TenderDekho Logo
Closed GEM

Indian Army Damper Shimmy Cabin Spare Parts Tender Chamoli Uttarakhand 2026

Bid Publish Date

11-Aug-2026, 8:43 pm

Bid End Date

24-Aug-2026, 9:00 pm

Progress

Issue11-Aug-2026, 8:43 pm
AwardPending

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for a comprehensive supply and services package covering 18 distinct items — including damper shimmy cabin shock absorbers, belts, fuel filters, suspension bush sets, recovery bottles and related assemblies — for deployment in CHAMOLI, UTTARAKHAND. The scope encompasses supply, installation, testing, commissioning and operator training, with potential statutory clearances where applicable. The contract requires bulk readiness with a single primary product value consideration in bunch bids, and offers inspection at seller premises or consignee site. A pre-approval sample process applies post-award, with a 5-day window for submission and Buyer-led modification responses. Tenderers must meet government supply experience and documentation requirements.

Technical Specifications & Requirements

  • 18 total line items in the BOQ, covering: damper shimmy cabin shock absorbers, T-case mounting, fan body, fan pulleys, fan assembly, rocker assembly, injector assemblies, glow plug BERU, timing belt and tensioner, alternator belt, power steering belt, front-side ABS pipe, idler pulley assemblies, fuel filter assemblies (3-pin, 2-pin), suspension bush set, and recovery bottle.
  • Scope of supply includes Installation, Testing, Commissioning and Operator Training; potential statutory clearances if applicable.
  • Pre-dispatch inspection option at seller premises; post-receipt inspection at consignee site by nominated inspection agency.
  • Advance sample submission within 5 days of contract award; buyer to approve or specify modifications within 5 days; bulk supply to follow the approved sample.
  • No technical specifications published; emphasis on compliance with practical delivery and integration into armed forces platforms.

Terms, Conditions & Eligibility

  • EMD: Not disclosed in the provided data; bidders should expect conventional government EMD practices.
  • Experience: Bidder or OEM (direct or via reseller) must have regularly manufactured and supplied similar category products to central/state government or PSU for 1 year prior to bid opening; include contracts specifying quantities across each year.
  • Documentation: PAN Card, GSTIN, cancelled cheque, EFT mandate; organization-grade certificates may be required.
  • Inspection: Pre-dispatch and post-receipt inspection options; nominated inspection agency as per ATC.
  • Sample clause: Advance sample submission within 5 days; potential modifications and no-LD delay if Buyer delays approval; otherwise termination possible for major deviations.
  • Delivery scope: Supply, installation, testing, commissioning and operator training; compliance with all contract specifications.
  • Additional: Not otherwise specified in the provided tender data; bidders should plan for standard government procurement conditions and OEM authorisation if applicable.

Key Specifications

  • Total BOQ items: 18

  • Scope: Supply, Installation, Testing, Commissioning, Operator Training

  • Inspection: Pre-dispatch at seller premises; Post-receipt at consignee site

  • Advance sample: submission within 5 days of contract award; 5-day modification window

  • Sample acceptance impacts bulk delivery timeline; non-conformance may trigger contract termination

  • No explicit technical performance specs published; emphasis on alignment with general government procurement standards

  • Experience criteria: 1 year prior govt/PSU supply of similar category products

Terms & Conditions

  • EMD amount and exact percentage not disclosed; bidders should verify applicable EMD rules

  • Experience: OEM or authorized reseller with govt/PSU supply history for 1 year

  • Delivery scope includes installation, testing, commissioning and operator training; statutory clearances if required

Important Clauses

Payment Terms

Not explicitly stated; standard government terms to be expected for supply, installation, testing and commissioning with milestone payments after inspection acceptance

Delivery Schedule

Bulk supply contingent on advance sample approval; delivery period may be adjusted if buyer delays sample approval; no LD during buyer-caused delays

Penalties/Liquidated Damages

Not detailed in provided data; contract may include LDs as per standard government procurement norms

Bidder Eligibility

  • 1 year govt/PSU supply experience for similar category products

  • OEM or authorised reseller status

  • Submission of PAN, GSTIN, cancelled cheque and EFT mandate

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

40

Category

ALTERNATOR BELT

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

20 %

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

DAMPER SHIMMY CABIN SHOCK ABSORBER , T CASE MOUNTING , FAN BODY , FAN PULLEY , FAN ASSY , ROCKER ASSY , ASSY INJECTOR , GLOW PLUG BERU , TIMING BELT , ALTERNATOR BELT , POWER STEERING BELT , TIMING TENSIONER , FRONT SIDE TO ABS PIPE , IDLER PULLEY ASSY , ASSY FUEL FILTER 3 PIN , ASSY FUEL FILTER 2 PIN , SUSPENSION BUSH SET , RECOVERY BOTTLE

Delivery Details

Max Delivery Days

21

Delivery Locations

1

Delivery Cities

Chamoli

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-ChamoliChamoli--221-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9741619.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 18 Items Sign in for GEM prices

#1

DAMPER SHIMMY CABIN SHOCK ABSORBER

DAMPER SHIMMY CABIN SHOCK ABSORBER

2 nos Delivery: 21 days
#2

T CASE MOUNTING

T CASE MOUNTING

2 nos Delivery: 21 days
#3

FAN BODY

FAN BODY

1 nos Delivery: 21 days
#4

FAN PULLEY

FAN PULLEY

1 nos Delivery: 21 days
#5

FAN ASSY

FAN ASSY

1 nos Delivery: 21 days
#6

ROCKER ASSY

ROCKER ASSY

16 nos Delivery: 21 days
#7

ASSY INJECTOR

ASSY INJECTOR

4 nos Delivery: 21 days
#8

GLOW PLUG BERU

GLOW PLUG BERU

3 nos Delivery: 21 days
#9

TIMING BELT

TIMING BELT

1 nos Delivery: 21 days
#10

ALTERNATOR BELT

ALTERNATOR BELT

1 nos Delivery: 21 days
#11

POWER STEERING BELT

POWER STEERING BELT

1 nos Delivery: 21 days
#12

TIMING TENSIONER

TIMING TENSIONER

1 nos Delivery: 21 days
#13

FRONT SIDE TO ABS PIPE

FRONT SIDE TO ABS PIPE

1 nos Delivery: 21 days
#14

IDLER PULLEY ASSY

IDLER PULLEY ASSY

1 nos Delivery: 21 days
#15

ASSY FUEL FILTER 3 PIN

ASSY FUEL FILTER 3 PIN

1 nos Delivery: 21 days
#16

ASSY FUEL FILTER 2 PIN

ASSY FUEL FILTER 2 PIN

1 nos Delivery: 21 days
#17

SUSPENSION BUSH SET

SUSPENSION BUSH SET

1 nos Delivery: 21 days
#18

RECOVERY BOTTLE

RECOVERY BOTTLE

1 nos Delivery: 21 days

Categories 17

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid for damper and belt tender in Chamoli Uttarakhad 2026?

Bidders must meet eligibility: 1 year govt/PSU supply experience for similar items, provide PAN, GSTIN, cancelled cheque, EFT mandate, and OEM authorisation if applicable. Prepare 18 item BOQ details, and submit samples within 5 days of award for prior approval. Ensure installation, testing and training scope is clear in bid.

What documents are required for Indian Army Chamoli tender submission 2026?

Submit PAN, GSTIN, cancelled cheque, EFT mandate certified by bank, and experience certificates showing contracts for similar items with quantities. Include OEM authorisation if bidding via reseller and technical bid documents demonstrating compliance with scope: supply, installation, testing, commissioning, and training.

What is the delivery scope for supply and installation of parts?

Delivery scope includes supply, installation, testing, commissioning and operator training. Advance sample approval is mandatory within 5 days of award; bulk supply follows only after acceptance of the approved sample, with potential timeline adjustments if approvals are delayed.

What are the inspection steps for this Indian Army tender in Chamoli?

Inspection may occur pre-dispatch at the seller premises or post-receipt at the consignee site. A nominated inspection agency will conduct inspections. Ensure readiness for pre-dispatch inspection if ATC selects it; non-conformance could affect bulk supply and acceptance.

What are the key qualifying experience requirements for bidders?

Bidder or OEM must have regularly manufactured and supplied similar category products to govt/PSU for 1 year before bid opening. Provide copies of relevant contracts showing quantities delivered in each year; primary product in bunch bids must meet criterion.

Which items are included in the 18 BOQ line items for this tender?

The 18 items cover damper shimmy cabin shock absorbers, T-case mounting, fan body, fan pulley, fan assembly, rocker assembly, injector assemblies, glow plug BERU, timing belt & tensioner, various belts, ABS pipe, idler pulley assemblies, fuel filters (3-pin and 2-pin), suspension bush set, and recovery bottle.

What is the expected scope of sample submission and approval process?

Within 5 days of contract award, submit advance samples for buyer approval. If modifications are requested, provide revised samples; approvals or modification lists come within 5 days. Delays by the buyer may extend the delivery period without LD; major deviations may trigger contract termination.

What does the terms clause imply about penalties and LDs?

Exact LD terms are not detailed in the provided data, but contracts typically include LDs for late delivery or non-conformance. Be prepared to meet milestone delivery after sample approval and ensure quality control to avoid penalties or termination.