TenderDekho Logo
Active GEM

Bhilai Steel Plant Hearth Grouting Material Tender Durg Chhattisgarh 2017-2026 - ISM Carbon-Based Material Raw Mix & App Charges

Bid Publish Date

29-Sep-2026, 6:14 pm

Bid End Date

15-Oct-2026, 7:00 pm

Generate Docs

Progress

Issue29-Sep-2026, 6:14 pm
Corrigendum09-Oct-2026
AwardPending

Tender Overview

**Bhilai Steel Plant, a unit of Steel Authority of India Limited, invites bids for carbon-based hearth grouting material intended for furnace injection in 44 sets (1 set = 1 MT material) with 44 application charges. The procurement targets 44 MT of hearth grouting material and corresponding injection services. Delivery period is 20 days from order, with quantity flex up to 25% during contract execution. Eligible bidders are existing participants from Calderys India Refractories, Carborundum Universal, and TRL Krosaki Refractories. Bidder must provide price break-up for material and application charges and supply party’s test and guarantee certificates.

Technical Specifications & Requirements

  • Item Code/UCS: 71510300040098, 71510300040003
  • Item Description: Hearth grouting material; furnace injection
  • Quantity: 44 MT (44 sets; 1 MT per set); application charges for injection included
  • Delivery Period: 20 days from order date
  • Raw Material Basis: resin and carbon; chemical analysis (Loss on Ignition) – Al2O3 25% min, SiO2 50% max, Fe2O3 8% min, TiO2 1% min; Thermal conductivity 2 W/m-K min at 20°C
  • Inspection: No inspection; supplier must submit test certificate and guarantee certificate
  • Price Break-Up: required for material and application charges; terms align with GEM & buyer ATC clauses
  • Eligibility: Only pre-approved bidders may submit: Calderys India Refractories Ltd, Carborundum Universal Ltd, TRL Krosaki Refractories Ltd

Terms, Conditions & Eligibility

  • EMD/Deposit: Not specified in provided terms; bidders should verify on bid portal
  • Delivery: 20-day delivery period, with option to extend as per quantity variation clause up to 25%
  • Payment Terms: Not specified in excerpt; reference to standard GEM terms; ensure documentation readiness
  • Documents: Party test certificates and guarantee certificates required; OEM authorizations may be required per ATC
  • Penalty/Warranty: Warranty or performance penalties not detailed here; supplier to align with detailed terms & conditions in GEM package
  • Notable Clause: The option clause allows quantity variation up to 25% during contract at contracted rates; extended delivery time follows a calculated formula; minimum 30 days if needed

Key Specifications

    • Item Code/UCS: 71510300040098 and 71510300040003
    • Material: Hearth grouting material; furnace injection
    • Quantity: 44 MT total (1 MT per set) plus 44 application charges
    • Delivery: 20 days from order date
    • Raw Material Basis: Resin and carbon; Al2O3 25% min, SiO2 50% max, Fe2O3 8% min, TiO2 1% min
    • Thermal Conductivity: 2 W/m-K min at 20°C
    • Inspection: No inspection; must provide test certificate and guarantee certificate
    • Price Break-Up: Separate for material and application charges
    • Eligibility: Only CALDERYS INDIA REFRACTORIES LTD, Carborundum Universal Ltd, TRL KROSAKI Refractories Ltd

Terms & Conditions

  • Quantity variation up to 25% with contracted rates and minimum 30 days added delivery time

  • Delivery within 20 days; lot consists of 44 MT material and 44 application charges

  • Submission requires party test certificates and guarantee certificates; no pre-inspection

Important Clauses

Payment Terms

Not specified in excerpt; bidder should confirm GEM terms and ATC

Delivery Schedule

Delivery period fixed at 20 days from order; option to extend per quantity variation formula

Penalties/Liquidated Damages

Not detailed in provided text; ensure alignment with detailed GEM terms and ATC

Bidder Eligibility

  • Only pre-approved bidders: Calderys India Refractories Ltd

  • Carborundum Universal Ltd

  • TRL Krosaki Refractories Ltd

Advertisement

Tender Data

Bid Details

Quantity

44

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

HEARTH GROUTING MATERIAL

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

44

Delivery Locations

1

Delivery Cities

Durg

Delivery Pincodes

490001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
SANJAY TIWARI490001,Refractory Stores, Bhilai Steel Plant.DurgChhattisgarh490001-44-

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9940503.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Bhilai Steel Plant

Office Name

Materials Management

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

09-Oct-2026

Extended Deadline

15-Oct-2026, 1:30 pm

Opening Date

16-Oct-2026, 1:30 pm

Categories 9

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates showing prior hearth grouting material supply

4

Financial statements or turnover details

5

EMD/Security deposit documents (as per terms)

6

Technical bid documents and product specifications

7

OEM authorization/partnership proof (if required by ATC)

8

Test certificates and guarantee certificates from bidder

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

How to participate in Bhilai Steel Plant hearth grouting tender in Durg?

Bidders must be pre-qualified under the listed vendors, submit party test and guarantee certificates, provide price break-up for material and application charges, and comply with the flexible quantity clause up to 25% with a 20-day delivery period.

What documents are required for the hearth grouting material tender in Chhattisgarh?

Submit GST registration, PAN card, experience certificates for similar supply, financial statements, EMD documents (if applicable), technical bid, OEM authorizations, and the party test/guarantee certificates for the material.

What are the material specifications for the hearth grouting in this tender?

Material must be resin and carbon based; Al2O3 25% min, SiO2 50% max, Fe2O3 8% min, TiO2 1% min; thermal conductivity 2 W/m-K min at 20°C; furnace injection capability required.

What is the delivery period for Bhilai Steel Plant hearth grout order?

The delivery period is 20 days from the date of the order; the clause allows a quantity-based extension with a minimum 30-day extension if needed.

What is the eligibility criteria for bidders in this procurement?

Only three bidders are eligible: Calderys India Refractories Ltd, Carborundum Universal Ltd, and TRL Krosaki Refractories Ltd; other offers will be treated as unsolicited.

How is the quantity variation handled in this tender?

The purchaser may increase or decrease up to 25% of the bid quantity; extended delivery time is calculated as (increased quantity/original quantity) × original delivery period, min 30 days.

Are inspection certificates required for the hearth grouting material?

No on-site inspection; bidders must supply the party's test certificate and guarantee certificate with the delivered material.

What is the price breakup requirement for this procurement?

Successful bidder must provide a detailed price break-up separating material costs from application charges for furnace injection, as per GEM and buyer ATC terms.