TenderDekho Logo
Active GEM

GSECL Vadodara Testing Kit for Turbine Speed Sensor Tender Surat Gujarat 2026

Bid Publish Date

08-Jul-2026, 5:56 pm

Bid End Date

07-Sep-2026, 6:00 pm

Generate Docs

Progress

Issue08-Jul-2026, 5:56 pm
Corrigendum29-Aug-2026
AwardPending

Tender Overview

Gujarat State Electricity Corporation Limited (GSECL) — Vadodara invites bids for a TESTING KIT FOR TURBINE SPEED SENSOR to be supplied to the Surat, Gujarat facility (394101). The procurement is issued under ET-6336 category, with no BOQ items listed and an unspecified estimated value. A key differentiation is the inclusion of an option clause allowing up to 25% quantity adjustment at contracted rates, affecting delivery schedules and total volume. Delivery windows reference last date of original orders and extended periods, with minimum 30 days for additional time, ensuring flexibility for demand fluctuations. The ATC documentation and Schedule-B alignment will govern technical compliance.

Technical Specifications & Requirements

  • Title implies a dedicated testing kit for a turbine speed sensor; no explicit technical specs published in the tender data.
  • Buyer-added ATC requires material supply as per Schedule-B and technical specification in the buyer-added ATC, with GSECL finalizing tender terms.
  • Since no BOQ items exist, bidders should anticipate alignment to the undefined but implied turbine sensor testing scope and respond with compliant testing instrumentation capable of evaluating turbine speed sensors under field conditions.
  • If offered, ensure compatibility with site standards and potential OEM control interfaces as indicated by ATC.

Terms, Conditions & Eligibility

  • Option Clause permits a +/- 25% quantity variation during contract and currency, with delivery time adjustments calculated as (additional/original) × original days, minimum 30 days.
  • Delivery period starts from the last date of the original delivery order; extension calculations follow the same rule.
  • ATC clauses indicate final authority rests with GSECL regarding Schedule-B and technical specifications.
  • No explicit EMD amount or payment terms disclosed in the data; bidders must verify at bid submission and in ATC documents.
  • Ensure compliance with Schedule-B and any OEM authorizations or technical compliance certificates as mandated by the final ATC.

Key Specifications

  • Product/service: Testing kit for turbine speed sensor

  • Estimated value: Not disclosed

  • EMD: Not disclosed in tender data

  • Delivery location: Surat, Gujarat 394101

  • Category: ET-6336

  • Standards/certifications: Not specified in data; verify via ATC

  • Experience: Not explicitly stated; rely on Schedule-B/OEM terms

  • Warranty: Not specified in data

Terms & Conditions

  • Option to increase/decrease quantity up to 25% at contracted rates

  • Delivery time calculated with minimum 30 days for extended periods

  • Material per Schedule-B and ATC final terms govern compliance

  • EMD amount and payment terms to be clarified in final ATC

  • OEM authorizations and technical compliance certificates may be required

Important Clauses

Payment Terms

Payment terms are not disclosed in the provided data; bidders must refer to final ATC and Schedule-B for structure (advance, milestone, or post-delivery).

Delivery Schedule

Delivery starts from last date of original delivery order; option clause allows extended delivery time calculated as (additional quantity/original quantity) × original delivery period, minimum 30 days.

Penalties/Liquidated Damages

Penalties/LD details are not provided; final terms will be governed by ATC and Schedule-B and should be confirmed during bid submission.

Bidder Eligibility

  • Experience in supplying/testing kits for turbine or related speed sensors

  • Financial capacity to handle potential 25% quantity variation

  • Compliance with Schedule-B and OEM authorization requirements as specified in final ATC

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

ET-6336: TESTING KIT FOR TURBINE SPEED SENSOR

Advisory Bank

Bank Of Baroda

ePBG Percentage

5%

ePBG Duration (Months)

4

Delivery Details

Max Delivery Days

84

Delivery Locations

1

Delivery Cities

Tapi

Delivery Pincodes

394680

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Pallavkumar Maganbhai Solanki394680,GSECL UKAI TPS, UKAI DAM, DIST: TAPITapiGujarat394680184-

Authority Records

ENERGY AND PETROCHEMICALS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9479413.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Technical Specification/Buyer Specification Document

TECHNICAL

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Gujarat State Electricity Corporation Limited (gsecl) Vadodara

Office Name

Gsecl Corpotate Office

Grievance Contact

[email protected]

Corrigendum Updates

4 Updates
#1

Update

29-Aug-2026

Extended Deadline

07-Sep-2026, 12:30 pm

Opening Date

07-Sep-2026, 1:00 pm

#2

Update

19-Aug-2026

Extended Deadline

29-Aug-2026, 12:30 pm

Opening Date

29-Aug-2026, 1:00 pm

#3

Update

06-Aug-2026

Extended Deadline

19-Aug-2026, 12:30 pm

Opening Date

19-Aug-2026, 1:00 pm

#4

Update

27-Jul-2026

Extended Deadline

06-Aug-2026, 12:30 pm

Opening Date

06-Aug-2026, 1:00 pm

Categories 4

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar turbine sensor testing kits

4

Financial statements or bank statements demonstrating financial stability

5

EMD/Security deposit documentation (as per final ATC)

6

Technical bid document aligning with Schedule-B requirements

7

OEM authorization letters for any third-party equipment

8

Technical compliance certificates if issued by the OEM

9

Any additional documents specified in Buyer Added ATC

Frequently Asked Questions

Key insights about GUJARAT tender market

How to bid for turbine speed sensor testing kit tender in Surat?

Bidders should review the final ATC and Schedule-B for Schedule-B alignment, ensure OEM authorizations, provide necessary financial documents, and submit the Technical bid with EMD details once disclosed. The 25% option clause affects quantity and delivery; confirm delivery windows with GSECL.

What documents are required for the turbine sensor testing kit bid in Gujarat?

Required documents typically include GST, PAN, experience certificates in turbine sensor testing, financial statements, EMD/Security deposit, technical bid, and OEM authorization letters; verify exact list in the final ATC and Schedule-B.

What are the delivery terms for the GSECL testing kit tender in Surat?

Delivery starts after the last date of the original delivery order, with a minimum 30 days for any extended period. A 25% quantity option allows adjustment during contract, affecting delivery timelines per the extended period formula.

What standards or certifications are required for the turbine speed sensor kit?

Tender data does not specify standards; bidders must rely on final ATC and Schedule-B, which may require OEM certifications and compliance with site-specific technical specifications.

How is the EMD amount determined for this Gujarat tender?

The EMD amount is not disclosed in the provided data; bidders should refer to the final ATC for exact EMD figures and acceptable payment modes when submitting bids.

When is the bid submission for the Surat turbine testing kit due?

Exact submission dates are not provided in the snippet; bidders must consult the final ATC and portal notifications for the precise deadline and any extension provisions under the option clause.

What is the scope of Schedule-B in the GSECL turbine sensor tender?

Schedule-B defines material supply and technical compliance requirements; bidders must align their offers to Schedule-B specifications and ensure compatibility with OEM terms and final ATC.

What constitutes eligibility for the turbine speed sensor bid in Gujarat?

Eligibility centers on prior experience in turbine or sensor testing, ability to meet Schedule-B terms, possessing OEM authorizations, and meeting financial viability to absorb quantity changes under the 25% option clause.