TenderDekho Logo
GEM

Indian Army Taflon Roller, UPS 1 KVA, NVME SSD 1TB, Fuser Unit Tender 2025

Bid Publish Date

14-Nov-2025, 10:53 pm

Bid End Date

25-Nov-2025, 9:00 am

Progress

Issue14-Nov-2025, 10:53 pm
Technical15-11-2025 20:56:34
Financial
AwardCompleted
Explore all 3 tabs to view complete tender details

Quantity

19

Key Highlights

  • Specific brand/OEM requirements: Functional Service Centre in each consignee state; establishment within 30 days if not present
  • Technical certifications/standards: Not specified in tender data
  • Special clauses: Option clause enabling ±25% quantity variation, delivery-time formula with minimum 30 days
  • Eligibility criteria: Establish viable service infrastructure; deliver across multiple states
  • Warranty/AMC: Carry-in vs on-site warranty terms; service availability requirement
  • Penalties/Performance bonds: Not explicitly stated in data
  • Delivery requirements: Delivery period linked to last date of original delivery order; extended delivery times possible
  • Delivery locations: Multiple consignee states; service centres required in each

Categories 9

Tender Overview

The Indian Army, Department of Military Affairs, invites bid for a diversified set of hardware components across 13 items, including Taflon Roller, UPS 1 KVA, HDD 1TB, OPC Drum, Fuser Unit, Image Unit, Head, Wastage Paid, Keyboard, NVME SSD 1TB, Leaser Unit HP, and Motor Steeper. Estimated value and EMD are not disclosed, with a broad procurement scope across multiple printer/office equipment sub-systems. The contract is governed by an option clause allowing ±25% quantity variation and extended delivery under contracted rates, starting from the original delivery order date. A key differentiator is the requirement to establish or prove a functional service centre in each consignee state within 30 days of award. Tender in India for military equipment procurement emphasizes reliability and rapid deployment.

Technical Specifications & Requirements

  • No explicit technical specifications are provided in the tender data.
  • BOQ lists 13 items with names such as Taflon Roller, NVME SSD 1TB, Fuser Unit, OPC Drum, Image Unit, and other printer/laser components.
  • Service-centre requirement: existing or to-be-established in each consignee state; on-site warranty exemptions noted if applicable.
  • Option clause permits quantity adjustments up to 25% during and after contracting, with a delivery-time calculation formula.
  • Delivery schedule is linked to last date of original delivery order; minimum additional time is 30 days.
  • Payment release contingent on documentary evidence of functional Service Centre.

Terms, Conditions & Eligibility

  • EMD amount not disclosed in the data; bidders must comply with standard security deposit terms.
  • Quantity variations of up to 25% permitted; delivery time adjusted by a formula, with a minimum 30-day extension.
  • Service Centre requirement: establish in 30 days post-award if not pre-existing; payment tied to documentary proof.
  • Carry-in warranty condition applies only if not on-site warranty; service availability across multiple states is required.
  • The Buyer-added ATC emphasizes delivery periods and extended timelines; compliance is mandatory.

Key Specifications

  • Product/service names: Taflon Roller, UPS 1 KVA, HDD 1TB, OPC Drum, Fuser Unit, Image Unit, Head, Wastage Paid, Keyboard, Fuser Roller, NVME SSD 1TB, Leaser Unit HP, Motor Steeper

  • Quantities/values: Not disclosed; 13 total items in BOQ

  • EMD/Estimated value: Not disclosed in data

  • Experience: Not specified; service-centre capability required

  • Quality/standards: On-site vs carry-in warranty terms; general compliance with service capability

Terms & Conditions

  • Option clause permits ±25% quantity variation during and after contract

  • Delivery time calculated by formula; minimum extension 30 days

  • Functional Service Centre must exist in each consignee state or be established within 30 days

  • Payment release contingent on documentary evidence of service capability

  • Delivery scope covers 13 listed hardware items

Important Clauses

Payment Terms

Payment shall be released after submission of documentary evidence of functional Service Centre; no explicit milestone schedule provided

Delivery Schedule

Delivery period commences from last date of original delivery order; option clause may extend time with a calculated extra duration

Penalties/Liquidated Damages

Not explicitly specified; implied adherence to delivery timelines and service readiness

Bidder Eligibility

  • Functional service capability in each consignee state's geography

  • Ability to establish or demonstrate service centres within 30 days of award

  • Compliance with option-clause delivery extensions and warranty terms

Documents 5

GeM-Bidding-8592510.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

DVD RW Slim,smps,HDD 1 TBB Seadate,Combo Wired Keyboard and Mouse,UPS 1 KVA,UPS 600 KVA,Monitor 19

Indian Army

Posted: 23 November 2024
Closed: 14 December 2024
GEM

FUSER ASSY,DRUM UNIT,BTY 12V 7AH,UPS 1 KVA,KEYBOARD AND MOUSE

Indian Army

RAJAURI, JAMMU & KASHMIR

Posted: 5 January 2025
Closed: 27 January 2025
GEM

Indian Army Pressure Roller, Teflon Sileve, Fuser Unit Assy, Ink Pump Tender 2025 India

Indian Army

GURDASPUR, PUNJAB

Posted: 22 November 2025
Closed: 2 December 2025
GEM

FUSER UNIT,CLEANING PLATE BLADE,OPC DRUM PHOTO COPY HOLDER,PRESSURE ROLLER HP 1020,DRUM,TEFLON SLEE

Indian Army

BATHINDA, PUNJAB

Posted: 17 January 2025
Closed: 7 February 2025
GEM

Indian Army Procurement Tender East Sikkim Image Drum Unit Accessories and Peripherals 2025

Indian Army

EAST SIKKIM, SIKKIM

Posted: 19 October 2025
Closed: 30 October 2025
GEM

Bill of Quantities (BOQ) 13 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Taflon Roller IT 2 nos wkspoffr866 15
2 UPS 1 KVA IT 1 nos wkspoffr866 15
3 HDD 1TB IT 1 nos wkspoffr866 15
4 OPC Drum IT 1 nos wkspoffr866 15
5 Fuser Unit IT 1 nos wkspoffr866 15
6 Image Unit IT 1 nos wkspoffr866 15
7 Head IT 4 nos wkspoffr866 15
8 Wastage Paid IT 1 nos wkspoffr866 15
9 Keyboard IT 2 nos wkspoffr866 15
10 Fuser Roller IT 2 nos wkspoffr866 15
11 NVME SSD 1TB IT 1 nos wkspoffr866 15
12 Leaser Unit HP IT 1 nos wkspoffr866 15
13 Motor Steeper IT 1 nos wkspoffr866 15

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar hardware procurements

4

Financial statements (latest audited)

5

EMD/Security deposit documents (as applicable per terms)

6

Technical bid documents and compliance certificates

7

OEM authorizations or authorized dealer certificates

8

Evidence of functional Service Centre or plan to establish within 30 days of award

Technical Results

S.No Seller Item Date Status
1M/S SHAHEEN ENTERPRISES   Under PMA-15-11-2025 20:56:34Qualified
2MIR AND COMPANY   Under PMA-15-11-2025 12:15:45Qualified
3MS FIRDOUS BROTHERS   Under PMA-18-11-2025 11:44:39Qualified
4NAVKAR INFOMEDIA   Under PMA-24-11-2025 16:59:02Disqualified

Financial Results

Rank Seller Price Item
L1M/S SHAHEEN ENTERPRISES   Under PMA₹97,030Item Categories : Taflon Roller,UPS 1 KVA,HDD 1TB,OPC Drum,Fuser Unit,Image Unit,Head,Wastage Paid,Keyboard,Fuser Rol
L2MIR AND COMPANY   Under PMA₹1,50,110Item Categories : Taflon Roller,UPS 1 KVA,HDD 1TB,OPC Drum,Fuser Unit,Image Unit,Head,Wastage Paid,Keyboard,Fuser Rol
L3MS FIRDOUS BROTHERS   Under PMA₹2,42,448Item Categories : Taflon Roller,UPS 1 KVA,HDD 1TB,OPC Drum,Fuser Unit,Image Unit,Head,Wastage Paid,Keyboard,Fuser Rol

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for Indian Army Taflon Roller and related hardware tender 2025?

Bidders must submit GST registration, PAN, experiência certificates, financials, and EMD documents, plus OEM authorization. Ensure a functional service centre plan for each consignee state; comply with the 25% quantity variation option and the delivery-time formula. The ATC requires evidence of service capability before payment release.

What documents are required for Indian Army hardware tender submission in 2025?

Submit GST certificate, PAN card, latest audited financial statements, experience certificates for similar procurements, EMD/security deposit proof, technical bid documents, OEM authorizations, and evidence of established or planned service centres in consignee states within 30 days of award.

What are the delivery terms for the Indian Army equipment tender 2025?

Delivery starts from the last date of the original delivery order; a 25% quantity variation is allowed, with delivery-time extended by the formula: (Additional quantity ÷ Original quantity) × Original delivery period, min 30 days, extendable to original period at buyer's option.

What are the service-centre requirements for the Indian Army procurement?

Bidder must have a functional Service Centre in each consignee state's location; if not existing, establish within 30 days of award. Payment will be released only after documentary evidence of such service capability is provided.

Which items are included in the BOQ for the Indian Army tender 2025?

Thirteen items are listed, including Taflon Roller, UPS 1 KVA, NVME SSD 1TB, HDD 1TB, OPC Drum, Fuser Unit, Image Unit, Head, Wastage Paid, Keyboard, Fuser Roller, Leaser Unit HP, and Motor Steeper.

What is the significance of the option clause in this Army tender?

The option clause allows ±25% quantity adjustments during contract placement and currency, with delivery-time recalculated using the specified formula, ensuring flexibility to scale orders while maintaining contracted rates.

Are carry-in or on-site warranties specified for this tender?

The tender distinguishes carry-in versus on-site warranty; service availability across states is required, with on-site warranty exempting service-centre constraints in some cases, and documentation must reflect the chosen warranty arrangement.

What is the expected timeline to establish service centres after award?

A functional Service Centre must be established in each consignee state's location within 30 days of award, with documentary evidence submitted to trigger payment release and contract compliance.