TenderDekho Logo
Active GEM

Procurement Opportunity: Title1-405nm 100mW Laser,Title2-405nm Laser Remote with DC Power Supply and Power Cord,Title3-405nm in WARANGAL, TELANGANA

Bid Publish Date

21-Aug-2026, 2:43 pm

Bid End Date

11-Sep-2026, 3:00 pm

EMD

₹28,000

Progress

Issue21-Aug-2026, 2:43 pm
AwardPending

National Institute Of Technology (nit) has released a public tender for Title1-405nm 100mW Laser, Title2-405nm Laser Remote with DC Power Supply and Power Cord, Title3-405nm Laser Heat Sink with Integrated Cooling Fan, Title4-50mW, 808nm Fiber-Coupled Laser, Title5-Fiber Collimator with FC or PC Connector, Title6-Single Mode Patchcord, FC or PC, 0. 13NA, 780-970nm, 2m, Title7-1x2 Fiber Coupler, 980nm, 50 ratio 50, FC or APC in WARANGAL, TELANGANA. Quantity: 10. Submission Deadline: 11-09-2026 15: 00: 00. Download documents and apply online.

Tender Data

Bid Details

Quantity

10

Category

Title1-405nm 100mW Laser

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

6

OEM Avg. Turnover

27

Past Performance

50 %

Warranty Period

1 years

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Title1-405nm 100mW Laser , Title2-405nm Laser Remote with DC Power Supply and Power Cord , Title3-405nm Laser Heat Sink with Integrated Cooling Fan , Title4-50mW, 808nm Fiber-Coupled Laser , Title5-Fiber Collimator with FC or PC Connector , Title6-Single Mode Patchcord, FC or PC, 0.13NA, 780-970nm, 2m , Title7-1x2 Fiber Coupler, 980nm, 50 ratio 50, FC or APC

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

14

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Hanumakonda

Delivery Pincodes

506004

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sourabh Roy506004,NATIONAL INSTITUTE OF TECHNOLOGY WARANGALHanumakondaTelangana506004160-

Authority Records

MINISTRY OF EDUCATIONHIGHER EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9771865.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

Title1-405nm 100mW Laser

405nm 100mW Laser

1 quantity Delivery: 60 days
#2

Title2-405nm Laser Remote with DC Power Supply and Power Cord

405nm Laser Remote w/DC Power Supply and Power Cord

1 quantity Delivery: 60 days
#3

Title3-405nm Laser Heat Sink with Integrated Cooling Fan

405nm Laser Heat Sink w/ Integrated Cooling Fan

1 quantity Delivery: 60 days
#4

Title4-50mW, 808nm Fiber-Coupled Laser

50mW, 808nm Fiber-Coupled Laser

1 quantity Delivery: 60 days
#5

Title5-Fiber Collimator with FC or PC Connector

Fiber Collimator w/FC/PC Connector

3 quantity Delivery: 60 days
#6

Title6-Single Mode Patchcord, FC or PC, 0.13NA, 780-970nm, 2m

Single Mode Patchcord, FC/PC, 0.13NA, 780-970nm, 2m

2 quantity Delivery: 60 days
#7

Title7-1x2 Fiber Coupler, 980nm, 50 ratio 50, FC or APC

1x2 Fiber Coupler, 980nm, 50 ratio 50, FC/APC

1 quantity Delivery: 60 days

Categories 12

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

OEM Authorization Certificate

5

OEM Annual Turnover

6

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer