Bid Publish Date
26-Mar-2026, 2:29 pm
Bid End Date
01-Sep-2026, 9:00 am
Location
Progress
Organization: Nlc India Limited. Product/Service: survival fire blanket (Q3). Location: CUDDALORE, TAMIL NADU – 605106. Category: Survival Fire Blanket (Q3). Scope indicates Only supply of Goods with no BOQ items published. No explicit quantity or estimated value provided. The procurement emphasizes delivery terms under an option clause allowing up to 25% quantity variation and adjustable delivery periods. The tender requires adherence to certificate uploads and OEM warranty, plus post‑sales service accessibility in India. Unique aspects include a built‑in option for quantity flexing and a requirement for installation, commissioning, and service support post‑delivery where applicable. This creates a focus on rapid procurement readiness and a robust after‑sales framework. The tender’s emphasis on supplier compliance and delivery flexibility distinguishes it from standard fixed‑quantity solicitations.
Product/service names: survival fire blanket (Q3)
Quantities: not specified in data; bidder should be prepared for up to 25% variation
Estimated value: not provided
Experience: prior supply of fire safety goods acceptable; installation/maintenance capability in India
Quality/standards: OEM warranty; post‑sales service network in India
Option clause allows ±25% quantity variation during contract and currency period
Supply scope limited to goods; no installation unless specified in later contract
Mandatory certificates/documents upload; OEM warranties required at delivery
Not explicitly stated; bidders should anticipate standard procurement payment terms after delivery/completion per contract.
Delivery period begins from last date of original delivery order; extended period calculated as (Increase quantity / Original quantity) × Original delivery period with a minimum 30 days.
Not specified in available data; bidders should review ATC for LD/penalty details.
Ability to supply survival fire blankets (Q3) with OEM warranty
Demonstrated service network in India for installation, commissioning, and maintenance
Upload of mandatory certificates and OEM authorizations
Quantity
45
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Survival Fire Blanket (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
01-Sep-2026, 3:30 am
Opening Date
01-Sep-2026, 4:00 am
Extended Deadline
24-Apr-2026, 6:30 am
Opening Date
24-Apr-2026, 7:00 am
Extended Deadline
16-Apr-2026, 4:30 am
Opening Date
16-Apr-2026, 5:00 am
GST registration certificate
PAN card of bidder
OEM authorization letter (where applicable)
Technical compliance certificates
EOI/bid submission certificates as per ATC
Experience certificates (if any) related to fire safety equipment
Financial statements or turnover evidence (if requested)
Key insights about TAMIL NADU tender market
To bid, ensure you meet OEM warranty requirements and upload all certificates as per ATC. Prepare documentation for GST, PAN, and service capability in India. Understand the 25% quantity variation clause and ensure capability to scale delivery with minimum 30 days extra time.
Submit GST certificate, PAN card, OEM authorization, technical compliance certificates, and experience documents. Include financial statements if requested and evidence of a nationwide service network for installation and maintenance in India.
Provide OEM warranty certificates at delivery and demonstrate a well‑established Installation, Commissioning, Training, Troubleshooting, and Maintenance service group in India. Upload service centers near consignee locations with bid submission.
Delivery time extends proportionally: (Increase quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. If the original period is shorter, extension equals the original period.
OEM warranty certificates must be provided; ensure compliance with any ISI/BIS or ISO requirements as applicable in ATC. Confirm installation and after‑sales service capabilities meet Indian standards.
View the Buyer uploaded ATC document linked in the ATC section of the tender portal. Ensure all certificates and documents match ATC Corrigendum specifications before bid submission.
Scope specifies ‘Only supply of Goods’ with no installation included unless stated in project terms. Bid price should cover all cost components for the goods alone.