of DG cabin,Renovation work of DG cabin 1 st floor New Custom House |
| L2 | Ashoka Trading co. (MII) Under PMA | ₹10,77,598 | Item Categories : Renovation work,Renovation work of DG cabin,Renovation work of DG cabin 1 st floor New Custom House |
| L3 | Nanak Enterprises (MSE,MII)( MSE Social Category:General ) Under PMA | ₹11,16,888 | Item Categories : Renovation work,Renovation work of DG cabin,Renovation work of DG cabin 1 st floor New Custom House |
Please sign in or create an account to view contract details and download result documents.
Key insights about MAHARASHTRA tender market
The eligibility requirements include being a registered entity, having experience in similar renovation projects, and possessing the necessary licenses and certifications to perform the work. Financial stability is also crucial, ensuring the bidder can complete the project without compromising quality.
Bidders need to comply with specific technical specifications outlined in the tender documents. These typically include the type of materials to be used, methods of construction, and adherence to quality standards that ensure safety and longevity of the renovation work.
Bidders are required to submit evidence of their ability to provide a Performance Security following the award of the tender. This security typically amounts to a percentage of the total bid amount and serves as a guarantee for the satisfactory completion of the project.
Bids must be submitted electronically via the designated platform specified in the tender documentation. It's important to follow the specified format for all required documents to ensure compliance with submission requirements.
Yes, there are provisions encouraging the participation of MSEs. These may include simplifications in the bidding process, financial assistance, or other supportive measures aimed at leveling the playing field for smaller entities in government procurements.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS