TenderDekho Logo
Active GEM

NTPC Limited Equipment Procurement Tender 2026 for BHARAT HEAVY ELECTRICALS LTD OEM – PDI & 12-Month Warranty

Bid Publish Date

08-Sep-2026, 10:12 am

Bid End Date

18-Sep-2026, 6:00 pm

Generate Docs

Progress

Issue08-Sep-2026, 10:12 am
Corrigendum17-Sep-2026
AwardPending

Tender Overview

NTPC Limited invites bids for an equipment procurement project with BHARAT HEAVY ELECTRICALS LTD as the OEM/vendor option. The BOQ comprises 42 items (details not disclosed) with a firm price basis on FOB Destination Site. Key terms include a 12-month warranty from installation/first use or 18 months from dispatch (whichever is earlier), and a mandatory Pre-Dispatch Inspection (PDI) by NTPC at a reviewed Quality Plan. The supplier must provide HSN code and GST rate within the bid. The purchase may allow quantity variation up to 25% during contract and delivery period, subject to original terms. A single authorized agency may bid if authorized by the OEM. Location details are not disclosed, and the delivery schedule aligns with the contract as per option clause.

Technical Specifications & Requirements

  • OEM requirement: BHE L as the only accepted OEM; other vendors may bid only via a single authorized agency with tender authorization uploaded.
  • Price basis: Firm until delivery; prices include P&F, Freight, Insurance, GST, and all charges; FOB Destination Site terms.
  • Warranty: 12 months from installation/first use or 18 months from dispatch (whichever earlier); no separate warranty certificate required.
  • Interchangeability: Spares must fit existing equipment with no mismatch; no separate certificate needed.
  • PDI: Pre-Dispatch Inspection by NTPC; indicate where PDI will occur.
  • GST/HSN: Vendor must provide HSN code and applicable GST rate included in item price.
  • BOQ: 42 items in total; item-specific quantities not disclosed.
  • Compliance: Interoperability with existing components and adherence to RQP Quality Plan.

Terms, Conditions & Eligibility

  • Quantity variation: Up to ±25% of bid quantity at contract placement and during currency at contracted rates.
  • OEM authorization: Offers from OEM only; authorized agency with OEM permission may bid if tender authorization is uploaded.
  • Warranty/guarantee: As specified (12 months from installation or 18 months from dispatch).
  • PDI requirement: PDI by NTPC; bidder must state PDI location in offer.
  • GST/HSN: Must provide GST rate and HSN code included in item pricing.
  • Payment terms: Not explicitly stated; price basis is firm and inclusive of all charges; delivery schedule tied to delivery orders.
  • Documentation: OEM authorization, GST/HSN details, quality plan compliance, and installation/first-use warranty terms are required.

Key Specifications

  • OEM requirement: Only BHARAT HEAVY ELECTRICALS LTD (or single authorized agency with OEM authorization) for the 42-item BOQ

  • Price basis: Firm unit basic price inclusive of P&F, Freight, Insurance, GST, and all charges; FOB Destination Site

  • Warranty: 12 months from date of installation/first use or 18 months from dispatch, whichever earlier

  • Interchangeability: Spares must be interchangeable with existing components; no separate certificate required

  • PDI: Pre-Dispatch Inspection by NTPC; location and acceptance criteria per Quality Plan (RQP)

  • GST/HSN: Vendor to provide HSN code and applicable GST rate included in item price

  • Delivery/variation: Option clause permits up to 25% quantity variation during contract period

  • BOQ: 42 items; item-wise quantities not disclosed; Bidders to conform to delivery per PO terms

Terms & Conditions

  • Option Clause: up to 25% quantity increase/decrease at contracted rates during or after award

  • OEM authorization: only M/s. Bharat Heavy Electricals Ltd or a single authorized agency with uploaded authorization

  • Warranty: 12 months from installation or 18 months from dispatch; no separate warranty certificate required

Important Clauses

Payment Terms

Firm price until delivery inclusive of P&F, Freight, Insurance, GST; price basis is FOB Destination Site; no additional price adjustments stated

Delivery Schedule

Delivery tied to original PO terms with option-based quantity changes; extended delivery time calculated as (additional quantity/original quantity) × original period, minimum 30 days

Penalties/Liquidated Damages

Not explicitly specified in data;برى penalties would be per contract terms and PDI/quality Plan outcomes

Bidder Eligibility

  • Bidder must be OEM-authorized for BHARAT HEAVY ELECTRICALS LTD or be a single authorized agency with tender authorization uploaded

  • Demonstrate capability to perform PDI as per NTPC Quality Plan

  • Provide GSTIN, HSN code, and GST rate in pricing for all items

Tender Data

Bid Details

Quantity

135

Category

M1837119920

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

M1837119920 , M3798121220 , M3799068122 , M3799991300 , M3799992513 , M3799993503 , M3799995303 , M3799995305 , M3799996508 , M3799995312 , M3799996005 , M3799996008 , M3799996009 , M3799996101 , M3799996103 , M3799996104 , M3799996107 , M3799996108 , M4721016029 , M3799996914 , M4624050048 , M4624050463 , M4624050484 , M4624350404 , M4624050488 , M4624050750 , M4624056994 , M4725076029 , M4624350490 , M4725020039 , M4624356031 , M4624356295 , M4725040089 , M4724156007 , M4724576016 , M4725076057 , M4725756002 , M4624050485 , M4721020050 , M4726126415 , M4726126463 , M4525106147

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Muzaffarpur

Delivery Pincodes

843130

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Hem Chandra Roy843130,KANTI BIJLEE UTPADAN NIGAM LIMITED KBUNL, KANTI THERMAL, ADMIN BUILDING, KBUNL, KANTI, BiharMuzaffarpurBihar8431302180-

Authority Records

MINISTRY OF POWERNTPC LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9850970.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Ntpc Limited

Department

NA

Office Name

Cpg 03 Ntpc Simhadri

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

17-Sep-2026

Extended Deadline

18-Sep-2026, 12:30 pm

Opening Date

19-Sep-2026, 12:30 pm

Bill of Quantities (BOQ) 42 Items Sign in for GEM prices

#10

M1837119920

as per tech. datasheet

2 no Delivery: 180 days
#20

M3798121220

as per tech. datasheet

4 no Delivery: 180 days
#30

M3799068122

as per tech. datasheet

1 no Delivery: 180 days
#40

M3799991300

as per tech. datasheet

4 no Delivery: 180 days
#50

M3799992513

as per tech. datasheet

2 no Delivery: 180 days
#60

M3799993503

as per tech. datasheet

2 no Delivery: 180 days
#70

M3799995303

as per tech. datasheet

2 no Delivery: 180 days
#80

M3799995305

as per tech. datasheet

1 no Delivery: 180 days
#90

M3799996508

as per tech. datasheet

2 no Delivery: 180 days
#100

M3799995312

as per tech. datasheet

12 no Delivery: 180 days
#110

M3799996005

as per tech. datasheet

1 no Delivery: 180 days
#120

M3799996008

as per tech. datasheet

2 no Delivery: 180 days
#130

M3799996009

as per tech. datasheet

10 no Delivery: 180 days
#140

M3799996101

as per tech. datasheet

1 no Delivery: 180 days
#150

M3799996103

as per tech. datasheet

1 no Delivery: 180 days
#160

M3799996104

as per tech. datasheet

1 no Delivery: 180 days
#170

M3799996107

as per tech. datasheet

6 no Delivery: 180 days
#180

M3799996108

as per tech. datasheet

10 no Delivery: 180 days
#190

M4721016029

as per tech. datasheet

2 no Delivery: 180 days
#200

M3799996914

as per tech. datasheet

4 no Delivery: 180 days
#210

M4624050048

as per tech. datasheet

4 no Delivery: 180 days
#220

M4624050463

as per tech. datasheet

3 no Delivery: 180 days
#230

M4624050484

as per tech. datasheet

1 no Delivery: 180 days
#240

M4624350404

as per tech. datasheet

2 no Delivery: 180 days
#250

M4624050488

as per tech. datasheet

2 no Delivery: 180 days
#260

M4624050750

as per tech. datasheet

2 no Delivery: 180 days
#270

M4624056994

as per tech. datasheet

4 no Delivery: 180 days
#280

M4725076029

as per tech. datasheet

4 no Delivery: 180 days
#290

M4624350490

as per tech. datasheet

4 no Delivery: 180 days
#300

M4725020039

as per tech. datasheet

1 no Delivery: 180 days
#310

M4624356031

as per tech. datasheet

2 no Delivery: 180 days
#320

M4624356295

as per tech. datasheet

4 no Delivery: 180 days
#330

M4725040089

as per tech. datasheet

2 no Delivery: 180 days
#340

M4724156007

as per tech. datasheet

7 no Delivery: 180 days
#350

M4724576016

as per tech. datasheet

3 no Delivery: 180 days
#360

M4725076057

as per tech. datasheet

2 no Delivery: 180 days
#370

M4725756002

as per tech. datasheet

1 no Delivery: 180 days
#380

M4624050485

as per tech. datasheet

2 no Delivery: 180 days
#390

M4721020050

as per tech. datasheet

10 no Delivery: 180 days
#400

M4726126415

as per tech. datasheet

2 no Delivery: 180 days
#410

M4726126463

as per tech. datasheet

2 no Delivery: 180 days
#420

M4525106147

as per tech. datasheet

1 no Delivery: 180 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar equipment procurements

4

Financial statements or turnover evidence

5

EMD documentation (if applicable under terms)

6

Technical bid documents showing OEM authorization (BHARAT HEAVY ELECTRICALS LTD or authorized agency)

7

Tender authorization/upload from OEM for authorized agency bids

8

Quality Plan compliance documents and PDI framework

9

HSN code and GST rate declaration for each item

10

Any certification demonstrating interchangeability of spares

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid in NTPC tender for BHEL equipment in 2026?

Bidders must be OEM-authorized for BHARAT HEAVY ELECTRICALS LTD or bid via a single authorized agency with OEM authorization uploaded. Provide GSTIN, HSN codes, and a firm FOB Destination price including P&F, Freight, and Insurance. Ensure PDI details are disclosed and the warranty terms (12 months installation/18 months dispatch) are acknowledged.

What documents are required for NTPC 42-item BOM tender in 2026?

Submit GST certificate, PAN, experience certificates for similar procurements, financial statements, OEM authorization or agency authorization, PDI/Quality Plan declarations, HSNs and GST rates, and evidence of interchangeability compliance. Include warranty terms and proposed delivery schedule aligned with PO terms.

What are the technical warranty terms for NTPC OEM equipment tender?

Warranty is 12 months from installation/first use or 18 months from dispatch, whichever occurs earlier. No separate warranty certificate is required; warranty terms bind the supplier and align with RQP Quality Plan and PDI acceptance by NTPC.

What is the price basis and delivery terms in NTPC tender 2026?

Prices must be firm till delivery, inclusive of P&F, Freight, Insurance, GST and all charges. Terms are FOB Destination Site; bidders must indicate PDI locations and ensure quantities align with original and any 25% variation clause.

How does the option clause affect delivery in NTPC procurement?

The purchaser may increase/decrease bid quantity by up to 25% at contract, and extend delivery by a proportional period; for extended times, minimum 30 days applies if original delivery is <=30 days, with calculations based on (increased quantity/original quantity) × original period.

What are the OEM authorization requirements for this NTPC tender?

Offers must be from Bharat Heavy Electricals Ltd or from a single authorized agency with OEM authorization uploaded. Other bidders are rejected unless they provide compliant OEM authorization; ensure RQP adherence and PDI readiness.