Bid Publish Date
12-Aug-2026, 1:35 pm
Bid End Date
25-Aug-2026, 2:00 pm
Value
₹2,00,000
Location
Progress
Uttar Pradesh Power Corporation Limited (uppcl) announces a tender for Centrifuging of line reactor, Centrifuging of NGR, various testing, test1, test2, test3, test4, oil leakage attending work, evacuationaand drying in SULTANPUR, UTTAR PRADESH. Quantity: 48. Submission Deadline: 25-08-2026 14: 00: 00. Last date to apply is approaching fast!
Quantity
48
Category
Centrifuging of line reactor
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1
OEM Avg. Turnover
1
Past Performance
10 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Centrifuging of line reactor , Centrifuging of NGR , various testing , test1 , test2 , test3 , test4 , oil leakage attending work , evacuationaand drying
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Sultanpur
Delivery Pincodes
228001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Rajesh Mithailal Jaiswal. | 228001,ELECTRICITY 400 KV SUB STATION PAYAGIPUR SULTANPUR- 228001 | Sultanpur | Uttar Pradesh | 228001 | 36 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Centrifuging of line reactor
Centrifuging of old and used transformer oil of the 400 kV, 50 MVAR Line Reactor by ultra-high vacuum filtration machine till the transformer oil regains the standard range of BDV, PPM, DGA, etc. at 400 kV Substation, Sultanpur, including all associated works.
Centrifuging of NGR
Centrifuging of old and used transformer oil of the 1.5 MVAR (NGR) installed with the 50 MVAR Line Reactor by an ultra-high vacuum filtration machine till the transformer oil regains the standard range of BDV, PPM, at 400 kV Substation, Sultanpur, including all associated works.
various testing
Testing of Centrifuged T/F Oil From Govt. approved laboratory 50 MVAR Line Reactor including collection of oil sample from the site, with all necessary labour, T&P, before & after Cenrtifuging of T/F oil.
test1
B.D.V
test2
Water Content.
test3
D.G.A
test4
Dielectric Dissipation Factor.
oil leakage attending work
Stoppage of oil leakage by using high quality sealant and resin based epoxy compound (Steel Hardener) from 50MVAR line reactor and 1.5MVAR NGR.
evacuationaand drying
Complete Evacuation of old 50 MVAr Reactor Main Tank (Aprox 31kl) and filling of N2 At Dew point
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Centrifuging of line reactor | Centrifuging of old and used transformer oil of the 400 kV, 50 MVAR Line Reactor by ultra-high vacuum filtration machine till the transformer oil regains the standard range of BDV, PPM, DGA, etc. at 400 kV Substation, Sultanpur, including all associated works. | 36 | kl | ac@sultanpur@123 | 30 | |
| 2 | Centrifuging of NGR | Centrifuging of old and used transformer oil of the 1.5 MVAR (NGR) installed with the 50 MVAR Line Reactor by an ultra-high vacuum filtration machine till the transformer oil regains the standard range of BDV, PPM, at 400 kV Substation, Sultanpur, including all associated works. | 5 | kl | ac@sultanpur@123 | 30 | |
| 3 | various testing | Testing of Centrifuged T/F Oil From Govt. approved laboratory 50 MVAR Line Reactor including collection of oil sample from the site, with all necessary labour, T&P, before & after Cenrtifuging of T/F oil. | 1 | job | ac@sultanpur@123 | 30 | |
| 4 | test1 | B.D.V | 1 | job | ac@sultanpur@123 | 30 | |
| 5 | test2 | Water Content. | 1 | job | ac@sultanpur@123 | 30 | |
| 6 | test3 | D.G.A | 1 | job | ac@sultanpur@123 | 30 | |
| 7 | test4 | Dielectric Dissipation Factor. | 1 | job | ac@sultanpur@123 | 30 | |
| 8 | oil leakage attending work | Stoppage of oil leakage by using high quality sealant and resin based epoxy compound (Steel Hardener) from 50MVAR line reactor and 1.5MVAR NGR. | 1 | meter | ac@sultanpur@123 | 30 | |
| 9 | evacuationaand drying | Complete Evacuation of old 50 MVAr Reactor Main Tank (Aprox 31kl) and filling of N2 At Dew point | 1 | job | ac@sultanpur@123 | 30 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer