UPPCL Dismantling and Erection of 33/36 KV VCB Works Tender Sultanpur Uttar Pradesh 2026

Bid Publish Date

18-Jul-2026, 3:30 pm

Bid End Date

28-Jul-2026, 4:00 pm

Progress

Issue18-Jul-2026, 3:30 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

26

Category

Dismantling and shifting of 33KV VCB

Bid Type

Two Packet Bid

Categories 62

Tender Overview

Organization: Uttar Pradesh Power Corporation Limited (UPPCL) • Product/Service: Dismantling, shifting, erection of 33 KV VCBs, foundation modification, jumper between equipments, earthing, cable termination, transportation of VCBs, CT handling, and loading/unloading of cable drums. Location: Sultanpur, Uttar Pradesh 222301. Scope includes dismantling and re-erection of VCBs up to 33/36 KV, CT dismantling, LA erection, and cable drum carriage. Delivery window: completion within 30 days from LOI/Agreement, subject to shutdown availability. Payment terms: 90% on site completion; BTS portal bill submission for processing. Penalties: 0.5% per week up to a maximum of 10% of late completion. Unique clause allows quantity variation up to 25% with contracted rates.

Technical Specifications & Requirements

  • Delivery location: 132 KV Sub-Station, Lambhua, under SDO-IInd, ETD Sultanpur jurisdiction.
  • Work scope: Dismantling & shifting of 33 KV VCB, 33 KV VCB foundation modification, erection of new 33 KV VCB, jumpering between equipment, re-earthing of VCB, cable termination, shifting/loading of 36 KV VCB, carriage of CT, dismantling/erection of CT, erection of LA, and carriage of cable drums of varying sizes.
  • Site supervision: Under executive engineer-in-charge; work subject to shutdown availability and JE guidance.
  • Warranty/quality: Not explicitly stated; contractor bears safety responsibility and compensation for accidents.
  • Compliance: Price on FOR basis to 132 KV Sub-Station, Lambhua; tax as legally applicable.

Terms, Conditions & Eligibility

  • Completion timeframe: 30 days from LOI/Agreement
  • Payment terms: 90% payment on successful completion; bill upload via UPPTCL BTS portal
  • Penalties: 0.5% per week for delay, up to 10% of contract value
  • Safety/compensation: Contractor bears all safety arrangements; UPPTCL not liable for accidents
  • Contractor obligation: Provide non-judicial stamp paper worth ₹100 for agreement; engineer of contract: Executive Engineer, Electricity Trans. Division, Sultanpur
  • Option clause: Quantity may increase/decrease by up to 25%; extended delivery as per clause, with minimum 30 days; delivery period calculation uses original/extended quantities
  • EMD/official documents: Not disclosed in data; bidders must adhere to standard UPPTCL bid submission processes
  • Delivery scope note: Work under strict supervision; completion tied to shutdown windows and engineer directives

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Dismantling and shifting of 33KV VCB , Modification of 33 KV VCB Foundation , Erection of new 33 KV VCB , Jumpering between equipments , Re Earthing of VCB , Cable Termination , Shifting Loading of 36 KV VCB , Transportation of VCB on hired private Vehicle , Safe unloading and shifting of VCB , Loading Unloadinfg and carriage of CT , Dismantling of CT , Erection work of CT , Erection of LA , Carriage of Cable drums of different sizes

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Sultanpur

Delivery Pincodes

228001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ritesh Kumar228001,ELECTRICITY TRANSMISSION SUB DIVISION-II 400 KV CAMPUS PAYAGIPUR SULTANPURSultanpurUttar Pradesh228001115-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9627875.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 14 Items Sign in for GEM prices

#1

Dismantling and shifting of 33KV VCB

Dismantling of 33 KV damaged and defective VCB including shifting of dismantled VCB form switch yard to storage place or store room

1 job Delivery: 30 days
#2

Modification of 33 KV VCB Foundation

Modification of 33 KV VCB foundation as per site requirement as per manufacturing drawing or as per direction of supervising Engineer and shifting of earthing and both side jumper

1 job Delivery: 30 days
#3

Erection of new 33 KV VCB

Erection of new 33 KV VCB in proper alignment and cable termination of circuit breaker as per logic for tripping and closing spring charging indication supervision circuit with proper ferruling and checking out of breaker operation from local and remote including earthing and connection of both side jumpers and works related to complete the erection work

1 job Delivery: 30 days
#4

Jumpering between equipments

Making of new jumpering between CB toTC CB to BI with twin ACSR panther conductor with the help of PG or CB clamp

1 job Delivery: 30 days
#5

Re Earthing of VCB

ReEarthing of 36 KV Circuit breaker by cutting bending and welding of 50x6 mm MS Flat to existing riser work includes checking of existing near connectivity to earth mat painting of existing riser earth flat earth flat with one cost of red oxide and two coat of black or bus green enamel paint of standard make after cleaning of strip angle for rust and dust

1 job Delivery: 30 days
#6

Cable Termination

Opening of termintion wiring from damaged breaker after writing the ferrule and tallying the ferrule with electrical drawing The work include complete identification of wiring then opening of wiring from panel and breaker end Then after reelection of new breaker the old wiring ferrule will be replaced the as per new drawing terminated for proper electrical working

1 job Delivery: 30 days
#7

Shifting Loading of 36 KV VCB

Safe loading of new 36 KV VCB at 132 KV Sub Station Kadipur on hired private vehicle with the help of Hydra The work includes shifting of VCB from storage place to loading point by manpower

1 no Delivery: 30 days
#8

Transportation of VCB on hired private Vehicle

Safe Transportation of new 36 KV VCB by hired private vehicle from 132 KV Sub Station Kadipur to 132 KV Sub Station Lambhua Distance approx 20 Kms

1 no Delivery: 30 days
#9

Safe unloading and shifting of VCB

Safe unloading the new 36 KV VCB brought from 132 KV SubStation Kadipur from vehicle with the help of hydra at 132 KV Sub Station Lambhua and shifting it by manpower to 1 the designated place as per instructions of JE incharge

1 no Delivery: 30 days
#10

Loading Unloadinfg and carriage of CT

Loading unloading and safe Carriage of 33 KV CT 03 Nos From 132 KV Substation Gauriganj to 132 KV SS Lambhua and unloading the same

3 no Delivery: 30 days
#11

Dismantling of CT

Dismantling of 36 KV CT 400 200 1A

3 no Delivery: 30 days
#12

Erection work of CT

Erection of new 33 KV CT Including all associated Work

3 no Delivery: 30 days
#13

Erection of LA

Erection of 30 KV LA

3 no Delivery: 30 days
#14

Carriage of Cable drums of different sizes

Safe carriage of cable drums of various size from 440kV Cental store sultanpur to 132kV SS Gosahsinghpur

5 no Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer