Bid Publish Date
29-Mar-2025, 3:40 pm
Bid End Date
19-Apr-2025, 4:00 pm
Location
Progress
Quantity
15173
The issuing authority has released a public tender for OXYGEN SYSTEM, OXYGEN SYSTEM, OXYGEN SYSTEM, OXYGEN SYSTEM, OXYGEN SYSTEM, OXYGEN SYSTEM, OXYGEN SYSTEM, O in IMPHAL WEST, MANIPUR. Quantity: 15173. Submission Deadline: 19-04-2025 16: 00: 00. Download documents and apply online.
Tender Category
Goods
Bid To RA
No
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
OXYGEN SYSTEM
Oxgen gas outlets
OXYGEN SYSTEM
Indegenious BPC Oxygen flow meter with humidifier bottle 0-15 L per min standard flow rate
OXYGEN SYSTEM
Indegenious Oxygen High pressure Rubber tube with white colour
OXYGEN SYSTEM
12+12 Primary Main Oxygen manifold complete with NRVs and pig tail pipes
OXYGEN SYSTEM
Fully automatic control panel for oxygen having a constant flow out put of over 2100 lpm at 4.2 bar pressure
OXYGEN SYSTEM
6+6 cylinder oxygen emergency manifold complete with NRVs and pig tail pipes
OXYGEN SYSTEM
Fully automatic control panel for oxygen having a constant flow out put of over 1500 lpm at 4.2 bar pressure
OXYGEN SYSTEM
4+4 cylinder oxygen emergency manifold complete with NRVs and pig tail pipes
OXYGEN SYSTEM
Fully automatic control panel for oxygen having a constant flow out put of over 1500 lpm at 4.2 bar pressure
VACUUM SYSTEM
Vacuum Gas Outlet
VACUUM SYSTEM
Indegenous ward vacuum unit with regulator, collection Jar of 600 ml with backet
VACUUM SYSTEM
Indigenous vacuum high pressure Rubber tube yellow color
VACUUM SYSTEM
Vaccum Central System complete with 2 nos. Vacuum pumps, having 34.60 cfm PD with 10 HP motor Filter, interconnecting pipes NRV, auto switch gear assy, exhaust, silencer and Receiver-1 nos of capacity 1000 liter each etc.
VACUUM SYSTEM
Bacterial filter (Imported)
COMPRESSED AIR SYSTEM
Compressed air system complete with 2 nos. 22.93 CFM capacity Non lubricated, reciprocating air colled type base frame mounted air compressors with 5HP motors with a 1 no. of receiver of 1000 litre water capcity.
COMPRESSED AIR SYSTEM
Air Dryer
COMPRESSED AIR SYSTEM
4 Stage air filtration system
COMPRESSED AIR SYSTEM
Pressure redicing system
COMPRESSED AIR SYSTEM
Surgical Air 5 Bar Gas Outlets
COMPRESSED AIR SYSTEM
Indigenous compressed Air High Pressure Rubber tube black color
CARBON DIOXIDE SYSTEM
2+2 size Primary main Carbon dioxide manifold complete with NRVs and pig tail pipes
CARBON DIOXIDE SYSTEM
1+1 cylinder sizer of CO2 Emergency cylinder manifold complete with NRVs & Pig tail
CARBON DIOXIDE SYSTEM
Carbondioxide gas outlets
CARBON DIOXIDE SYSTEM
Indigeneous Carbon Dioxide High Pressure Rubber tube blue color
NITROGEN OXIDE SYSTEM
2+2 size Primary main Carbon dioxide manifold complete with NRVs and pig tail pipes
NITROGEN OXIDE SYSTEM
1+1 cylinder sizer of N2O Emergency cylinder manifold complete with NRVs & Pig tail
NITROGEN OXIDE SYSTEM
Nitrous Oxide gas outlets
NITROGEN OXIDE SYSTEM
Indegenous Nitrous Oxide High Pressure Rubber tube blue color
COPPER PIPE
54 MM COPPER PIPE 1.2mm
COPPER PIPE
42 MM COPPER PIPE 1.2mm
COPPER PIPE
28 MM COPPER PIPE 0.9mm
COPPER PIPE
28 MM COPPER PIPE 1mm
COPPER PIPE
22 MM COPPER PIPE 0.9mm
COPPER PIPE
22 MM COPPER PIPE 1mm
COPPER PIPE
15 MM COPPER PIPE 0.9mm
COPPER PIPE
15 MM COPPER PIPE 1MM
COPPER PIPE
12 MM COPPER PIPE 0.9mm
Zonal Valve
Box with Ball Valve and Pressure Gauge 1 Gas
Zonal Valve
Box with Ball Valve and Pressure Gauge 3 Gas
Zonal Valve
Box with Ball Valve and Pressure Gauge 2 Gas
Zonal Valve
Box with Ball Valve and Pressure Gauge 6 Gas
Medical Gas
Analog Type Alarm System 1 Gas
Medical Gas
Analog Type Alarm System 3 Gas
Medical Gas
Analog Type Alarm System 2 Gas
Medical Gas
Analog Type Alarm System 6 Gas
ISOLATION VALVE
12 MM ISOLATION VALVE
ISOLATION VALVE
15 MM ISOLATION VALVE
ISOLATION VALVE
22 MM ISOLATION VALVE
ISOLATION VALVE
28 MM ISOLATION VALVE
ISOLATION VALVE
42 MM ISOLATION VALVE
ISOLATION VALVE
54 MM ISOLATION VALVE
Miscelleneous Items
Combine electrical control panel for vaccum system and compressed air system (Cascading/ seq) complete with plant room wiring
BEDHEAD PANEL
Bed Head Panel with all necessary accessories
AGSS System
AGSS System of 2100 LPM Duplex
AGSS System
Balancer & Receiver Unit
AGSS System
Remote
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | OXYGEN SYSTEM | Oxgen gas outlets | 321 | nos | sysadmin.rims-mn | 180 | |
| 2 | OXYGEN SYSTEM | Indegenious BPC Oxygen flow meter with humidifier bottle 0-15 L per min standard flow rate | 321 | nos | sysadmin.rims-mn | 180 | |
| 3 | OXYGEN SYSTEM | Indegenious Oxygen High pressure Rubber tube with white colour | 1,550 | mtr | sysadmin.rims-mn | 180 | |
| 4 | OXYGEN SYSTEM | 12+12 Primary Main Oxygen manifold complete with NRVs and pig tail pipes | 2 | nos | sysadmin.rims-mn | 180 | |
| 5 | OXYGEN SYSTEM | Fully automatic control panel for oxygen having a constant flow out put of over 2100 lpm at 4.2 bar pressure | 2 | nos | sysadmin.rims-mn | 180 | |
| 6 | OXYGEN SYSTEM | 6+6 cylinder oxygen emergency manifold complete with NRVs and pig tail pipes | 2 | nos | sysadmin.rims-mn | 180 | |
| 7 | OXYGEN SYSTEM | Fully automatic control panel for oxygen having a constant flow out put of over 1500 lpm at 4.2 bar pressure | 1 | nos | sysadmin.rims-mn | 180 | |
| 8 | OXYGEN SYSTEM | 4+4 cylinder oxygen emergency manifold complete with NRVs and pig tail pipes | 1 | nos | sysadmin.rims-mn | 180 | |
| 9 | OXYGEN SYSTEM | Fully automatic control panel for oxygen having a constant flow out put of over 1500 lpm at 4.2 bar pressure | 1 | nos | sysadmin.rims-mn | 180 | |
| 10 | VACUUM SYSTEM | Vacuum Gas Outlet | 303 | nos | sysadmin.rims-mn | 180 | |
| 11 | VACUUM SYSTEM | Indegenous ward vacuum unit with regulator, collection Jar of 600 ml with backet | 303 | nos | sysadmin.rims-mn | 180 | |
| 12 | VACUUM SYSTEM | Indigenous vacuum high pressure Rubber tube yellow color | 1,500 | mtr | sysadmin.rims-mn | 180 | |
| 13 | VACUUM SYSTEM | Vaccum Central System complete with 2 nos. Vacuum pumps, having 34.60 cfm PD with 10 HP motor Filter, interconnecting pipes NRV, auto switch gear assy, exhaust, silencer and Receiver-1 nos of capacity 1000 liter each etc. | 3 | nos | sysadmin.rims-mn | 180 | |
| 14 | VACUUM SYSTEM | Bacterial filter (Imported) | 2 | nos | sysadmin.rims-mn | 180 | |
| 15 | COMPRESSED AIR SYSTEM | Compressed air system complete with 2 nos. 22.93 CFM capacity Non lubricated, reciprocating air colled type base frame mounted air compressors with 5HP motors with a 1 no. of receiver of 1000 litre water capcity. | 3 | nos | sysadmin.rims-mn | 180 | |
| 16 | COMPRESSED AIR SYSTEM | Air Dryer | 3 | nos | sysadmin.rims-mn | 180 | |
| 17 | COMPRESSED AIR SYSTEM | 4 Stage air filtration system | 3 | nos | sysadmin.rims-mn | 180 | |
| 18 | COMPRESSED AIR SYSTEM | Pressure redicing system | 3 | nos | sysadmin.rims-mn | 180 | |
| 19 | COMPRESSED AIR SYSTEM | Surgical Air 5 Bar Gas Outlets | 130 | nos | sysadmin.rims-mn | 180 | |
| 20 | COMPRESSED AIR SYSTEM | Indigenous compressed Air High Pressure Rubber tube black color | 800 | mtr | sysadmin.rims-mn | 180 | |
| 21 | CARBON DIOXIDE SYSTEM | 2+2 size Primary main Carbon dioxide manifold complete with NRVs and pig tail pipes | 3 | nos | sysadmin.rims-mn | 180 | |
| 22 | CARBON DIOXIDE SYSTEM | 1+1 cylinder sizer of CO2 Emergency cylinder manifold complete with NRVs & Pig tail | 3 | nos | sysadmin.rims-mn | 180 | |
| 23 | CARBON DIOXIDE SYSTEM | Carbondioxide gas outlets | 8 | nos | sysadmin.rims-mn | 180 | |
| 24 | CARBON DIOXIDE SYSTEM | Indigeneous Carbon Dioxide High Pressure Rubber tube blue color | 120 | mtr | sysadmin.rims-mn | 180 | |
| 25 | NITROGEN OXIDE SYSTEM | 2+2 size Primary main Carbon dioxide manifold complete with NRVs and pig tail pipes | 3 | nos | sysadmin.rims-mn | 180 | |
| 26 | NITROGEN OXIDE SYSTEM | 1+1 cylinder sizer of N2O Emergency cylinder manifold complete with NRVs & Pig tail | 3 | nos | sysadmin.rims-mn | 180 | |
| 27 | NITROGEN OXIDE SYSTEM | Nitrous Oxide gas outlets | 8 | nos | sysadmin.rims-mn | 180 | |
| 28 | NITROGEN OXIDE SYSTEM | Indegenous Nitrous Oxide High Pressure Rubber tube blue color | 120 | mtr | sysadmin.rims-mn | 180 | |
| 29 | COPPER PIPE | 54 MM COPPER PIPE 1.2mm | 100 | mtr | sysadmin.rims-mn | 180 | |
| 30 | COPPER PIPE | 42 MM COPPER PIPE 1.2mm | 730 | mtr | sysadmin.rims-mn | 180 | |
| 31 | COPPER PIPE | 28 MM COPPER PIPE 0.9mm | 550 | mtr | sysadmin.rims-mn | 180 | |
| 32 | COPPER PIPE | 28 MM COPPER PIPE 1mm | 700 | mtr | sysadmin.rims-mn | 180 | |
| 33 | COPPER PIPE | 22 MM COPPER PIPE 0.9mm | 1,600 | mtr | sysadmin.rims-mn | 180 | |
| 34 | COPPER PIPE | 22 MM COPPER PIPE 1mm | 1,300 | mtr | sysadmin.rims-mn | 180 | |
| 35 | COPPER PIPE | 15 MM COPPER PIPE 0.9mm | 1,570 | mtr | sysadmin.rims-mn | 180 | |
| 36 | COPPER PIPE | 15 MM COPPER PIPE 1MM | 1,550 | mtr | sysadmin.rims-mn | 180 | |
| 37 | COPPER PIPE | 12 MM COPPER PIPE 0.9mm | 660 | mtr | sysadmin.rims-mn | 180 | |
| 38 | Zonal Valve | Box with Ball Valve and Pressure Gauge 1 Gas | 1 | nos | sysadmin.rims-mn | 180 | |
| 39 | Zonal Valve | Box with Ball Valve and Pressure Gauge 3 Gas | 9 | nos | sysadmin.rims-mn | 180 | |
| 40 | Zonal Valve | Box with Ball Valve and Pressure Gauge 2 Gas | 10 | nos | sysadmin.rims-mn | 180 | |
| 41 | Zonal Valve | Box with Ball Valve and Pressure Gauge 6 Gas | 2 | nos | sysadmin.rims-mn | 180 | |
| 42 | Medical Gas | Analog Type Alarm System 1 Gas | 1 | nos | sysadmin.rims-mn | 180 | |
| 43 | Medical Gas | Analog Type Alarm System 3 Gas | 9 | nos | sysadmin.rims-mn | 180 | |
| 44 | Medical Gas | Analog Type Alarm System 2 Gas | 10 | nos | sysadmin.rims-mn | 180 | |
| 45 | Medical Gas | Analog Type Alarm System 6 Gas | 2 | nos | sysadmin.rims-mn | 180 | |
| 46 | ISOLATION VALVE | 12 MM ISOLATION VALVE | 500 | nos | sysadmin.rims-mn | 180 | |
| 47 | ISOLATION VALVE | 15 MM ISOLATION VALVE | 75 | nos | sysadmin.rims-mn | 180 | |
| 48 | ISOLATION VALVE | 22 MM ISOLATION VALVE | 60 | nos | sysadmin.rims-mn | 180 | |
| 49 | ISOLATION VALVE | 28 MM ISOLATION VALVE | 30 | nos | sysadmin.rims-mn | 180 | |
| 50 | ISOLATION VALVE | 42 MM ISOLATION VALVE | 15 | nos | sysadmin.rims-mn | 180 | |
| 51 | ISOLATION VALVE | 54 MM ISOLATION VALVE | 8 | nos | sysadmin.rims-mn | 180 | |
| 52 | Miscelleneous Items | Combine electrical control panel for vaccum system and compressed air system (Cascading/ seq) complete with plant room wiring | 2 | nos | sysadmin.rims-mn | 180 | |
| 53 | BEDHEAD PANEL | Bed Head Panel with all necessary accessories | 150 | nos | sysadmin.rims-mn | 180 | |
| 54 | AGSS System | AGSS System of 2100 LPM Duplex | 1 | nos | sysadmin.rims-mn | 180 | |
| 55 | AGSS System | Balancer & Receiver Unit | 3 | nos | sysadmin.rims-mn | 180 | |
| 56 | AGSS System | Remote | 3 | nos | sysadmin.rims-mn | 180 |
Discover companies most likely to bid on this tender
Key insights about MANIPUR tender market
The eligibility requirements include being a registered entity capable of operating within the healthcare sector, demonstrating prior experience in delivering similar projects, and complying with applicable local regulations and industry standards. Interested bidders must ensure they meet these qualifications to submit a valid bid.
Bidders are typically required to submit certificates proving their compliance with quality standards, such as ISO certifications, along with any other relevant industry-specific certifications. It’s important to refer to the tender documentation for the specific certificates mandated for compliance.
To participate, businesses must complete the registration process outlined in the tender documentation. This usually involves providing business credentials, previous experience documentation, and fulfilling the technical specifications outlined in the tender guidelines.
Accepted document formats for submissions will be clearly outlined in the tender materials. Common formats typically include PDF and other text documents suitable for electronic submission. Bidders should ensure that all supporting documents adhere to these specified formats.
Bidders will be required to furnish a performance security guarantee as part of their proposal. This requirement aims to ensure compliance with the terms of the awarded contract. Details regarding the amount and form of this security will be provided in the tender documentation and should be carefully reviewed by all prospective bidders.
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS