TenderDekho Logo
Closed GEM

Indian Army Gymnastics PT Mat, 55 Inch Display Boards, Solar Lanterns Tender Tinsukia Assam 2026

Bid Publish Date

12-Aug-2026, 5:41 pm

Bid End Date

22-Aug-2026, 6:00 pm

Progress

Issue12-Aug-2026, 5:41 pm
AwardPending

Key Highlights

  • Product categories spanning gymnastics equipment, digital display, solar lighting, power backup, and signage
  • 25% quantity variation rights during and after contract; extended delivery period calculation method
  • Inspection before acceptance; 100% new and genuine products; installation and testing included
  • Must provide Make/Brand/Model with technical datasheets; OEM authorizations may be required

Tender Overview

The Indian Army (Department Of Military Affairs) solicits bids for multiple product categories, including Gymnastics PT Mat, 55 Inch VU electronic display boards, Solar Lanterns, Inverters with Battery, and Acrylic Sign Boards, to be procured under a single tender. The location is Tinsukia, ASSAM with a 786125 postal code. The BOQ lists 5 items, though itemwise quantities are not disclosed. The tender includes a flexible quantity option: up to 25% increase in bid quantity at contracted rates, with delivery timing linked to the last delivery order date and extended periods calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. A key differentiator is the integrated delivery, installation, testing, and warranty expectations across five heterogeneous product lines.

Technical Specifications & Requirements

  • Product categories: Gymnastics PT Mat, 55 Inch VU display boards, Solar Lanterns, Inverter with Battery, Acrylic Sign Board.
  • Inspectorate: Items are subject to Buyer/Inspection Committee verification prior to acceptance.
  • Make/Model data: Bidder must submit Make, Brand, Model, and technical datasheets/catalogues wherever applicable.
  • Installation & testing: Supplier to provide installation, testing, and demonstration at no extra cost; supports warranty coverage and accessories/documents per contract.
  • Warranty & compliance: All items to carry required warranty; replacement at supplier cost for non-conformities; no changes to Make/Model without Buyer approval.
  • Service support: Dedicated/toll-free service number required for bidders/OEM.
  • Delivery location: Delivery/installation address listed as Tilam, Walong, AR (Arunachal region).

Terms, Conditions & Eligibility

  • Quantity flexibility: Purchaser may increase/decrease quantity by up to 25% during contract and currency, with delivery period adjustments as defined.
  • Documentation: Bidders must provide Make/Model data, technical datasheets, and ensure 100% new, genuine products per technical specifications.
  • Inspection: Items are subject to inspection and acceptance by Buyer/Inspection Committee.
  • Non-conformance: Defective/damaged items must be replaced at the supplier’s cost; installation/testing/demonstration at no extra charge.
  • Warranty/Access: Items must include warranty and necessary accessories/documents; service support number must be provided by bidder/OEM.
  • ATC acceptance: Submission of bid implies acceptance of all ATC terms and conditions including rejection rights under GeM terms.

Key Specifications

  • Product categories: Gymnastics PT Mat; 55 Inch VU electronic display boards; Solar Lanterns; Inverter with Battery; Acrylic Sign Board

  • Delivery address: Tilam, Walong, AR (Arunachal region) as per ATC

  • Inspection: Buyer/Inspection Committee prior to acceptance

  • Warranty: As per Bid/Contract; replacement for non-conformity at supplier cost

  • Installation: Included with no additional cost to Buyer

  • Service: Dedicated toll-free support number required for OEM/bidder

Terms & Conditions

  • EMD: Not explicitly specified in provided data; bidders should confirm

  • Delivery: Option to increase quantity by 25%; delivery period defined by last original delivery date

  • Inspection & warranty: All items inspected; replacement at supplier cost for defects

Important Clauses

Payment Terms

Not specified in data; bidders should verify in procurement documents

Delivery Schedule

Delivery starts after last date of original delivery order; extended time proportional to quantity variation with minimum 30 days

Penalties/Liquidated Damages

Not explicitly stated; terms indicate adherence to ATC and GeM terms with rejection rights

Bidder Eligibility

  • Submit 100% new, unused, genuine products

  • Provide Make/Brand/Model with datasheets

  • Pass inspection by Buyer/Inspection Committee

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

22

Category

Gymnastics PT Mat

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

30 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Gymnastics PT Mat , VU Electronic Display Boards 55 Inch , Solar Lanterns , Inverter with Battery , Acrylic Sign Board

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Tinsukia

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-TinsukiaTinsukia--215-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9744212.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Gymnastics PT Mat

Gymnastics PT Mat

2 nos Delivery: 15 days
#2

VU Electronic Display Boards 55 Inch

VU Electronic Display Boards 55 Inch

2 nos Delivery: 15 days
#3

Solar Lanterns

Solar Lanterns

4 nos Delivery: 15 days
#4

Inverter with Battery

Inverter with Battery

2 set Delivery: 15 days
#5

Acrylic Sign Board

Acrylic Sign Board

12 nos Delivery: 15 days

Categories 14

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar procurements

4

Financial statements (audited, if available)

5

EMD/Security deposit document (as applicable)

6

Technical bid documents and product datasheets

7

OEM authorization/certification documents (where applicable)

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid for Indian Army tender in Tinsukia Assam 2026

To bid, ensure you submit 100% new products, provide Make/Model with datasheets, and comply with inspection requirements. Include warranty details, install/testing services, and a dedicated service number. Verify delivery to Tilam, Walong, AR and align with the 25% quantity option during contract.

What documents are required for Army equipment tender in Assam

Required documents include GST certificate, PAN card, financial statements, experience certificates for similar work, EMD documentation, technical bid with datasheets, and OEM authorizations if applicable. Ensure inspection readiness and warranty coverage per contract terms.

What are the technical specifications for the 55 inch display board bid

Although exact specs are not listed, bidders must provide Make, Brand, Model, and datasheets for the 55 Inch VU display boards. Items will be inspected before acceptance; supplier must demonstrate installation and testing at no extra cost and provide required accessories.

How is delivery time calculated for quantity variation in this tender

Delivery time follows the last date of the original delivery order. If quantity increases, extended time equals (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days, and may extend up to the original delivery period.

What are the warranty and post-delivery support expectations

Warranty is required for all items; defective/damaged products must be replaced at supplier cost. Installation, testing, and demonstration are included, and a dedicated toll-free service line must be provided by the bidder/OEM for ongoing support.

What is the inspection process for Army procurement items in Arunachal region

The Buyer/Inspection Committee will inspect all items before acceptance. Suppliers must provide authentic products, datasheets, and ensure conformity to stated standards. Non-conforming items are subject to replacement at supplier cost.

What is the submission process for Make/Model data and datasheets

Bidders must submit Make, Brand, Model, and technical datasheets/catalogues wherever applicable. This aligns with ATC clauses requiring 100% new, genuine products and enables verification during inspection by the Buyer.