Bid Publish Date
14-Jul-2026, 9:33 am
Bid End Date
31-Jul-2026, 11:00 am
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Organization: Hmt Machine Tools Limited, under the Department of Heavy Industry. Category: 7.5KW Spindle and axes Control System Package. Estimated Value and EMD details are not disclosed in the provided data. The tender appears to be a government-aligned procurement through GEM with a focus on non-obsolete, 3+ years market-life products. The scope centers on a complete spindle and axes control package, potentially including data sheets, OEM alignment, and GST considerations. A key differentiator is the option clause allowing a ±25% quantity variation at contract; delivery timelines hinge on original period with extensions. Unique terms emphasize data sheet alignment and supplier financial integrity.
7.5KW Spindle and axes Control System Package
Data Sheet to be uploaded and matched with offered parameters
Minimum 3 years residual market life (not end-of-life by OEM)
Experience criterion: 3 years with government/PSU supply
GST handling: applicable GST rates; reimbursement as per actuals or quoted rate
Invoice to consignee with consignee GSTIN
Option to increase quantity by 25% and extension rules with minimum 30 days
Option Clause allows ±25% quantity variation during and after contract
3-year minimum residual market life requirement for bid items
Mandatory data sheet alignment and OEM/authorisation proofs
GST applicability is bidder-responsible; reimbursement as actuals or capped at quoted GST rate
Delivery starts from original delivery order date; extensions computed via (additional/original) × original days; minimum 30 days
Not explicitly stated; standard procurement practice applies; ensure timely delivery per contract and extended timelines
3+ years of regular manufacturing/supply of similar category products to government entities
Not under liquidation or bankruptcy; provide undertaking
Non-obsolete product with 3+ years of market life remaining
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
7.5KW Spindle and axes Control System Package
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Ernakulam
Delivery Pincodes
683503
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Bhargavi Moduguru | 683503,HMT COLONY PO KALMASSERY | Ernakulam | Kerala | 683503 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate
Data Sheet of offered product
Evidence of 3+ years experience supplying similar government products
Contracts/PO copies from Central/State Govt Organizations or PSUs
OEM authorization or reseller agreements
GST/payment related documents as applicable
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and the data sheet for the offered package. Provide OEM authorization, show 3+ years government supply experience, and demonstrate non-obsolete status with 3+ years market life. GST handling follows applicable rates; EMD details align with standard requirements.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, and data sheet matching the offered spindle control package. Include government contract experience certificates for 3+ years, OEM authorization, and contracts showing prior supply to Central/State governments or PSUs.
The tender requires a complete spindle and axes control package with a data sheet; ensure non-obsolete status and 3-year residual market life. While specific IS/ISO standards are not listed, ensure OEM compliance and supplier reliability through government procurement norms.
Delivery terms allow a ±25% quantity variation. The extended delivery time uses (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extensions may apply up to the original period during option execution.
Demonstrate 3 years of regular manufacturing/supply of similar category products to government or PSU entities, with copies of relevant contracts for each year; bidders may rely on primary product value in bunch bids.
Bid submissions must account for GST; reimbursement will be as per actuals or the quoted rate, whichever is lower. Ensure GSTIN details are accurate and invoices reflect consignee details with correct GSTIN.
Upload the Data Sheet of the offered product; it will be matched against technical parameters. Any unexplained mismatch can lead to bid rejection; ensure all key specifications align with the tender’s expectations and OEM capabilities.
Submit PAN, GSTIN, cancelled cheque, and EFT mandate to establish vendor code. Ensure invoices are raised in the consignee name with the consignee GSTIN, and verify data sheets correspond to contracted items.
Sign up now to access all documents
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS