TenderDekho Logo
Active GEM

Contract Bidding Open For 2 Pin Female Plugs CPL,2 PIN Male Plugs CPL,230 V 2 Core 2 point 5 square mm Cable,230 V 2 Core 4 s in HYDERABAD, TELANGANA

Bid Publish Date

20-Jul-2026, 2:40 pm

Bid End Date

10-Aug-2026, 3:00 pm

Value

₹41,40,700

Location

HYDERABAD , TELANGANA

Progress

Issue20-Jul-2026, 2:40 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

3455

Category

MCBs 16A C curve

Bid Type

Two Packet Bid

Categories 78

Office Of Dg (mss) has released a public tender for 2 Pin Female Plugs CPL, 2 PIN Male Plugs CPL, 230 V 2 Core 2 point 5 square mm Cable, 230 V 2 Core 4 s in HYDERABAD, TELANGANA. Quantity: 3455. Submission Deadline: 10-08-2026 15: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

6

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

HYDERABAD

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-HYDERABADHYDERABAD--50120-

Authority Records

MINISTRY OF DEFENCEDEFENCE RESEARCH & DEVELOPMENT DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9543654.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 156 Items Sign in for GEM prices

#1

2 Pin Female Plugs CPL

2 Pin Female Plugs CPL

50 nos Delivery: 120 days
#2

2 PIN Male Plugs CPL

2 PIN Male Plugs CPL

50 nos Delivery: 120 days
#3

230 V 2 Core 2 point 5 square mm Cable

230 V 2 Core 2 point 5 square mm Cable

100 mtrs Delivery: 120 days
#4

230 V 2 Core 4 square mm Cable

230 V 2 Core 4 square mm Cable

100 mtrs Delivery: 120 days
#5

230 V 3 Core 2 point 5 square mm Cable

230 V 3 Core 2 point 5 square mm Cable

100 mtrs Delivery: 120 days
#6

230 V 3 Core 4 square mm Cable

230 V 3 Core 4 square mm Cable

100 mtrs Delivery: 120 days
#7

230 V 4 Core 2 point 5 square mm Cable

230 V 4 Core 2 point 5 square mm Cable

100 mtrs Delivery: 120 days
#8

230 V 4 Core 4 square mm Cable

230 V 4 Core 4 square mm Cable

100 mtrs Delivery: 120 days
#9

415 V Cables 3 Core 2 point 5 square mm Cable

415 V Cables 3 Core 2 point 5 square mm Cable

100 mtrs Delivery: 120 days
#10

415 V Cables 3 Core 4 square mm Cable

415 V Cables 3 Core 4 square mm Cable

100 mtrs Delivery: 120 days
#11

Battery lugs P N

Battery lugs P N

10 nos Delivery: 120 days
#12

Bulb 25 Volt AC For Lead Lamp

Bulb 25 Volt AC For Lead Lamp

10 nos Delivery: 120 days
#13

Cable Ties S

Cable Ties S

150 pkts Delivery: 120 days
#14

Cable Ties M

Cable Ties M

150 pkts Delivery: 120 days
#15

Cable Ties L

Cable Ties L

150 pkts Delivery: 120 days
#16

CFL E27 Warm White 830 3000K WALL LAMP ORNAMENTAL IN CABINS

CFL E27 Warm White 830 3000K WALL LAMP ORNAMENTAL IN CABINS

50 nos Delivery: 120 days
#17

CFL PLS 7W Base G24

CFL PLS 7W Base G24

50 nos Delivery: 120 days
#18

Connector Terminal ZDK 2 point 5

Connector Terminal ZDK 2 point 5

10 nos Delivery: 120 days
#19

Connector Terminal ZDU 2 point 5

Connector Terminal ZDU 2 point 5

10 nos Delivery: 120 days
#20

Connector Terminal ZPE 2 point 5

Connector Terminal ZPE 2 point 5

10 nos Delivery: 120 days
#21

Double Poled surface mounted Switch 230 16A IP44 CPL Type 202282 IN VARIOUS COMPARTMENT ELEC WORKSHOP ENGG WORKSHOP

Double Poled surface mounted Switch 230 16A IP44 CPL Type 202282 IN VARIOUS COMPARTMENT ELEC WORKSHOP ENGG WORKSHOP

30 nos Delivery: 120 days
#22

Extension board With 04 in no 5A with 10 meters cable length

Extension board With 04 in no 5A with 10 meters cable length

5 nos Delivery: 120 days
#23

Extension board With 04 in no 15A with 10 meters cable length

Extension board With 04 in no 15A with 10 meters cable length

5 nos Delivery: 120 days
#24

Gloves Antistatic

Gloves Antistatic

10 pairs Delivery: 120 days
#25

Indication lamps for 415V Red

Indication lamps for 415V Red

5 nos Delivery: 120 days
#26

Indication lamps for 230V Green

Indication lamps for 230V Green

5 nos Delivery: 120 days
#27

Insulation Tape Electrical 6 point 50 mtrs

Insulation Tape Electrical 6 point 50 mtrs

100 nos Delivery: 120 days
#28

Lugs 16 SQ MM

Lugs 16 SQ MM

20 nos Delivery: 120 days
#29

Lugs 20 SQ MM

Lugs 20 SQ MM

20 nos Delivery: 120 days
#30

Lugs 25 SQ MM

Lugs 25 SQ MM

20 nos Delivery: 120 days
#31

MCBs 16A C curve

MCBs 16A C curve

5 nos Delivery: 120 days
#32

MCBs 5A C curve

MCBs 5A C curve

5 nos Delivery: 120 days
#33

MCBs 32A C curve

MCBs 32A C curve

5 nos Delivery: 120 days
#34

MCBs 45A C curve

MCBs 45A C curve

2 nos Delivery: 120 days
#35

MCBs 1 A

MCBs 1 A

10 nos Delivery: 120 days
#36

MCBs 10A C curve

MCBs 10A C curve

10 nos Delivery: 120 days
#37

Single Receptacle Surface Mounted, 220V 15A Din Type 3 Pole 2P plus E Ip20 CPL Type 1551 Cms

Single Receptacle Surface Mounted, 220V 15A Din Type 3 Pole 2P plus E Ip20 CPL Type 1551 Cms

20 nos Delivery: 120 days
#38

Single Receptacle Surface Mounted 230V 5 15A Dual Soket Suitable For Both 5A and 15A Plugs Ups Supply Din Type 3 Pole 2 P plus E Type 1551 Cms

Single Receptacle Surface Mounted 230V 5 15A Dual Soket Suitable For Both 5A and 15A Plugs Ups Supply Din Type 3 Pole 2 P plus E Type 1551 Cms

10 nos Delivery: 120 days
#39

Single Receptacle Surface Mounted 230V 5 15A Dual Soket With Switch Suitable For Both 5A 15 A Plugs Din Type 3 Pole 2P plus E 1551 Cmsp

Single Receptacle Surface Mounted 230V 5 15A Dual Soket With Switch Suitable For Both 5A 15 A Plugs Din Type 3 Pole 2P plus E 1551 Cmsp

10 nos Delivery: 120 days
#40

Single 2 Pole plus E Receptacle 230V 15A Din Type Ip44 Type 216Rs6 and 232 RS6 ABB Sockets

Single 2 Pole plus E Receptacle 230V 15A Din Type Ip44 Type 216Rs6 and 232 RS6 ABB Sockets

5 nos Delivery: 120 days
#41

Single 2 Pole plus E Receptacle with plugs In Ex Area Zone 1 2 Pole 250V AC

Single 2 Pole plus E Receptacle with plugs In Ex Area Zone 1 2 Pole 250V AC

5 nos Delivery: 120 days
#42

230V Socket With Integral Switch Ups Supply Type Ghg 511 4306 L3001

230V Socket With Integral Switch Ups Supply Type Ghg 511 4306 L3001

5 nos Delivery: 120 days
#43

Three pole plus E plugs with interlock switch type 472401 415V 32A IP44

Three pole plus E plugs with interlock switch type 472401 415V 32A IP44

5 nos Delivery: 120 days
#44

Three pole plus E plugs with interlock switch type 406233 415V 32A IP44 In Elec Workshop Blue Colour

Three pole plus E plugs with interlock switch type 406233 415V 32A IP44 In Elec Workshop Blue Colour

5 nos Delivery: 120 days
#45

Spike Guard with six 5A sockets

Spike Guard with six 5A sockets

5 nos Delivery: 120 days
#46

Switch double pole with light surface mounted 230V 16A IP202021 CPDS 1

Switch double pole with light surface mounted 230V 16A IP202021 CPDS 1

20 nos Delivery: 120 days
#47

Switch double poled surface mounted 230 16A IP44

Switch double poled surface mounted 230 16A IP44

20 nos Delivery: 120 days
#48

Terminal marking sleeves A

Terminal marking sleeves A

5 nos Delivery: 120 days
#49

Terminal marking sleeves B

Terminal marking sleeves B

5 nos Delivery: 120 days
#50

Terminal marking sleeves C

Terminal marking sleeves C

5 nos Delivery: 120 days
#51

Terminal marking sleeves 1

Terminal marking sleeves 1

5 nos Delivery: 120 days
#52

Terminal marking sleeves 2

Terminal marking sleeves 2

5 nos Delivery: 120 days
#53

Terminal marking sleeves 3

Terminal marking sleeves 3

5 nos Delivery: 120 days
#54

Tube L 18 W 865 cool day light

Tube L 18 W 865 cool day light

50 nos Delivery: 120 days
#55

Tube light TL D 18 W 830 warm white

Tube light TL D 18 W 830 warm white

50 nos Delivery: 120 days
#56

Tube lights T5 Warm white 830 3000K of Laundry

Tube lights T5 Warm white 830 3000K of Laundry

10 nos Delivery: 120 days
#57

Tube lights TC DE Warm white 830 3000K of Cabins

Tube lights TC DE Warm white 830 3000K of Cabins

20 nos Delivery: 120 days
#58

Tube lights TC TEL Warm white 830 3000K Base GX24q 2 Wall lamp ornamental Type of Mess Day Room

Tube lights TC TEL Warm white 830 3000K Base GX24q 2 Wall lamp ornamental Type of Mess Day Room

20 nos Delivery: 120 days
#59

Tube lights T8 Daylight 850 5000K Cool Day Light in Workshop Stores Etc

Tube lights T8 Daylight 850 5000K Cool Day Light in Workshop Stores Etc

20 nos Delivery: 120 days
#60

Tube T5 F8 W 29

Tube T5 F8 W 29

10 nos Delivery: 120 days
#61

Tubelight TL D 18 W 830 Warm White

Tubelight TL D 18 W 830 Warm White

50 nos Delivery: 120 days
#62

415V 32A ABB 332 6 3P plus E sockets with plugs for Hazardous area

415V 32A ABB 332 6 3P plus E sockets with plugs for Hazardous area

2 nos Delivery: 120 days
#63

415V 63A ABB 363 6 3P plus E socket with plugs for Hazardous area

415V 63A ABB 363 6 3P plus E socket with plugs for Hazardous area

2 nos Delivery: 120 days
#64

415V 125A ABB 3125 6 3P plus E socket with plugs for Hazardous area

415V 125A ABB 3125 6 3P plus E socket with plugs for Hazardous area

2 nos Delivery: 120 days
#65

Cabin cool day 4 pin CFL OSRAM DULUX D E 18W 865 HQ0298

Cabin cool day 4 pin CFL OSRAM DULUX D E 18W 865 HQ0298

50 nos Delivery: 120 days
#66

Weather deck CFL PHILIPS MASTER PL S 7W 830 2P

Weather deck CFL PHILIPS MASTER PL S 7W 830 2P

20 nos Delivery: 120 days
#67

Cabin warm white 2 Pin CFL GE LONG LAST BIAX D 18 W G24d 2

Cabin warm white 2 Pin CFL GE LONG LAST BIAX D 18 W G24d 2

20 nos Delivery: 120 days
#68

tube osram vialox nav son t 400w super 4y1768 for 400 w halogen flood light

tube osram vialox nav son t 400w super 4y1768 for 400 w halogen flood light

10 nos Delivery: 120 days
#69

bilge bulb osram classic 57 w 240 v screw type holder

bilge bulb osram classic 57 w 240 v screw type holder

30 nos Delivery: 120 days
#70

bunk light tube 8w standard iec 60081

bunk light tube 8w standard iec 60081

30 nos Delivery: 120 days
#71

halogen lamp tube 240 v 400w c 658 osram 64740

halogen lamp tube 240 v 400w c 658 osram 64740

10 nos Delivery: 120 days
#72

Lamp 24W QT9 G4 BASE TYPE

Lamp 24W QT9 G4 BASE TYPE

5 nos Delivery: 120 days
#73

starter philips s2

starter philips s2

100 nos Delivery: 120 days
#74

Bunk Light Ballast Phillips HF Matchbox Blue 124 SH TL TL5 PLL 9137004179

Bunk Light Ballast Phillips HF Matchbox Blue 124 SH TL TL5 PLL 9137004179

20 nos Delivery: 120 days
#75

Galley Ballast HELVAR L 36 A T 230V

Galley Ballast HELVAR L 36 A T 230V

20 nos Delivery: 120 days
#76

selector switch with knobs ss c2a2g 02 404

selector switch with knobs ss c2a2g 02 404

10 nos Delivery: 120 days
#77

Illuminated Selector switch 2 pos 1NO NC LED 24V Yellow

Illuminated Selector switch 2 pos 1NO NC LED 24V Yellow

10 nos Delivery: 120 days
#78

Illuminated Selector switch 2 pos 1NO NC LED 24V RED

Illuminated Selector switch 2 pos 1NO NC LED 24V RED

10 nos Delivery: 120 days
#79

Selector switch with knobs zb4bk1263

Selector switch with knobs zb4bk1263

10 nos Delivery: 120 days
#80

Selector switch with knobs cg8 a477 600e

Selector switch with knobs cg8 a477 600e

10 nos Delivery: 120 days
#81

Selector switch with knobs cg8 a214 600e f273

Selector switch with knobs cg8 a214 600e f273

10 nos Delivery: 120 days
#82

selector switch with knobs cg8 a201 ve21

selector switch with knobs cg8 a201 ve21

10 nos Delivery: 120 days
#83

selector switch 2pos xb4bd25

selector switch 2pos xb4bd25

10 nos Delivery: 120 days
#84

selector switch with knobs cg8 a004 624e f77 8

selector switch with knobs cg8 a004 624e f77 8

10 nos Delivery: 120 days
#85

selector switch with knobs oom 02433

selector switch with knobs oom 02433

10 nos Delivery: 120 days
#86

selector switch with knobs oom 02434

selector switch with knobs oom 02434

10 nos Delivery: 120 days
#87

selector switch with knobs oom 02524

selector switch with knobs oom 02524

10 nos Delivery: 120 days
#88

selector switch with knobs ssk c2pc56t2 7013

selector switch with knobs ssk c2pc56t2 7013

10 nos Delivery: 120 days
#89

selector switch with knobs oom 02311

selector switch with knobs oom 02311

10 nos Delivery: 120 days
#90

Push buttons with 02 additional auxiliary contacts pba mp1 42r 11

Push buttons with 02 additional auxiliary contacts pba mp1 42r 11

10 nos Delivery: 120 days
#91

Push Buttons with 02 additional Auxiliary contacts PBA CP1 10B 11

Push Buttons with 02 additional Auxiliary contacts PBA CP1 10B 11

10 nos Delivery: 120 days
#92

Push Buttons with 02 additional Auxiliary contacts XB4BW33B5 Illumination PB

Push Buttons with 02 additional Auxiliary contacts XB4BW33B5 Illumination PB

10 nos Delivery: 120 days
#93

Double Illumination Push button 230V Ac ZB4BW7A37417

Double Illumination Push button 230V Ac ZB4BW7A37417

10 nos Delivery: 120 days
#94

Push Buttons with 02 additional Auxiliary contacts XB4BW34B5 Illumination PB

Push Buttons with 02 additional Auxiliary contacts XB4BW34B5 Illumination PB

10 nos Delivery: 120 days
#95

Push Buttons with 02 additional Auxiliary contacts PBA MP1 42G 11

Push Buttons with 02 additional Auxiliary contacts PBA MP1 42G 11

10 nos Delivery: 120 days
#96

Indication Lamps XB4BVB5 LED Signal Lamp 24 V Yellow

Indication Lamps XB4BVB5 LED Signal Lamp 24 V Yellow

10 nos Delivery: 120 days
#97

Indication Lamps XB4BV5B1 Signal Lamp LED 400V White

Indication Lamps XB4BV5B1 Signal Lamp LED 400V White

10 nos Delivery: 120 days
#98

Indication Lamps XB4BVM1 SIGNAL LAMP 230V W LED White

Indication Lamps XB4BVM1 SIGNAL LAMP 230V W LED White

10 nos Delivery: 120 days
#99

Indication Lamps XB4BVB4 Signal Lamp LED 24V Red

Indication Lamps XB4BVB4 Signal Lamp LED 24V Red

10 nos Delivery: 120 days
#100

Indication Lamps XB4BVB3 Signal Lamp LED 24V Green

Indication Lamps XB4BVB3 Signal Lamp LED 24V Green

10 nos Delivery: 120 days
#101

Indication Lamps XB4BVB1 Signal Lamp LED 24V Green

Indication Lamps XB4BVB1 Signal Lamp LED 24V Green

10 nos Delivery: 120 days
#102

Red glass Shade of H70B0

Red glass Shade of H70B0

10 nos Delivery: 120 days
#103

Telephone patch cord cable RJ 11 10 mtrs

Telephone patch cord cable RJ 11 10 mtrs

5 nos Delivery: 120 days
#104

3 PIN Plug 06 AMPS

3 PIN Plug 06 AMPS

50 nos Delivery: 120 days
#105

3 PIN Plug 15 AMPS

3 PIN Plug 15 AMPS

50 nos Delivery: 120 days
#106

Fuse 16 A Siemens

Fuse 16 A Siemens

20 nos Delivery: 120 days
#107

Single Phase Protection Relay SPG D2

Single Phase Protection Relay SPG D2

3 nos Delivery: 120 days
#108

BCH Contactor

BCH Contactor

3 nos Delivery: 120 days
#109

Reflective Tapes RED GREEN BLUE YELLOW AND WHITE

Reflective Tapes RED GREEN BLUE YELLOW AND WHITE

2 nos Delivery: 120 days
#110

Oil Sample Bottle

Oil Sample Bottle

10 nos Delivery: 120 days
#111

Funnel

Funnel

5 nos Delivery: 120 days
#112

Pcb Anti Static Cover

Pcb Anti Static Cover

50 nos Delivery: 120 days
#113

Battery Caps

Battery Caps

50 nos Delivery: 120 days
#114

LED Torch

LED Torch

20 nos Delivery: 120 days
#115

Thermometer Wet and Dry

Thermometer Wet and Dry

2 nos Delivery: 120 days
#116

Tool Bag Stanley

Tool Bag Stanley

15 nos Delivery: 120 days
#117

Red LED Bulb

Red LED Bulb

10 nos Delivery: 120 days
#118

Flexible Metallic Conduits

Flexible Metallic Conduits

150 mtrs Delivery: 120 days
#119

Rubber Insulation Tape

Rubber Insulation Tape

20 nos Delivery: 120 days
#120

MCBs 32A D curve

MCBs 32A D curve

5 nos Delivery: 120 days
#121

Double Poled surface mounted indication light orange colour

Double Poled surface mounted indication light orange colour

10 nos Delivery: 120 days
#122

Double pole switch 15 A two way switches of conference room

Double pole switch 15 A two way switches of conference room

5 nos Delivery: 120 days
#123

Tube Light Phillips Master TL D 15W 840 Washroom Tubelight

Tube Light Phillips Master TL D 15W 840 Washroom Tubelight

20 nos Delivery: 120 days
#124

Starter philips s10

Starter philips s10

40 nos Delivery: 120 days
#125

Rittal Rack filter along with filter mat

Rittal Rack filter along with filter mat

10 nos Delivery: 120 days
#126

Hydraulic bearing puller

Hydraulic bearing puller

1 nos Delivery: 120 days
#127

Teflon Tape

Teflon Tape

25 nos Delivery: 120 days
#128

Jubilee Clip

Jubilee Clip

20 nos Delivery: 120 days
#129

Mini circuit breaker pkzm 0 16 t

Mini circuit breaker pkzm 0 16 t

5 nos Delivery: 120 days
#130

Miniatur circuit breaker faz c6 1

Miniatur circuit breaker faz c6 1

5 nos Delivery: 120 days
#131

Manual auto selector switch start stop selector switch

Manual auto selector switch start stop selector switch

2 nos Delivery: 120 days
#132

Miniature circuit breaker f3

Miniature circuit breaker f3

2 nos Delivery: 120 days
#133

OS63GD12P switch fuse 63 a

OS63GD12P switch fuse 63 a

2 nos Delivery: 120 days
#134

MS132 12 mm starter 8 point 0 to 12 point 0 a

MS132 12 mm starter 8 point 0 to 12 point 0 a

1 nos Delivery: 120 days
#135

MS132 25t mm starter 20 to 25 a

MS132 25t mm starter 20 to 25 a

1 nos Delivery: 120 days
#136

MS132 16t mm starter 10 to 16 a

MS132 16t mm starter 10 to 16 a

1 nos Delivery: 120 days
#137

Mini circuit breaker pkzm 0 10 t

Mini circuit breaker pkzm 0 10 t

2 nos Delivery: 120 days
#138

Mini circuit breaker pkzm 0 16 t

Mini circuit breaker pkzm 0 16 t

2 nos Delivery: 120 days
#139

Circuit breaker 16a 202m b16

Circuit breaker 16a 202m b16

2 nos Delivery: 120 days
#140

Circuit breaker 10a s202m b10

Circuit breaker 10a s202m b10

2 nos Delivery: 120 days
#141

Circuit breaker 4a s202m b4

Circuit breaker 4a s202m b4

2 nos Delivery: 120 days
#142

Selector switch

Selector switch

2 nos Delivery: 120 days
#143

Power supply unit

Power supply unit

2 nos Delivery: 120 days
#144

Circuit breaker

Circuit breaker

2 nos Delivery: 120 days
#145

Flip flop on off switch

Flip flop on off switch

5 nos Delivery: 120 days
#146

Thermal Paper Navtex receiver NX 700 A B type TP058 30CL Code No 000 154 047

Thermal Paper Navtex receiver NX 700 A B type TP058 30CL Code No 000 154 047

50 rolls Delivery: 120 days
#147

Inmarsat C printer paper roll

Inmarsat C printer paper roll

10 rolls Delivery: 120 days
#148

FUSE 1A

FUSE 1A

5 nos Delivery: 120 days
#149

FUSE 2A

FUSE 2A

5 nos Delivery: 120 days
#150

FUSE 3A

FUSE 3A

5 nos Delivery: 120 days
#151

FUSE 5A

FUSE 5A

5 nos Delivery: 120 days
#152

FUSE 10A

FUSE 10A

5 nos Delivery: 120 days
#153

FUSE 20A

FUSE 20A

5 nos Delivery: 120 days
#154

ETHERNET OPTICAL FIBER PATH CODE 1 M

ETHERNET OPTICAL FIBER PATH CODE 1 M

2 nos Delivery: 120 days
#155

ETHERNET OPTICAL FIBER PATH CODE 1 point 5 M

ETHERNET OPTICAL FIBER PATH CODE 1 point 5 M

2 nos Delivery: 120 days
#156

ETHERNET OPTICAL FIBER PATH CODE 2 M

ETHERNET OPTICAL FIBER PATH CODE 2 M

2 nos Delivery: 120 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer