HPCL Rajasthan Refinery Limited Gaskets Rate Contract Tender Barmer Rajasthan 2026

Bid Publish Date

04-Mar-2026, 4:51 pm

Bid End Date

14-Mar-2026, 5:00 pm

Progress

RA
Issue04-Mar-2026, 4:51 pm
Reverse AuctionCompleted
Award25-Apr-2026, 6:39 pm
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 6

Tender Overview

HPCL Rajasthan Refinery Limited invites bids for a Rate Contract for Gaskets at Barmer, Rajasthan (344001). The procurement is a standing order/rate contract where actual quantities will be intimated post-order. The contract spans 2 years from PO placement, with an indicative minimum delivery window of 5 weeks from the indent. The clause allows a +/- 25% quantity variation during both initial placement and currency of contract at contracted rates. This opportunity favors suppliers with flexible batching and reliable gasket supply capabilities. Bidders must align with the integrity pact and Excel-based rate upload process. Unique aspects include the need to harmonize SOR break-up with the final quoted price and the indication that item quantity is business-requirement driven rather than fixed.

Technical Specifications & Requirements

  • Category: Rate Contract for Gaskets (no itemized BOQ available) and indicative single-quantity tender line
  • Delivery window: 5 weeks from date of indent/release order by HRRL; contract validity: 2 years from PO placement
  • Quantity variation: up to 25% increase/decrease allowed at contracted rates during both initial and extended periods
  • Order mechanism: Standing Order / Rate Contract; actual quantities released via Release Order/Indent by HRRL EIC
  • Pricing submission: Quoted rates via Excel uploader with uniform application across all Schedule of Rates (SOR); discrepancies resolved by final financial bid totals
  • Documentation: Compliance with Integrity Pact; submission of signed pact alongside bid
  • Disclaimer: 1 initial indicative quantity; final orders issued as per business requirement

Terms, Conditions & Eligibility

  • Contract period: 2 years from PO placement; indent delivery window of 5 weeks
  • EMD/Financials: Terms require standard bid security and financial documents per T&C; exact EMD amount not disclosed
  • Delivery terms: Deliveries scheduled per indent; earliest delivery within 5 weeks
  • Integrity Pact: Signed copy to be uploaded; organization-specific compliance required
  • Bid process: Excel-based SOR with uniform percentage adjustments; financial bid governs final price
  • Vendor scope: Rates must be consistent with SOR break-up; mismatched sheets may lead to rejection

Key Specifications

  • Category: Rate Contract for Gaskets with indicative quantity

  • Delivery: within 5 weeks from indent/Release Order by HRRL

  • Contract duration: 2 years from PO placement

  • Quantity variation: +/-25% during initial and currency period

  • Pricing: Excel uploader with uniform % application across all SOF items

  • Documentation: Upload signed Integrity Pact

Terms & Conditions

  • 2-year contract tenure from PO placement with 5-week delivery on indents

  • Quantity amendments allowed up to 25% at contracted rates

  • Integrity Pact mandatory and to be uploaded with bid

  • Excel-based rate submission; ensure SOR break-up matches financial bid

  • Actual quantities will be issued via Release Order/Indent by HRRL EIC

Important Clauses

Payment Terms

Not disclosed; payments processed per contract PO and standard government terms

Delivery Schedule

Delivery must occur within 5 weeks from each indent/release order; initial contract period spans 2 years

Penalties/Liquidated Damages

Not detailed in provided terms; likely governed by standard HRRL/HPCL procurement policies

Bidder Eligibility

  • Registered gasket supplier with experience in supply of seals/fasteners

  • Demonstrated ability to handle rate contracts and bulk deliveries

  • Compliance with Integrity Pact and Excel-based pricing submission

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Rate Contract for Gaskets

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9076195.pdf

Main Document

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for gasket supply

4

Financial statements (latest audited) or turnover proof

5

EMD/Security depositДокuments (as specified in T&C)

6

Technical bid documents and drawings (if any)

7

OEM authorizations or manufacturer credentials (where applicable)

8

Signed Integrity Pact (as per Buyer policy)

Reverse Auction Schedule

Completed

Start

29-Mar-2026, 1:00 pm

End

30-Mar-2026, 1:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1ASIAN SEALING PRODUCTS PRIVATE LIMITED(MSE,MII)   Under PMA Winner ₹81,25,716Item Categories : Rate Contract for Gaskets
L2B J & P ENGINEERS PRIVATE LIMITED (MII)   Under PMA₹81,42,000Item Categories : Rate Contract for Gaskets
L3IGP ENGINEERS PRIVATE LIMITED (MII)   Under PMA₹82,60,000Item Categories : Rate Contract for Gaskets

🎉 L1 Winner

ASIAN SEALING PRODUCTS PRIVATE LIMITED(MSE,MII)   Under PMA

Final Price: ₹81,25,716

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about RAJASTHAN tender market

How to bid on HPCL gasket rate contract in Barmer Rajasthan 2026

Bidders must submit GST, PAN, experience certificates, financials, and EMD with a signed Integrity Pact. Pricing should be uploaded via the Excel uploader, applying uniform percentage changes across the SOR. Deliveries follow indent orders with a 5-week lead time, under a 2-year contract.

What documents are required for gasket tender submission in Barmer

Submit GST registration, PAN, experience certificates for gasket supply, audited financial statements, EMD documentation, OEM authorizations if applicable, technical bid documents, and the signed Integrity Pact. Ensure all documents are valid and current for bid evaluation.

What are the delivery and quantity terms for this gasket contract

Delivery must occur within 5 weeks from each indent; quantity may vary by ±25% both at initial placement and during the contract period. The contract duration is 2 years from PO, with releases issued as per business needs by HRRL EIC.

Which standards or certifications are required for gasket suppliers

While explicit standards aren’t listed, bidders should maintain integrity pact compliance and general quality controls. OEM authorizations may be required for branded gaskets, and suppliers should prepare any applicable certification documentation for evaluation.

How is pricing evaluated under the SOR bid submission

Prices must be uploaded via the Excel uploader; a uniform percentage adjustment applies to all items in the SOR. If discrepancies arise between the SOR breakdown and the financial bid, the financial bid total governs evaluation.

When is the contract period and what delivery terms apply

The contract extends 2 years from PO placement. Deliveries are made as per indent, with each delivery window limited to 5 weeks from the indent date; quantity changes are permitted within 25% of the bid quantity.

What is the significance of the Integrity Pact in this gasket tender

An Integrity Pact is mandatory; bidders must upload a signed copy as per buyer policy. This ensures anti-corruption assurances and aligns with HPCL HRRL procurement ethics throughout the 2-year contract.

What is the role of HRRL EIC in releases for gasket orders

HRRL EIC issues Release Orders/Indents to determine actual quantities and timing. Suppliers should be prepared to fulfill orders promptly within the 5-week delivery window once indent/Release Order is issued.