TenderDekho Logo
Active GEM

Bharat Heavy Electricals Limited Hook Assemblies Tender 40 MT 8 Fall Ramshorn IS 5749-1970 2026

Bid Publish Date

18-Jul-2026, 8:42 am

Bid End Date

03-Aug-2026, 3:00 pm

Generate Docs

Progress

Issue18-Jul-2026, 8:42 am
Corrigendum27-Jul-2026
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

2

Category

Main hook-40 MT 8 fall Ramshorn hook assembly with equalizer pulley assembly (IS 5749-1970)

Bid Type

Two Packet Bid

Key Highlights

  • IS 5749-1970 standard compliance for hook assemblies
  • Quantitative option clause allowing ±25% quantity variation
  • Delivery time adjustments based on formula with minimum 30 days
  • Scope explicitly states 'Only supply of Goods' (no services)
  • Bidder must review Buyer uploaded ATC document for special terms
  • Primary equipment: 40 MT 8 fall Ramshorn hook with equalizer pulley
  • Secondary equipment: 10 MT 4 fall shank hook with equalizer pulley
  • No BOQ items specified; emphasis on product conformity and delivery
  • Bidder to demonstrate capability to supply IS 5749-1970 compliant hooks

Categories 7

Tender Overview

Organization: Bharat Heavy Electricals Limited (BHEL) under the Department of Heavy Industry. Product/Service: Main hook assemblies (40 MT, 8 fall Ramshorn hook with equalizer pulley) and Auxiliary hook assemblies (10 MT, 4 fall shank type with equalizer pulley) compliant with IS 5749-1970. Quantity/Value: Not disclosed; scope is for the supply of goods only. Location: India. Key differentiator: Specific IS standard conformance for heavy-duty lifting hooks; procurement focuses on precise hoisting equipment configurations. Unique aspects: Bid terms include quantity variation up to 25% during and after contract formation and extended delivery timing rules.

Technical Specifications & Requirements

  • BOQ items: No items listed; data indicates only product specification from the title (IS 5749-1970) for Ramshorn and shank type hooks.
  • Products:
    • Main hook assembly: 40 MT, 8 fall Ramshorn type with equalizer pulley
    • Auxiliary hook assembly: 10 MT, 4 fall shank type with equalizer pulley
  • Standards/Compliance: IS 5749-1970 for hook assemblies.
  • Delivery/Scope: Only supply of goods; no service components indicated; bid must cover all cost components.
  • Qualification: Technical capability to provide hoisting hook assemblies meeting the specified IS standard; documentation to prove compliance required.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity up to 25% of bid quantity at contract, with adjustments to delivery period calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • Delivery: Delivery period rules apply from last date of original delivery order; extended period follows the option clause.
  • Payment/Scope: Scope of supply is limited to goods; no services included.
  • EMD/Documentation: No explicit EMD amount listed; bidders must comply with standard supply-only procurement terms and provide requisite documentation as per buyer ATC.
  • ATC/ATC Document: A dedicated ATC file is referenced; bidders should review for any additional conditions.

Key Specifications

  • Main hook assembly: 40 MT, 8 fall Ramshorn with equalizer pulley

  • Auxiliary hook assembly: 10 MT, 4 fall shank with equalizer pulley

  • Standard: IS 5749-1970

  • Delivery scope: Goods only (no services)

  • Quantity variation: ±25% with delivery-time adjustment formula

Terms & Conditions

  • Quantity may vary by up to 25% at contract award and during currency

  • Delivery period recalculated based on increased quantity; minimum 30 days

  • Scope limited to supply of goods; no installation or after-sales service specified

Important Clauses

Payment Terms

Not explicitly defined; payment terms to be as per ATC and standard government procurement practices

Delivery Schedule

Delivery period commences from last date of original delivery order; extended delivery period applies during option exercise

Penalties/Liquidated Damages

Not specified in provided data; bidders should verify in ATC document

Bidder Eligibility

  • Experience in supplying heavy-duty lifting gear (hook assemblies) to public or private sectors

  • Demonstrated capability to supply IS 5749-1970 compliant equipment

  • GST registration and financial stability sufficient for procurement norms

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Main hook-40 MT 8 fall Ramshorn hook assembly with equalizer pulley assembly (IS 5749-1970) , Auxiliary Hoist hook type-10 MT 4 fall shank type hook assembly with equalizer pulley assembly

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

56

Delivery Locations

1

Delivery Cities

Amethi

Delivery Pincodes

227809

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Alok Pandey227809,Industrial Area Jagdishpur District AmethiAmethiUttar Pradesh227809156-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENTBHARAT HEAVY ELECTRICALS LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9625741.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent account number (PAN) card

3

Experience certificates for similar hoisting equipment supply

4

Financial statements demonstrating- turnover as applicable

5

EMD documentation (as required per ATC) and payment terms

6

Technical compliance certificates showing IS 5749-1970 conformity

7

OEM authorizations or manufacturer credentials (if applicable)

8

Any required safety and quality certifications related to lifting gear

Corrigendum Updates

2 Updates
#1

Update

27-Jul-2026
#2

Update

27-Jul-2026

Extended Deadline

03-Aug-2026, 3:00 pm

Opening Date

03-Aug-2026, 3:30 pm

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for IS 5749-1970 hook assemblies tender in India 2026

Bidders must submit GST registration, PAN, experience certificates, financial statements, and EMD per ATC. Ensure IS 5749-1970 compliance with Ramshorn and shank hooks, and review the ATC for any special terms. Delivery terms allow ±25% quantity variation with formula-based time extension.

What documents are required for BHEL lifting gear tender 2026

Required documents include GST certificate, PAN card, experience certificates for similar supply, financial statements, EMD, technical compliance certificates proving IS 5749-1970 conformity, and OEM authorizations if applicable. Ensure submission aligns with ATC specifications.

What are the technical specifications for 40 MT Ramshorn hook

Specifications specify 40 MT capacity, 8 fall Ramshorn configuration with an equalizer pulley. Conformity to IS 5749-1970 is mandatory. No BOQ items provided; emphasize product conformity and documented proof of compliance in bid documents.

When is delivery time adjusted for quantity changes in this tender

Delivery time adjusts using (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend delivery to match original delivery period during option exercise.

What is the scope of supply for this BHEL tender

Scope explicitly states 'Only supply of Goods' with no installation or service components. Bidders must include all costs for delivery and handling in bid price as per ATC terms.

What standards must be met for the auxiliary hook assembly

Auxiliary hook assembly must be 10 MT, 4 fall shank type with equalizer pulley and conform to IS 5749-1970. Provide corresponding compliance certificates and OEM authorizations in submission.

What is the eligibility criterion for turnover in this bid

Data does not specify a fixed turnover; bidders should demonstrate financial stability per standard procurement norms and provide financial statements as part of bid submission per ATC.

How to obtain the ATC document for this tender

Click the ATC link in the tender page to view the file. Review all added terms, safeguards, and any special requirements. Ensure compliance with IS 5749-1970 and provide required documentation accordingly.